CV, Electrical Engineer With QA,QC Experience Looking Globally

Available
Serial No: 25636
Skills keywords: 
Current location:  Saudi Arabia - View on map
Nationality: Indian
Spoken languages: english

Profile

Electrical and Electronic Engineer with the ability to analyze complex engineering problems, evaluate and recommend alternatives and communicate recommendations effectively.Able to take on the responsibility and work on the own initiative, can work as part of team and can also lead the team when required. Have the ability to communicate affectively with colleagues and senior engineers. Can take the decisions in complex situations.

1. In-house Training for Health and Safety and Quality Control Inspector. K .S.A.

2. Closed awareness & understanding of Saudi Aramco Engineering Standards & Procedures for Electrical/Instrumentations Systems (Including SAES, SAMSS, SAEP, etc.)

3. Familiarization & understanding of industry code practices NEC/NFPA-70, NEMA, IEEE, and Manual for installation of Electrical/Instrumentation Equipment/Systems.

Career Summary

1. QA/QC E & I Inspector
(June 2014- Present)

TUV Nord, National Inspection & Technical Testing Co. Ltd, SA, SWCC, CAPE

Responsibilities:

(CAPE)

Performed QC Inspections, testing’s and documentations.

To witness the inspections of three phase Autotransformer (3ph+n) Y connected, 220-380-480 VAC, 75 KVA.

To witness the inspections & testing of Motors

Verifying for Physical damages of the Transformer, Panel board, distribution panels, etc.

Responsible for monitoring and maintaining the accuracy of documentation of project

Witnessed the inspections of cable for any physical damages, Insulation resistance and continuity tests

To review documentation with respect to transformers, cables, motors and various electrical equipments.

Verify the grounding system and make sure the ground loop has point to point continuity

Conducted Inspections, witnessed testing’s and reviewed documentations

Reviewed and added comments to Quality Documentation deliverables

(SWCC)

Eddy Current test of Condenser

Eddy Current Probe installed with sensor to sense the tube for damages, scratches etc, internally and externally

Checked the condition of Eddy Current test pulling cable

Visually Inspected Copper nickel tubes of Condenser for testing

Checked for tubes cleanliness

Checked for damages or restricted tubes internally and externally

Checked for tubes blockages & plugged tubes

Carried out inspections for Motor installation, witness Winding IR and Winding low

Resistance test and Solo Run test

Inspecting all electrical motors activities and submitting daily report to the Operation Manager

Monitored and inspected the installations of conduits, cable Trays, local control stations, lighting JB’s

Always worked as per Project HSE requirements

2. Electrical Inspector
(Aug 2013 – May 2014)
Comerint Saudi Arabia. Ltd Natpet(Client) Yambu, KSA

Responsibilities:

Performed QC Inspections, testing’s and documentations

Responsible for monitoring and maintaining the accuracy of documentation of project with regards to project specification and QA/QC procedures.

Checked for any damages or discrepancies to report accordingly

Reviewed and added comments to Quality Documentation deliverables

Monitored quality issues resolution with Engineering, procurements and construction, and with contractor.

Witnessed the Installation of lighting panels, UPS, Grounding system installation, LV/ MV Cable pulling & termination

Responsible for inspecting all electrical motors activities and submitting daily report to the Operation Manager.

Co-ordinate with site in charge and assured that all activities are in accordance with Scope of work, IFC drawings

Reviewed all quality log records

Witnessed continuity, insulation resistance for power and control cables.

Carried out inspections for Motor installation, witness Winding IR and Winding low resistance test and Solo Run test, Mechanical Run Tests with client & contractors

Monitored and inspected the installations of conduits, cable Trays, local control stations, lighting JB’s, fixtures, Distribution & Control Panels

Maintained the list of calibration certificates for all testing equipment’s.

Maintained good record keeping of activities carried out and inspection reports, surveillance reports, Non-Conformance reports

Attended and participate in all required client and company meetings.

