I am an Electrical Engineer from Ukraine with:
- 5 years experience in installation and maintenance of low voltage equipment;
- 7 years as a chief power engineer on two factories;
- 1 year as an fitter/electrical on cruise vessels all over the world (at present).
It is interesting for me to be in movement
I would like to learn something new in an absolutely different field of knowledge or
specialisation.
That is why I am ready to be involved in any interesting and perspective activity which
is not directly linked with my education and experience.
I will be glad to consider all the proposals
April 2015 – Present.
Fitter/Electrical.
Princess Cruises
http://www.princess.com/
July 2009 - March 2014.
Chief Power Engineer.
Manufacturing company “Navigator”, Ukraine
August 2007-July 2009.
Chief Power Engineer.
Company "Stankolit ", Ukraine
September 2002 to August 2007.
Electrician/foreman, Ukraine
EXPERIENCE SUMMARY
I am an Electrical Engineer with:
– 5 years experience in installation and maintenance of low voltage equipment;
– 7 years as a chief power engineer on two factories;
– 1 year as an fitter/electrical on cruise vessels all over the world.
EXPERIENCE DETAILS
April 2015 – Present
PRINCESS CRUISES
Electrical fitter
According to the duties I provide technical assistance and support in such fields as:
– day-to-day repair and maintenance of all electrical equipment, including galley, laundry, hotel equipment, and deck machinery;
– daily inspections of all electrical substations, resetting and tracing earth faults; inspects batteries and switchboard;
– perform all duties in accordance with applicable policies and procedures, USPH and Fleet Regulations.
July 2009 – March 2014
NAVIGATOR MANUFACTURING COMPANY
CHIEF POWER ENGINEER
Main duties:
– Ensuring of uninterrupted supply of the company by energy (electricity, gas, water);
– Work with permits and regulatory authorities;
– Planning and organization of effective work of staff (5 employees);
– Ensuring the energy saving and rational use of energy;
– Organization of timely equipment maintenance;
– Organization of supplies of goods and materials, working with contractors
August 2007 – July 2009
STANKOLIT
CHIEF POWER ENGINEER
Main duties:
– Ensuring uninterrupted functioning technological equipment;
– Entering into experimental operation of a new production section;
– Cooperation with supply organizations;
– Organization of the electrical department.
Sept 2002 – August 2007
FOREMAN ELECTRICIAN – ELECTRICAL INSTALLATION AREA
Main duties:
– Installation work in accordance with customer requirements and building codes;
– Cooperation with supply organizations;
– Organization of the electrical department.
QUALIFICATIONS
Electrotechnical Systems of Power – Bachelor/Masters Degree
National Mining University Of Ukraine
1997 – 2002