I am an accomplished Engineer with over 11 years of work experience in Oil Refinery, Steel Mills and Power Plant. I have worked on different projects including design and commissioning of 11kV substations, 132kV AIS Bay with 40MVA power transformer. backup diesel gensets, etc. I have managed to increase productivity of my team by carrying out trainings and performing RCA (Root Cause Analysis). I have implemented measures to reduce downtime of the plant and managed cost savings by efficiently planning and organizing operations and maintenance activities. I have a good command of tools including ETAP and AutoCAD. I look forward for an opportunity to showcase my skills in your organization.
- Masters Electrical Engineering
- Bachelors Electrical Engineering
- Masters Business Management
- Electrical Design
- Project Planning
- ETAP
- AutoCAD
- PVSyst
- Plant maintenance
- Team leader
- Troubleshooting
- Management
- High Voltage (HV) & Medium Voltage (MV) maintenance
- Substation design
1- Lucky Energy Private Limited:
I have joined this company in August 2022 and working here presently. I am looking after operations and maintenance of the power house comprising of Jenbacher gas engines and Cummins Diesel engines.
2- Aisha Steel Mills Limited:
I joined Aisha Steel Miils Limited in June 2019 and resigned in August 2022. Initially I joined here as Deputy Manager Electrical & Instrumentation and was promoted to the position of Manager after an year. I was looking after the maintenance and operation of the 132kV grid station, 11kV and 400V substations and their associated auxiliaries. Furthermore I was assigned to look after the maintenance of Continuous Galvanizing Line (CGL) electrical and instrumentation activities.
3- National Refinery Limited:
I joined National Refinery Limited in May 2012 and worked there till June 2019. I started my career here working as a trainee engineer looking after the plant electrical distribution system of 11kV & 6kV with low voltage equipment of 400V also. Furthermore, I was assigned position of power house operations engineer for a period of 6 months. Later, I was transferred to projects department where I looked after the electrical design and installation of 400M USD project of Isomerization and Diesel Hydrotreating Plant, involving both high and medium voltage distribution and installations. I resigned from National Refinery Limited from the position of Manager Maintenance Electrical & Instrumentation.
My interests include going to gym, visiting new places, cooking different foods for my self and family, going for lunch and dinner with family, shopping, playing games on playstation, driving, watching movies, etc