Observed & Followed all safety rules and regulations

3. Electrical Supervisor (Sub Station)
(Sept 2012 – June 2013)

Samsung Engineering (EPC)
Tasnee (Client), Jubail, KSA

Responsibilities:

Maintained log-sheets, verified detailed records and reports for all inspections conducted, and maintained the quality documentations records

Supervised Inspections activities, testing’s and Pre-commissioning activities to ensure the proper installations of Electrical equipment’s: 13.8KV Transformers, Switchgears

13.8KV/ 4.16KV, lighting panels, UPS, Grounding system installation, LV/ MV Cable pulling & Termination

Ensured the proper installations of electrical(Ladder) and instrument(Perforated), Field instruments Level, Flow, Pressure, Temperature control valves, Installation of Enclosures

Participated in daily/weekly meeting, co-ordinated and performed the field final inspection

Performed Audits & verified installations of contractor’s work and arSatisfactory with standards and achieve a good quality of work.

Complied to QA/QC Manager

Reviewed project drawings and applied codes, Standards Specifications

Installation of CP for Tanks

Made sure all anodes(Zinc) pass the holiday test prior to installation & burial and connection to tank(Cathode) using copper wire

Made sure Galvanic anodes(Magnesium) are soaked in water for at least 24 hours prior to backfilling & connected to tank(Cathode) with copper wire

Making sure all CP cables from anode are connected in CP terminal box

At the end CP is tested by conducting CP potential test & test result should be between 1.2V and 3.0V

Performed testing of Motors Winding IR and Solo Run test, Power and control cables continuity, insulation resistance, & the installation of motors, conduits, local control stations, lighting JB’s, fixtures, Control Panels

Maintained good record keeping of activities carried out, inspection reports, surveillance reports, Non-Conformance Reports and made sure it is dealt with at the earliest

Made sure all pre-commissioning activities are performed as per proponent requirement and approved procedures

Always maintained a good working relationship with all personnel’s

Conducted Surveillance visits to ensure safe working practices are followed for quality compliance

Conducted site walk-through with Quality, HSE and PMT departments personals

Monitored the work schedule & work progress, material availability, RFI proposals, closing of Punch-list reports and daily reports

Complied with all Project HSE requirements

4. Electrical QC Inspector
(Mar 2008 – Aug 2009)
Air Voice Technologies & Contractors India

Responsibilities:

Witnessed inspections & testing’s with client QC Representative and the Sub-contractor’s representatives

Participated in weekly quality meetings related to quality

Co-ordinated and performed field final inspections

Reviewed and added comments to Quality Documentation deliverables

Witnessed Installations and testing of LV motors and 4.16 kv Transformers

Ensured that all the works comply with IFC drawings, applicable Standards and Specifications

Performed QA/QC inspections and proper documentations/installation of electrical equipment’s and instrumentation transmitters, marshalling cabinets, calibration, installation, wiring, termination

Witnessed cable testing’s

Comply with all Project HSE requirements

5. Electrical Site Engineer (Trainee)
(Jan 2007 – Feb 2008)
Air Voice Technologies & Contractors India

Responsibilities:

Made sure Project Quality is attained with complete safe practice as per HSE

Responsible for site installation and performed testing’s of cables i.e. Insulation Resistance, Continuity

Made sure that No faults detected within electrical systems

Use to troubleshoot in case of any fault occurs and made sure problem is fixed immediate, to enhance production

Maintained the log book of all electrical work

Made sure all work is being followed as per HSE

Qualifications

PGD in Wireless Communications System Engineering
From University of Greenwich, London, England, UK 2011

Bachelors in Electrical and Electronics Engineering
From Jawaharlal Nehru Technological University, India 2008

 

Certifications & Technical Skills

• H2S (Hydrogen Sulphide)

• Apprenticeship in Low Voltage and Current Distribution System for High Rise Building

• Diploma in Circuit Analysis and Design

• Experienced with Fire and Safety Norms

• Troubleshooting, Windows XP / Vista / 7, Microsoft Office

Key Strengths

• Learned the importance of sharing information, supporting, building & maintaining positive working relationship with others to form a cordial work environment and its effects were remarkable

• Developed leadership skill and confidence level

• Developed confidence of taking responsibility for an establishment.

• Learned the importance of good team work to achieve targets

• Good communication skills and ability to explain proper perception of a concept.

• A proportional combination of Devotion, Dedication and Determination.

• Good Analytical Skills Responsible, Creative & Optimistic.

Languages

Fluent in: English, Urdu, and Arabic (Beginner)

 

 

 

 

 

 

 

 






popup-img