CV, 20 years experience, Algerian QA and QC Manager looking worldwide

Available
Serial No: 16841
Skills keywords: 
Current location:  Tizi Ouzou, Algeria - View on map
Nationality: Algerian
Spoken languages: Arabic, english, french

EXPERIENCE:

June 11th 2013 – October 11th 2014 CALIMET LABORATORY Algeria

Job title:

– General Manager

Responsibilities:

– Managing and Development of Commercial Department

– Managing Calibration & Verification of Instrument Team

– Managing Welding Inspection & NDT Team

– Managing Expertise & Regulatory Control APL, APVG & APE Team

– Managing of Marketing Department

November 08th 2005 – December 01st 2013 EPPM Tunisia “Engineering Procurement & Project Management”

Job title:

– Responsible Management and Quality Control of all activities (Civil, Mechanical, Piping, Electrical …) in EPPM’s projects

– Responsible to prepare the final dossier of the EPC’s projects and submit them to client (SONATRACH)

– Responsible of the relation between EPPM and ministry of energy of Algeria (DPP/ARH-DMI)

– Responsible to prepare the preliminary and final dossier of the facilities and submit to DPP/ARH-DMI (ministry of energy of Algeria- Authority of Regulation Hydrocarbon)

– Responsible of the relation between EPPM and CTC (Technical Control of Construction)

– Managing Welding Inspection & NDT Team

– Managing Expertise & Regulatory Control APL, APVG & APE Team

Projects title:

– Engineering, Procurement, Construction and Revamping of flaring system in Hassi Messaoud, Algeria (60M€)

– Engineering, Procurement & Construction of two oily water separation plants in Oued Noumer & Ait El Khir in Ghardaïa Algeria (35M€)

– Engineering, Procurement and Construction of two oil and air plants at satellites OMP 53 and OMN77 in Hassi Messaoud Algeria (25M€) –

– Engineering Procurement and Erection of Loading arm in CINA Hassi Messaoud Algeria (20M€)

– Setting-up of a new pumping station and a filtration unit at CIS zone, dedicated to pump treated oily-water through fiberglass pipe (22 Km/12’’) in Hassi Messaoud Algeria (25M€)

– – Engineering, Fabrication and supply of 50 sand traps erected on skids with needed accessories for connection and erection on wells – feeding units with Gas-Lift at Hassi Messaoud (20M€)

– Engineering, Construction & Procurement of twenty five Manifolds erected on skid with the accessories on connecting networks of oil collection at HASSI-MESSAOUD (18M€)

– Revamping, Maintenance, Operation follow up and the control of treated water quality in three oily water plants of Haoudh Barkaoui (27M€)

– Revamping, Maintenance, Exploitation follow up and the control of treated water quality in two oily water plants of CINA and CIS Hassi Messaoud in Algeria (30M€).

– Engineering Procurement Services and Project Management of flared gas recovery at ROM site To Hassi Berkine in Algeria.

Responsibilities handled during the project

 Elaborate the preliminary dossier and final dossier of the facilities subject to Algerian regulation

 Establish the final dossier of EPC projects

 Responsible in performing daily inspection and reporting as per approved inspection and test plan.

 Check daily if there any complaints to the approved Quality plan.

 Prepare the necessary documentation required for each job activity.

 Check and review Construction/installation sketch’s and or shop drawings.

 Check the work performed by the construction group in compliance to the approved drawing issued for construction, specification and standards.

 Monitoring of job site Quality control Inspection progress.

 Prepare monthly reports of QC activities

 Supervises the preparation of inspection plans and provide technical directions regarding determination and selection of QC inspection Hold points.

 Supervise and ensures the work of NDE laboratory or third party inspection is performed in accordance with established specification.

 Investigate the root case or NCR & repeated violations and report to the QA Manager for corrective action or preventive action.

 Preparation of status log for NCR, RFI, NTI & log book entries

 Responsible for take-0ff, welding requirements to be applied as ASME B31.3/B31.4/API1104/API650

 Monitor and verify that the work execution and implementation are as per approved procedures, approved specifications and approved drawings.

 Review of inspection and test plan, material verification, WPS&PQR Mechanical and chemical testing, all stage of final inspection.

 Preparing inspection sequence plans as per manufacturing schedule.

 Worked in Both Pipe Line as well as plant projects.

 Participated in-group discussion to resolve the project discrepancies as per the code and standard.

 Welder Qualification test as per project requirement

 Perform in process inspection such as material, lay out fit-up, visual and dimensional control of various pressure vessels, piping, and storage tanks etc. in accordance with latest revision drawings, applicable codes standards and required tolerance.

