Profile
Enthusiastic and committed individual with 20 years experience working as a pipe fitter for large Organisations within the Oil & Gas, Pharmaceutical and Nuclear industries. Highly committed person driven by achieving all objectives within a timely and safe manner.
Qualifications & Training
(Copy certificates available)
2015 MJI 10 Hand Torque Bolted Connection Techniques
2015 WAH unit 2
2015 CCNSG Passport – Cert no. T154486 Valid 2018
2013 Bosiet Offshore Survival & emergency training – Valid 4 Yrs
2013 Parker A-Lok Training
2012 Asbestos awareness
2011 CSCS Pipe fitting HVAC (registration no. 3293066, valid 2016)
2011 M.I.S.T (mandatory offshore safety requirement)
2011 Working at heights Unit 2 & Lokring certificate
2011 Asbestos awareness & Abrasive wheels
2009 (valid until 2019) CCNSG safety passport
2009 Basic offshore safety induction and emergency training
2005 Bolting & Tensioning course
2004 ACE card – cert 1377043
2001 Clean room working on orbital welding course
1994 (Apprenticeship) City&Guilds: craft competences in Pipe fitting E.C.I.T.B NVQ3
Materials used whilst adhering to a tolerance of +/- 0.5mm:
Metals : Aluminium,Carbon & Stainless Steel,Duplex,Titanium,Copper and exotic metals.
Plastics: PVC,CPVC,Polypropylene,PTFE and ABS.
Other : Fibreglass and Glass.
Specific comments relating to Offshore requirements:
Vantage No.: 0737197
Offshore survival: Oct 2013 – Oct 2017 Offshore medical: MIST: Achieved 2015 – valid 4yrs
Employment History
Oct 15
Pipefitter, Woodgroup, 101 BP Mungo
1½” Methanol SCH 120-De-Scaler, Injection pipework.
July 15 – Sept 15
Pipefitter, Woodgroup – BP Etap Tar
Valve replacement 1”-20”, spading/de-spading.
April 15 – July 15
Pipefitter, Doosan Babcock – Smithkline Beechams
3”-8” ss pump pipework.
Feb 14 – Mar 15
Pipefitter, OGN Newcastle, IRS-Recruitment
N-Quest Producer FPSO Refit, Nyhamna Expansion Project
Installation of steam systems 6”- 12” 6MO SH120, Boiler commissioning scope.
Fresh water system 3”ss SHD10, pre-fabricated & installed.
Cunifer & Titanium deluge systems 2” – 3”, hydrostatic- testing of system.
July 2012-Sept 2013
Pipefitter, PDMS ,Offshore Tiffany, Ninian North/South, Murchisan Oil Platforms
Replacing 4”-16” Pipe Spools & Control Valves, Torgue & Tagging
Fabricating 6” c/s Bulk Tank Pipework & Installing
Jan 12 – 25/6/2012
Pipe fitter, Wilton of Dundee, Offshore BP Harding platform
Fabricated/installed 4” victaulic system and 2” XXS iron roughneck hydraulic return line.
Aug 11 – Sep 11
Pipe fitter, AMEC. Offshore, Britannia and Jasmine Oil platforms
Mainly working on the installation of 2” venting systems, spading/de-spading oil separators and implementation of Lokring pipework. 12mm. od instrument transmitter hook ups.
Apr 11 – May 11
Pipe fitter, Cofely. Offshore, Oil platform, Holland
Mostly fabricating 3-6” 300lb Duplex nozzles, hydraulic flange testing 3000 psi and installation of 10” stainless steel de-watering system.
Feb 11 – Mar 11Pipe fitter, Cordell Engineering. Glasgow Southern General Hospital
Worked on the re-fit of the internal 6” carbon steel schedule 20 and hydro-static testing of systems from ISO-GA and PID drawings.
Nov 09 – Jan 11
Pipe fitter, Doosan Babcock. Irvine/Montrose/Grangemouth
Measured, fabricated and installed 8” stainless steel ring water main system whilst working within a live plant, installed 2” stainless steel caustic systems, hydraulic bending of 1” carbon steel drain legs, re-routing of 16” steam header branches, replaced 16” valves and torqued.
Aug 06 – Aug 07
Pipe fitter, Global Resources. Mobil Beryl Alpha and Britannia Oil platforms.
Shutdown work involving vessel work, hot bolting, spading and de-spading.
Aug 94 – Aug 06
Pipe fitter, Doosan Babcock/MBS (10 years). BP Grangemouth, GSK Irvine, Roche products Dalry, Nuclear Hinckly Point, Hunterston B power station and ESSO refinery, Fawley.
ESSO, Hot tapping 1” – 16” carbon steel nozzles, hydraulic and pneumatic testing of pipe work, utilised 1-2” air powered prep rotating tools and internal and external grinding machines.
Nuclear, Reactor in-vessel training, removal and reinstatement of 2” stainless steel BIF pipe work, drilling of purge holes , plasma cutting training, installation of 1/2” stainless steel injection pipe work.
BP, 16” duplex cyclone pipe work and anchors, flange alignment, grinding of root welds and hydraulic flange testing.
Pipe fitter, Woodgroup (1 year). Flotta oil terminal and Claymore platform, offshore.
Shutdown work involving destruction/construction of 6” pump pipe work and installation of re-routed system, replaced 16” spiral wound gaskets on steam system.
Jul 90 – Aug 94
Pipe fitter NASEC apprentice, Redpath Engineering, Cowdenbeath, BP and Mossmoran.
Apprentice of the year awarded years 1 and 2.
References
Available on request