CV, Experienced Civil Engineer Targeting Worldwide

Available
Serial No: 41076
Skills keywords: civil inspector, civil qc inspector, civil construction, qa/qc civil, civil & infrastructure
Current location:  United Arab Emirates - View on map
Nationality: Indian
Spoken languages: Engilish, Hindi

Key Qualifications

Twenty two years’ experience (Middle East ten years) in oil & gas, petrochemicals and power plants, construction of underground and overhead pipe lines, sub stations, road works, pipe rack foundations, culverts, manholes and storage tank foundations for oil & gas sector. Construction of multistoried commercial, residential and industrial buildings including pile foundations. Construction of stone columns for increasing soil bearing capacity for huge container storage yards and construction of power plant.

‒ Leadership and supervision

‒ Setting out for pipe lines, roads, civil works, culverts, manholes, trenches, retaining wall and building

‒ Preparing survey report, as built drawings etc.

‒ Day to day supervision of all R.C.C. works shuttering and civil works, steel works, piping works for multi- storey commercial building, residential buildings and villas.

‒ Preparing bar bending schedules for steel reinforcement.

‒ Procuring materials as per requirement.

‒ Preparing the monthly, weekly programs and monitoring the same and progress reporting to the Management.

‒ Labor allocation and giving guidelines to the Sub -ordinates.

‒ Quality control adherence as per ITP and various specifications.

‒ Co-ordination with consultant sub-contractors, Vendors and approving authorities.

‒ Quantity Survey and preparing running Bill for sub-contractors.

 

Achievements:

Chimney 110m Height-Work done by Taloja, Mumbai. Work completed by 29 days. Handling reinforcement work. Dia – bottom dia: 9.5m, top dia: 1.2m. Work done by Taloja, Mumbai. Work completed by 29 days. Handling reinforcement work. Dia – bottom dia: 9.5m, top dia: 1.2m.

 

 

Education and Trainings

Diploma, Civil Engineering

Trainings/certification:

‒ SIPP Supervisors Training Course Level(1&2)

‒ Work force Safety Leader Certification Level-(1&2)

‒ ADCO PTW Issuing Authority

‒ ADCO GAS Testing Certification

 

Work Experience

 

Oct 2014 to till now:
ADCO Abu Dhabi PMC for MOTT MACDONALD

BAB CO2 Pipeline Project -71 K Mtr.

Civil Inspector- PMC

 

08/2013 to 2014

IMECO, Abu Dhabi

Civil QC Inspector

Masdar Projects:

1) Masdar Project for Construction Facilities and Security Management System. Construction of Masdar City Entrances, road works, storm water drainage, solar street lights, prefabricated capines.

2) Early Plots Connection: Executing and upgrade the utilities networks. Executing new fire fighting networks, new plots connection for potable, TSE, chilled water and drainage networks.

3) Northern Car park: furnish a 38,000 sqm. Car park (2 floors) with all services (power, lighting, fire fighting network and drainage), painting, road marking, construct 13 stairs and substation.

4) Masdar Headquarter Surface Car Park, Utilities and Roads: Construction of 27km new road to service Masdar Headquarter. Execute a service corridor adjacent to the road containing different services such as potable water line, chilled water network, TSE, telecommunication network, storm water and power. Constructing Car park and providing solar street light.

5) Masdar Eastern Access to Main Road: Constructing an access road connecting internal roads in Masdar to the main road including protection for the existing services and providing future duct bank for different services. Installing solar street lights.

GASCO Project

 

‒ As per ITP, British Standard and various other specifications conducting regular quality inspection

‒ FDT test for road work as per the specifications

‒ Co-ordinate with Client quality team to forward plan activities under your responsibility

‒ Maintain a detailed daily diary of all activities and your observations

‒ Ensure that you fully understand the Clients ITP and Check Record system and that the inspection activities that you observe are duly noted

‒ As per the specification check the instrumental trench & fibre optic trench, duct bank , reinstate pavement slab

‒ Review all the test report

‒ RFI submitting

 

 

04/2012 – 04/2013
SAIPEM ABU-DHABI

Senior Civil Supervisor /Inspector

Project: Al Hassen SHAH Gas (Sulphur) Project

‒ Monitors the construction work and work site to ensure compliance with applicable plans, specifications, standards, codes, regulations and requirements.

‒ Monitors the construction work and construction site for compliance with safety standards.

‒ Provide technical, full-time, on-site inspection of the progress and quality of the construction work performed.

‒ Reviews and provides input into field related submittals as required.

‒ Monitors resolution of quality related issues.

‒ Monitors the Contractor’s receipt inspection of materials arriving on-site.

‒ Assures that the construction work is performed and completed in accordance with the

Contract Documents.

‒ Conducts surveillances and inspection of the work, monitors the implementation of the Contractor’s quality control program, and coordinates field sampling and testing for verification of quality results as needed.

‒ Prepares quality assurance records including deficiency and non-conforming notices.

‒ Assists in the preparation of punch-list and outstanding work items related to Substantial and Final Completion of the work.

‒ Performs other duties as assigned.

‒ Produce and input a daily log of inspected field work.

‒ Produce daily inspection reports for all disciplines of work performed.

‒ Produce and input daily inspection records.

 

10/2009 – 10/2011
CB& I- ANGOLA/ AFRICA

Senior Civil Inspector /Supervisor

Project- M/s- Cheveron,Cabinda Gas Plant- Malongo

‒ Preparing the monthly, weekly programs and monitoring the same and progress reporting to the Management.