 Final dimensional and weld Visual inspection of pressure vessels, pipe spools, plates and tanks as per Clients approved fabrication drawings, Client inspection package and Quality plan.

 Prepare the consolidated inspection reports and co-ordination with other department’s client and vendor.

 Review of approved welding procedure, Qualification records and welding operators

 Witnessing and Monitoring NDT Test

 Witnessing of Repair Removal

 Inspection of on plot welding works

 Reviewed final disposition reports and as-built drawings.

 Review of projects scope of work, project specification, Drawings like pipe line alignment sheets, Isometric, P & I

 Conduct inspection of fabricated materials at yard prior to delivery to site.

 In Coming Material Inspection, with regards to the actual tractability against manufactures Certificate.

 Making of Audit cheek list and worked as a internal auditor

 Monitoring/surveillance of welders and welding activity

 Witnessing of PQR/WPS – Welder’s qualification test on Stainless steel. Carbon steels and alloy materials of various projects.

 Verify consumable storage, backing and its issue/control.

 Witnessing of pneumatic test for nozzle reinforcement pads.

 Witnessing weld overlay activities on shall seam joints, head joints, nozzle inside, etc.

 Witnessing of mechanical tests, like impact test for production test coupons and low temperature service vessels and code requirements

 Witnessing Hydro testing pneumatic test and vacuum test activities as per approved procedure and drawings required pressure and holding time.

 PWHT (Post weld heat treatment) and stress reliving chart as per approved procedure.

 Visual inspection and hydrostatic/pneumatic test witnessing of valves.

 Monitoring the survey of Trench, padding, backfilling, lowering of pipes, Pipe foundations, equipment foundations, RCC structure, Retaining walls, etc.

 Review of NDT procedures with respect to the project specification and standards.

 Arranging the NDT crew to the relevant jobs

 Liaise with the client and resolve the site issue

 Radiographic Film interpretation with reference to the standards and its approval with client.

 Performing other NDT activities and coordinate with the client and our management

 Able to make the material requisition for the consumable involved in NDT works.

 Conduct surface cleaning, painting and pre-shipment inspection.

 Verified surface preparation and painting activities for required anchor profile, surface finish and dry film thickness as per approved protective coating system and clients engineering standards. Verification of paint conducted against manufacturer’s acceptance criteria and monitoring of atmospheric/weather conditions during surface preparations and painting activity. Final visual inspection conducted on coated surface for any possible defect on material or coating.

 Verification and review inspection reports for submittal to client.

 Preparing final inspection reports and documents for client reference and approval, this might include, final dimensional reports, pressure test certificate(such as hydro, pneumatic, vacuum which ever required) Material traceability, as built drawings, NDT Certificates/charts and other pertinent documents required

 Preparing Tie-In Packages (metallic and non-metallic) and Hot Tap packages.

 Issuance of inspection release certificate and verification of shipping arrangement prior to dispatch of equipment.

 Meeting with DPP/ARH/DMI of Ouargla for Inspection and Hydrostatic test witness,

 Maintain the relationship with the Owner for the aspects relating to quality;

 Manage the Quality Plan;

 Coordinate the activities of the Inspectors of Quality control;

15 August 2005 – 07 November 2005: SGS Qualitest Algeria

Job title: Project Coordinator

Project title: SONATRACH / SONELGAZ Project Gazoduc Sougueur / Hadjeret Ennous 42” in Algeria

Contractor: STROYTRANSGAZ Russia

Responsibilities handled during the project

 Prepare the necessary documentation required for each job activity.

 Monitoring of job site Quality control Inspection progress.

 Coordinate the activities of the Inspectors of Quality control;

 Prepare monthly reports of QC activities

 Preparing inspection sequence plans as per manufacturing schedule.

 Prepare the consolidated inspection reports and co-ordination with other department’s client and vendor.

 Review of approved welding procedure, Qualification records and welding operators

 Making of Audit cheek list and worked as an internal auditor

 Maintain the relationship with the Owner for the aspects relating to quality;

 Manage the Quality Plan.

December 14th 2004 – August 18th 2005: FMC SOFEC Energy Systems USA

Job title: Engineer RMQ / QA-QC and RT Inspector Level II (In charge of Quality Control and Quality Management)

Project title: SPM “Pump Station – Project Bejaia “ in Algeria

Responsibilities handled during the project

 Prepare the necessary documentation required for each job activity.

