Career Summary
1: QURRAYAH COMBINED CYCLE POWER PLANT II:
Two years and four months of experience as electrical engineer with BEMCO Arabia as main contractor at Qurraiyah Power Plant-II in Saudi Arabia. During my job I carried out installation of electrical equipment (13.8kV, 4.16kV, 480V,230 switchgears, 480V MCC, DCS system, DC systems, 230V and 125V UPS system, DCDB /ACDB systems), installation of cable ladders and conduits, managing of cable pulling, termination and testing etc.
2: ARAR POWER PLANT EXTENSION (IV):
I have been working as lead Electrical Engineer and Instrument and Control site Engineer with SADELMI as main contractor in ArAr power plant extension (IV) . We are installing two SIEMENS gas turbines and their accessories. So far I have carried out:
Electrical scope of work:
Installation of primary and secondary grounding grids.
Installation of two Siemens Power Control Centers (PCCs) and their cable pulling, glanding and termination.
Installation of ABBs 4.16KV medium voltage switches gear (Unigear-ZS1) ( Normal and Emergency) , their internal cabling connection and assistance in its commissioning activities.
Installation of AL FANAR 480V LV switch gear, its internal cabling and assistance in commissioning activities.
Erection of two 98MVA, 13.8kV Siemens generators and their erections.
Erection of two step up transformers of 90/110 MVA each and oil filtration with ABB vendor.
Installation of two unit transformers (UAT) of 30/15/15 MVA each and the erection of their assembly parts and oil filtration with Hyndai Vendor.
Installation of two 13.8KV generator circuit breakers (GCBs) and one system circuit breaker (SCB).
Erection and installation of various distribution (MV/LV, LV/LV) transformers.
Installation of 125V DC system.
Installation of 230V UPS system.
Installation of various panels in switch gear e.g. RTCCs, 132kV line protection panels, UTF metering panels, Disturbance recording panels, Synchronizing panels, Protection panels for UAT and GSUT etc.
Installation of 8000 meter cable trays of various sizes and installation of various conduits ( PVC, RGS and EMT) of various sizes.
Cables pulling( HV,MV,LV, Control and I&C),
Installation of Saudi Lighting Company (SLC) lighting system.
Installation of lightening system and its connection with main grid grounding.
Installation of cathodic protection system.
Testing of insulation resistance, continuity and loop checking of all control and LV cables.
High potential testing (Hipot testing) of all the MV cables and bus bars.
Cable termination of MV, LV, control and I&C cables.
Installation of heat tracing system.
Preparing As Built drawings.
Instrument and Control (I&C) Scope of Work:
Installation of Siemens GT I&C devices e.g. flow sensors, pressure sensors, temperature sensor etc.
Cable pulling and termination for all these devices.
Installation of fire detection system of Minimax with their technical field advisor.
Cold and hot loop checking of all these devices as per specifications.
Coordination with all Siemens technical field assistants(TFAs).
Installation of fire alarm system including its conduit installation and cable pulling.
Installation of DCS panels in switch gear.
Installation of CRT’s based operator station(CRT+KB).
Managerial Scope of Work:
Communication with main contractor regarding electrical and I&C activities.
Receiving of all drawings and documents regarding our scope of work.
Coordination with other departments i.e. Mechanical and Civil.
Deciding scope of work among my site supervisors and foremen.
Distribution of manpower among my supervisors and foremen.
Supervising all electrical and I&C activities.
Carrying out all activities as per the project schedule.
Reporting main contractor about out of stock material items and mismatching between drawings and site conditions for FCNs.
Preparing RFIs of completed work and Work Progress Report (WPRs) of every month.
Conducting tool box meeting almost every week.
Skills
• Appreciable Punjabi, Urdu, Arabic and English communication skills (Master of English Language and IELTS).
• Creditable time management ability.
• An expert of Microsoft Word, Excel, Power Point etc.
• Well aware of international electrical standards i.e. NEC, NEMA, IEEE, NFPA and IESR etc.
• Well aware of current international affairs.
• Willing to work under time stress and work stress whatsoever.
• Willing to work anywhere in Gulf Countries and travelling internationally.