‒ Provide technical, full-time, on-site inspection of the progress and quality of the construction work performed.

‒ Reviews and provides input into field related submittals as required.

‒ Monitors resolution of quality related issues.

‒ Monitors the Contractor’s receipt inspection of materials arriving on-site.

‒ Supervising for RCC, pipe sleeper, foundations, big oil foundations, columns, pipe rack foundations, RCC staircase, structural foundations, vessel foundations

‒ As per ITP, British Standard and various other specifications conducting regular quality inspection

‒ FDT test as per the specifications

‒ Quality control adherence as per ITP and various specifications.

 

 

10/2008 – 08/2009
CB& I, Qatar

Senior Civil Supervisor/ Inspector

Project: Shell Pearl GTL Project, Ras- Laffan, Qatar

‒ Supervising for RCC, pipe sleeper, foundations, big oil foundations, columns, big RCC culverts, pipe rack foundations, RCC staircase, structural staircase foundations, big RCC bunt walls, earth bunt walls, vessel foundations

‒ Supervision and control of all trades and sub-contractors and materials.

‒ As per ITP, British Standard and various other specifications conducting regular quality inspection

‒ FDT test as per the specifications

‒ Base level, strata level inspection.

‒ Approval for the blinding

‒ Shuttering and re-enforcement inspection

‒ Bolt and base level inspection for foundations

‒ Grouting inspection for the top foundation and pockets

‒ As per the RFI I have under taken the responsibility of inspecting all the civil work along with the site.

‒ Making logistical arrangements for the various contractors.

‒ Presiding over the safety meeting for the labors and contractors

‒ Trouble shooting any safety violations by the labors or contractors

‒ Read to help nature, which can be looked as an advantage for the industry

‒ Adaptable to the norms and regulations of the organisation.

‒ Quick responsive skills to adapt to various trends and changes.

 

01/2005 – 10/2008
ALGHANIEM INTERNATIONAL TREADING &CONTRACTING WLL, Kuwait

(EPC) Civil Supervisor

Project: Az-Zoor EPP 2008 -1000 MV-Emergency power plant project piling, fire water line and power gas generator foundations (EPC)

‒ Kuwait National Petrochemicals Company: Crude line, firewater line ,naphtha tank foundation all-in live plant

‒ Kuwait Oil Company: Sleeper foundations, crude line, tank foundations, fire water line all in live plant work.

‒ Equate Petrochemical Project (2nd plant project)

 

2003 – 2004
Al-AHMAD CO TRADING AND CONTRACTING CO LLC (ISO 9001–2000),

Dubai

Design Engineer (E2 Grade)

Project: MEREENA PROJECT

Nature of work: RCC High project ( 52,36,28,18 Storey Building ) and water over head tank. By Peri Form and Shuttering Technology Germen

 

2000 – 2002
RAY CONSTRUCTION

Site Engineer

Project: Maharashtra Industrial Development Corporation

Nature of work: Ranjangoan, Project 65 km road, sewage line & drainage 3m Dia pipe and area developing

Project: Raymonds Steel Project, Nasik

Water treatment plant foundation, furnace foundation, 3000 cubic meter and 800 x 35 meter building projects.

 

1998 – 2000
JMC PROJECTS INDIA LIMITED

Assistant Engineer

Nature of work: 17 storeys high-rise building

 

1995 – 1998
ASHOKA BUILD CON LIMITED

Assistant Engineer

Project: Highway project

Over Head Water Tank Reservoir (beg water storage)

Nature of work: Heavy Shuttering work. Bridge of length of 1kilometer, 120 km Express highway (4-line), 1 sq. km. reservoir work.

 

1994
QATAR GENERAL PETROLEUM CORPORATION

Engineer

Project: Substation Building Project Water tank, Oil Tank Foundation and Vessel Foundation.

Nature of work: Reinforcement work handling

Duration: 1990 – 1991

Project: Videocon International Project

Nature of work: 1850 M2 I.M.S. Building Fab. of Trusses and Beam Multi Storey RCC Building. All shuttering done by moving shuttering system.

Project: Alfines Solvex Project

Duration: 1991 – 1993

Nature of Work: Staff quarters 17 Building & 82 Mtr. Height Silo (Hydraulic Sliphorem). Shuttering by hydraulic moving shuttering system.

1988 – 1990 GANNON DUNKERLY & CO LIMITED

Senior Supervisor

Name of Project: Bajaj Housing Project

Nature of work: 16 Buildings, 1000m2 Engine Assembly Building including all Types of E.G.P. Foundation by Dhoka Shuttering Works.

SUPPLEMENTARY INFORMATION

 

Skills:

‒ Knowledge of Surveying with, Theodolite , Auto level etc.,

‒ Knowledge in Computer – MS Office & Excel

‒ CBT Qatar Petroleum safety course

‒ “Safety”, “IIF” leadership SAPP CB&I

‒ Languages known- Malayalam, Tamil, Hindi & English

‒ Award for co-ordinating activities of READYMIX CONCRETING BATCHING PLANT in 2001(5008 CUB MT) Ashoka Buildcon Ltd

 

Language Capabilities

Malayalam : Mother tongue

English : Spoken – fluent; written – fluent; reading – fluent

Hindi : Spoken – fluent; written – fluent; reading – fluent

Tamil : Spoken – fluent;

Arabic : Spoken – intermediate

 






popup-img