 Check and review Construction/installation sketch’s and or shop drawings.

 Check the work performed by the construction group in compliance to the approved drawing issued for construction, specification and standards.

 Monitoring of job site Quality control Inspection progress.

 Prepare monthly reports of QC activities

 Supervises the preparation of inspection plans and provide technical directions regarding determination and selection of QC inspection Hold points.

 Supervise and ensures the work of NDE laboratory or third party inspection is performed in accordance with established specification.

 Investigate the root case or NCR & repeated violations and report to the QA Manager for corrective action or preventive action.

 Preparation of status log for NCR, RFI, NTI & log book entries

 Responsible for take-0ff, welding requirements to be applied as ASME B31.3/B31.4/API1104/API650

 Monitor and verify that the work execution and implementation are as per approved procedures, approved specifications and approved drawings.

 Review of inspection and test plan, material verification, WPS&PQR Mechanical and chemical testing, all stage of final inspection.

 Preparing inspection sequence plans as per manufacturing schedule.

 Participated in-group discussion to resolve the project discrepancies as per the code and standard.

 Welder Qualification test as per project requirement

 Perform in process inspection such as material, lay out fit-up, visual and dimensional control of various pressure vessels, piping, and storage tanks etc. in accordance with latest revision drawings, applicable codes standards and required tolerance.

 Final dimensional and weld Visual inspection of pressure vessels, pipe spools, plates and tanks as per Clients approved fabrication drawings, Client inspection package and Quality plan.

 Review of approved welding procedure, Qualification records and welding operators

 Witnessing and Monitoring NDT Test

 Reviewed final disposition reports and as-built drawings.

 Conduct inspection of fabricated materials at yard prior to delivery to site.

 In Coming Material Inspection, with regards to the actual tractability against manufactures Certificate.

 Monitoring/surveillance of welders and welding activity

 Verify consumable storage, backing and its issue/control.

 Witnessing of mechanical tests, like impact test for production test coupons and low temperature service vessels and code requirements

 Witnessing Hydro testing pneumatic test and vacuum test activities as per approved procedure and drawings required pressure and holding time.

 Visual inspection and hydrostatic/pneumatic test witnessing of valves.

 Monitoring the survey of Trench, padding, backfilling, lowering of pipes, Pipe foundations, equipment foundations, RCC structure, Retaining walls, etc.

 Review of NDT procedures with respect to the project specification and standards.

 Arranging the NDT crew to the relevant jobs

 Radiographic Film interpretation with reference to the standards and its approval with client.

 Performing other NDT activities and coordinate with the client and our management

 Able to make the material requisition for the consumable involved in NDT works.

 Conduct surface cleaning, painting and pre-shipment inspection.

 Verified surface preparation and painting activities for required anchor profile, surface finish and dry film thickness as per approved protective coating system and clients engineering standards. Verification of paint conducted against manufacturer’s acceptance criteria and monitoring of atmospheric/weather conditions during surface preparations and painting activity. Final visual inspection conducted on coated surface for any possible defect on material or coating.

 Verification and review inspection reports for submittal to client.

 Preparing final inspection reports and documents for client reference and approval, this might include, final dimensional reports, pressure test certificate(such as hydro, pneumatic, vacuum which ever required) Material traceability, as built drawings, NDT Certificates/charts and other pertinent documents required

 Preparing Tie-In Packages and Hot Tap packages.

 Issuance of inspection release certificate and verification of shipping arrangement prior to dispatch of equipment.

 Meeting with DPP/DMI of Bejaïa for Inspection and Hydrostatic test witness,

 Maintain the relationship with the Owner for the aspects relating to quality;

 Manage the Quality Plan;

 Coordinate the activities of the Inspectors of Quality control;

September 27th 2003 – December 10th 2004: Algerian company of Realization of the Industrial Projects (SARPI) SONATRACH-ABB detached with MITSUBICHI HEAVY INDUSTRY LTD (MHI Ltd) Japan

Job title: Engineer RMQ / QA-QC (In charge of Quality Control and Quality Management)

Project title: AEGR “Algeria-Edjeleh (Flare) Gas Recovery – Project In-Amenas “ in Algeria

Responsibilities handled during the project

 Responsible in performing daily inspection and reporting as per approved inspection and test plan.

 Check daily if there any complaints to the approved Quality plan.

 Prepare the necessary documentation required for each job activity.

 Check the work performed by the construction group in compliance to the approved drawing issued for construction, specification and standards.

 Monitoring of job site Quality control Inspection progress.

