CV,Construction QC, Technical Manager Looking Worldwide

Available
Serial No: 47442
Skills keywords: project management, construction management, quality management
Current location:  United Arab Emirates - View on map
Nationality: Brazilian
Spoken languages: english, portuguese

PROFESSIONAL QUALIFICATIONS

• Quality Manager – ACQI – Register 6029436 , Ongoing CL5 Certification, upgrade to CQI Diploma,

• Welding Inspector L1 – FBTS/SEQUI – SNQC IS 0167 (1993) – Petrobras System,

• Welding Inspector L2 – ANSI B31.3 – FBTS – SEQUI – Ongoing – Petrobras System,

• Lead Auditor – ISO 9001/2015 – Register 6029436, Ongoing, an upgrade to IRCA Recognition.

ACADEMIC BACKGROUND

• Technical Degree – EES – Metallurgical College (Technical School) – RJ (1986 – Dip. Available),

• Production Engineer – UNIGRANRIO – Production Engineer – RJ (2012 – Diploma To be Issued).

COMPLIMENTARY CERTIIFICATIONS

• Internal Auditor – ISO 9001/2000 – BVQI – 2007 – Certified,

• Internal Auditor – ISO 9001, 14001 and OSHAS 18001 – BVQI – 2011 – Certified.

• TBOSIET – Tropical Basic Offshore Safety Induction & Emergency Training – 2012.

 

PROFESSIONAL EXPERIENCE

• TUV-Nord /BOROUGE 3 EXPANSION PROJECT / BOROUGE – POLYOLEFIN PLANT, RUWAIS, ABU DHABI
2013/14/15
Contract – Third Part Services
Position – TPI TEAM LEADER (PO/LDPE PACKAGE) – Client’s Third Part Inspection & PMC Project Quality Coordinator

Main Activities – Responsible for Inspection Teams (about 35 Engineers) , QA Audits Assessment, All NDT & Tech Labs Surveillance, Civil, Static & Rotating Inspections, I&E Test Inspection ,Painting and Insulation, Welding and Heat Treatment, Documentation Control (Review and Approval of ITP, Procedures, MC Dossiers), Control and Inspection of Pressure Tests, during Construction and Support to Precomissioning , Commissioning and Start Up, Handover of Project Documentation, Management of PO Package Site Inspection Resources and Day-to-Day Quality Issues and Responsibilities, from Construction to Core Group, up to SPM Level.

• BUREAU VERITAS / TAKREER EXPANSION PROJECT, RUWAIS, ABU DHABI
2011/2012
Contract – Third Part Services
Position – QA/QC TEAM LEADER (FOR EPC 4 PACKAGE SERVICES) – CLIENT’S THIRD PARTY INSPECTION – TPI

Main Activities – Responsible for all Inspection Teams ( about 15 Engineers ) , NDT ( RT & UT , Tech Labs ) ,Civil and I&E Test Teams ,Painting , Insulation and Refractory Inspections , Welding and Heat Treatment Inspection, Documentation Control, Review and Approval , Teams and Contractors Surveillance, Materials Receiving Inspection , Control and Inspection of Pressure Tests on Tanks , Spheres , Pipelines , and Liaising with Team Administrative Aspects.

• THYSSENKRUPP – SIEMENS -VAI / ENESA, BRAZIL
2009/2010/2011 –
Steelmaking , Continuous Casting and Coke Plant Construction
Contract – Main Equipment Erection & Installation, Pipelines, BOP Media Piping, Electrical & Instrumentation
Position – QUALITY GENERAL MANAGER (FOR ALL CONTRACTS AND DISCIPLINES)

Main Activities – FEED Studies, Site Responsible for all Inspection Teams (about 100 people) , Source Inspections, NDT Subcontractors (RT & UT , Tech Labs) ,Civil and I&E Test Teams and Subcontractors , Painting , Insulation and Refractory Inspection Teams and Subcontractors, Welding and Heat Treatment Inspection Teams and Subcontractors , Materials Receiving Inspection , Control and Expedition , All Erection and Test Procedures Elaboration, except NDT, conventional NDT’s, as Visual, Penetrant or Magnetic , Manual UT and /or Automated UT (Phased Array) and/or SafetyRad (SpeedRad), QC Plans and Inspection Routine Elaboration , Reports , Manuals , and Data Books, delivery and Approval , All Management Meetings, Standards and Clients Specifications interpretation , NDT Results and Final Approval before Clients evaluations , Internal/External Audits upon ISO 9001/14.001/OHSAS 18.001, Team Administrative Aspects (Budget, Contracts, Costs Control, Manpower and Budget Control and Planning.

• ENGECAMPO/TERMORIO/REDUC/TRANSPETRO
2004 to 2009
EPC at Petrobras on Refineries , Terminals and Bases , Oil & Gas Units
Position Held : QA/QC MANAGER
Contract – Erection and Maintenance in Various Petrobras Refineries and Petrochemicals Units

Main Activities – FEED, Site Responsible for all Inspection Teams (about 100 people), on Projects throughout Refineries REDUC , REFAP , REPLAN , REPAR , since FEED up to Erection Phase, Pipelines Spooling , Structures Assembly and Erection , Equipment Installation , Civil Services , I&E Installation Services , Project Details , Inspection and Commissioning into Water Cooling Units and Water Supply , Hydrocracking , Desulphurization Trains , Pipelines Maintenance , Units Maintenance, Pipelines fabrication and erection at TEBAR , TECAM, TEBIG , TECAB, TEDUC , TEAG , TEVOL, Including all storage and transportation facilities for Oil & Gas Products.

• ANDRADE GUTIERREZ/ KAWASAKI – HI, BRAZIL
2003
Thermoelectric Fortaleza – TFOR
Contract – EPC Contract for Power Plant Construction – Combined Cycle – TFOR
Position Held – QA/QC MANAGERF & CONSTRUCTION CONSULTANT IN ELECTRO MECHANIC ASSEMBLY AND NDT  EXAMINATIONS

Main Activities – Supervision over Contractor Inspection Teams , NDT Subcontractors (RT & UT , Tech Labs) , Civil and I&E Test Teams and Subcontractors ,Painting , Insulation and Refractory Inspection Subcontractors , Welding and Heat Treatment Inspection Teams and Subcontractors, Materials Receiving Inspection , Control and Expedition , Inspection of Pressure Tests , All Erection and Test Procedures Elaboration , except NDT, QC Plans and Inspection Routine Elaboration , Reports , Manuals and Data Books elaboration , delivery and Approval , All Meetings Held , Standards and Clients Specifications interpretation , NDT Results and Final Approval before Clients evaluation, Team Administrative Aspects (Budget, Contracts, Costs Control, Planning).

 

DETAILS OF FURTHER EXPERIENCE CAN BE PROVIDED UPON REQUEST

 

 

 

 

 

 






popup-img