CV, Electrical Engineer, Project Manager Targets GCC

Available
Serial No: 40843
Skills keywords: site electrical engineer, electrical engineer, project management, project coordination, site management
Current location:  Delhi, India - View on map
Nationality: Indian
Spoken languages: english

Profile

• A highly motivated, enthusiastic, dedicated and achievement oriented perfectionist working dynamically towards the growth of the organization and possessing approach.

• Distinguished career of over Nine years with proven expertise in Erection, Testing, and Commissioning of various HT & LT Electrical equipments and their Installations.

• Site in charge and team leader for Project monitoring, planning and execution with excellent interpersonal skills to enhance performance and quick adaptability to changing trends and technology to meet new requirements successfully.

• Prompt in handling customer complains or maintenance calls to their satisfaction.

• Strong track record in striking perfect coordination in Man-Machine and materials to achieve maximum productivity levels.

• Strong interpersonal skills with proven ability to build nurture relations.

 

Professional Qualifications

BE (Electrical Engineering) from JAMIA MILLIA ISLAMIA,
A central university, In the year 2003 Securing 64.76%

 

Experience Summary

Current :Up to July 2015

Worked with Saudi Arabian oil company Saudi Aramco through Hak group(T &TS)division as an Engineer-III in its flagship megaproject Jazan Refinery and Economic city.

Major responsibility:Handling the 3 nos. substations of EPC-4,&5 division of the megaproject, reviewing the various design stages, Like 60% and 90% design review,Coordination with the contractor and involved in total project execution commissioning and testing.

 

July-2012-Sep-2013
Larsen & Toubro ATCO Saudi LLC( A joint venture with ATCO, A.A.Turki Co.)

Worked as an Electrical Engineer in SADARA Polyethylene Project, Jubail-2

Major supplies: Power Transformers 34.5/4.16 KV,25 MVA, 34.5/.48 KV, 3/3.75 MVA, switchgears, MCC etc.

Major jobs:Responsible for Erection commissioning and testing of Substations,Planning of materials, manpower management,Vendor finalization etc.

 

Tata Steel Ltd, Jamshedpur INDIA)
Project Manager
Jan’ 2008- May-2011

 As a site in charge, responsible for overall activities including Project Monitoring, planning, execution and all techno-commercial issues related to the project.

 Erection, Commissioning& Testing of all types of HT & LT Electrical equipments like Power Transformers, Switchgears, new substations & Augmentation of the existing 33/6.6 KV substation,6.6/.415KV substation, facilitating the enabling activities like HT/LT cable diversion and miscellaneous construction power management for the entire department.

 Analyzing & Reviewing: Procurement of Equipments like Transformers, Switchgears, LT Panels etc; Responsible for the coordination with different departments, understanding the requirements of the key customers.

 Modernization : Capable of analyzing modernization needs & computing time , materials and manpower requirements for successful execution of the project and Controlled and Motivated team of staff and guided them to achieve optimum productivity.

 

RELIANCE ENERGY LIMITED, NOIDA
Site Engineer
Sep’05-Oct 2007

 Involved in supervision of project.

 Managing the contractors, documentation of whole process, material management, planning and proper co-ordination systematically.

 Proactively interacted with clients for approval of drawings and responsible for successful contract closing.

 

KEY PROJECTS

PROJECT 1 JAN’08-May-11

Project Manager for the up gradation of 33/6.6 KV AIS Substation to GIS one, New 6.6/.415 KV substation for the 3 MTPA expansions Project of the Tata Steel, Jamshedpur.

Major Supplies & Erection: 25/31.5MVA Transformers, 1.6 MVA Transformers, 6.6 kV switchgears, 33kv GIS etc.

Major Challenge: Completion of the project without affecting the plant production and within given timeframe.

 

PROJECT 2 SEP’05-OCT-2007

ENGINEER for Rural Electrification work in Pilibhit District (536 villages) of Uttar Pradesh. (UPRE)

Major Supplies & Erection : 33/11 KV , 5 MVA Transformer- 7 No’s, 33 KV lines- 70 Km, 11 KV lines –1332 Kim’s, 11/0.25 KV single phase Transformer 10 KVA,16 KVA & 25 KVA (3 Phase Transformer) –1661 Nos.

Profile: upgrading 33/11 KV substation, Commissioning, testing whole the equipments. Supervision of 33 kV substation, Erection, Stringing of conductors , Augmentation, Erection of poles, Transformer , area survey, GIS, management and planning and we electrified whole the rural area with installing & upgrading Grid substation, feeders, laying down thousands of kilometers of cables to consumers.

PROJECT 3 NOV’04-AUG’05

SITE ENGINEER for MASS METER REPLACEMENT PROJECT of BSES, New Delhi. Profile: Order finalization and contract execution of various contractors for the Project in Delhi.

Major Supplies: Electronics meter 3 Phase & Single Phase, Cable, Gland, Lugs, Junction Box etc

Profile: Supervising the whole “MMP” project, managing the contractors, manpower planning and execution, documentation of whole process, material management, proper co-ordination, GIS, PIS, LT Installation, Quality control, changing defective old cables, junction boxes, bus bar chambers and installation of digital energy meters.

 

IT Skills

 Operating Systems : Windows XP,7

 Language : C, C++,

 Others: MS Office, Internet.

 

 

 






popup-img