 Prepare monthly reports of QC activities

 Supervises the preparation of inspection plans and provide technical directions regarding determination and selection of QC inspection Hold points.

 Investigate the root case or NCR & repeated violations and report to the QA Manager for corrective action or preventive action.

 Preparation of status log for NCR, RFI, NTI & log book entries

 Monitor and verify that the work execution and implementation are as per approved procedures, approved specifications and approved drawings.

 Review of inspection and test plan, material verification, WPS&PQR Mechanical and chemical testing, all stage of final inspection.

 Worked in Both Pipe Line as well as plant projects.

 Witness Welder Qualification test as per project requirement

 Perform in process inspection such as material; lay out fit-up, visual and dimensional control of various pressure vessels, piping, and storage tanks. in accordance with latest revision drawings, applicable codes standards and required tolerance.

 Prepare the consolidated inspection reports and co-ordination with other department’s client and vendor.

 Inspection of on plot welding works

 Reviewed final disposition reports and as-built drawings.

 In Coming Material Inspection, with regards to the actual tractability against manufactures Certificate.

 Making of Audit cheek list and worked as a internal auditor

 Witnessing of PQR/WPS – Welder’s qualification test on Stainless steel. Carbon steels and alloy materials of various projects.

 Verify consumable storage, backing and its issue/control.

 Witnessing of pneumatic test for nozzle reinforcement pads.

 Witnessing weld overlay activities on shall seam joints, head joints, nozzle inside, etc.

 Witnessing Hydro testing pneumatic test and vacuum test activities as per approved procedure and drawings required pressure and holding time.

 Visual inspection and hydrostatic/pneumatic test witnessing of valves.

 Monitoring the survey of Trench, padding, backfilling, lowering of pipes, Pipe foundations, equipment foundations, RCC structure, Retaining walls, etc.

 Conduct surface cleaning, painting and pre-shipment inspection.

 Verified surface preparation and painting activities for required anchor profile, surface finish and dry film thickness as per approved protective coating system and clients engineering standards. Verification of paint conducted against manufacturer’s acceptance criteria and monitoring of atmospheric/weather conditions during surface preparations and painting activity. Final visual inspection conducted on coated surface for any possible defect on material or coating.

 Verification and review inspection reports for submittal to client.

 Preparing final inspection reports and documents for client reference and approval, this might include, final dimensional reports, pressure test certificate(such as hydro, pneumatic, vacuum which ever required) Material traceability, as built drawings, NDT Certificates/charts and other pertinent documents required

 Preparing Tie-In Packages and Hot Tap packages.

 Issuance of inspection release certificate and verification of shipping arrangement prior to dispatch of equipment.

 Meeting with DPP/DMI of Illizi for Inspection and Hydrostatic test witness,

 Maintain the relationship with the Owner for the aspects relating to quality;

 Manage the Quality Plan;

 Coordinate the activities of the Inspectors of Quality control;

September 2001 – September 26th 2003: Company of Restoration of the Aeronautical Materials (ERMAéro) Industrial Manufacturing Unit (Military company) Algeria

Job title: Head Engineer of Technical Quality Controls Insurance Department

Job description and reporting responsibilities: Responsible for management, technical control and the installation a Management System Quality in ERMAéro

Responsibilities handled

 Member of the standardization technical board to the IANOR former INAPI of Algiers since 1993 (Algerian Institute of Standardization).

o Member of the Technical Group N°02 “Methods of tests and analysis “

o Member of the Technical Group N°24 “Metals Tests “

o Chairman of the technical Group N°24 during years 1999 & 2000

 Master various experimental mechanical tests

Nov.1996 September 2001: Company of Restoration of the Aeronautical Materials (ERMAéro) Industrial Manufacturing unit Algeria

Job title:: Head Engineer of repair and restoration workshop of aircraft equipment

Job description and reporting responsibilities: Responsible for the staff and equipment management and the technological development of the workshop heat and surface treatment

Sept.1993 – Nov. 1996: Company of Restoration of the Aeronautical Materials (ERMAéro) Unit of Research and Development Structure and Aeronautical Materials in Algeria.

Job title: Researcher Engineer

Job description and reporting responsibilities: Responsible for the study of projects relating to the metallic materials (Steels and light alloys of Russian origin in particular, the D1, D16, AMG, and 30CGCA)

Dec.1992 – July.1993: University of TIZI-OUZOU (UTO) Mechanical Department of Engineering in Ageria

Job title: Part Time Teacher.

Job description and reporting responsibilities: giving courses in industrial and technical draftsman ship

 






popup-img