• B., SC of Electrical Power and Machines Engineering- Tanta University (May 2004), Egypt.
• Overall grade: Very good with honor (80.74%).
• Graduation project: speed control of Induction Motor using VVVF inverter.
• Graduation project grade: Excellent.
Career Summary
Dec.2012– Now
Electrical Engineer at Archen Engineering Consultants , Riyadh ,KSA Project name : South Border Infrastructure Project, SBI (Roads & Buildings)
Client : Ministry of Interior Contractor : Saudi BinLadin Group (SBG) Contract Value : SR 11.5 Billion
JOB RESPONSIBILITIES
1- Reviewing the Design, Supervising of Installation, Testing, and Commissioning including the handed over of the Electrical works for building compounds (Border Compounds, Sector headquarter, Border stations &rare gate).
2- Reviewing the Power and control cables, firefighting system, telephone system and all related electrical works for the buildings.
3- Attend meeting with contractor, sub-contractors &client to discuss all issues about our project.
4 Preparing the electrical chick list for electrical system.
5-Checking the materials on site to be matched with the specification and standards.
6-Preparing reports for constructions activities on site daily, weekly and monthly.
7-Testing and commissioning the electrical system.
AUG. 2008-DEC.2012
MEP Engineer at National Authority for Tunnels Project name : Cairo Metro Line 3
Client : Ministry of Transport
Contractors Joint Ventures : VINCI CONSTRUCTION PROJETS, COLAS RAIL,
ORASCOM,ALSTOM & ARAB CONTRACORS
Contract Value : 215,546,553 € &1,228,502,835 LE
JOB RESPONSIBILITIES
1- Reviewing the Design, Supervising of Installation, Testing, and Commissioning including the handed over of the MEP works(A/C , Ventilation, Escalators, Elevators, Dewatering, Firefighting and ABBASIA light repair work shop equipment’s) with respect to the specification.
2- Revising maintenance manuals and approving them after updating to fulfill our comments.
3-Follow up the guarantee period.
4- Preparation the tender documents for phase 1, 2, and 3 of CAIRO metro line 3 according to French regulation.
5- Preparation the tender documents for CAIRO metro line 4 according to Japanese standards.
6- Revision all submittal forms of contractors for MEP works for greater Cairo metro line 3 phase 1 and 2.
FACTORY ACCEPTANCE AND INSPECTION TESTS:
Sr. Test Name Test Location
1- Electrical Power and Control Panels for A/C &Ventilation APEGELEC Factory – France
2- Chilled Water Pumps KSB Factory – Germany
3- Ventilation and smoke Fans ZITRO’N factory – Spain
4- Electrical panels for low voltage applications Schneider Factory – Egypt
5- Cables for low voltage and control application ElSweedy Factory – Egypt
SITE ACCEPTANCE AND INSPECTION TESTS:
1- E/M equipment’s (A/C, Ventilation) supervisory system test for line 3 phase1 metro stations.
2- The Electrical &control panels(PCP) of A/C and Ventilation system.
3- ABBASIA light repair work shop equipment’s (Bogie change machine ,lathe on pit, washing machine and re- railing) Acceptance and Inspection Tests.
4- Firefighting system test for line 3 phase1 metro stations.
5- Smoke Evacuation Scenario Test for line 3phase 1 metro stations.
SEB.2007- AUG.2008
Electrical maintenance engineer at Elwadi holding company.
JUN.2004-AUG.2007
Electrical power Engineer at Air Defense force.
Technical Courses
1- Summer 2007 PLC (S7 200, S7 300 andS7 400) maintenance and operation for boilers, motor contactors and relays at Arab Academy for Science& Technology.
2- Electrical Protection Equipment.
3- Electric Panels& Cable Testing (Insulation Test).
4-Transformer testing.
5- Programming &maintenance of soft starters, inverters, weight meters and mass flow meters.
6- Different sensor types, motor types, generators, transformers, pumps and electrical constructions.
Languages
Arabic : Mother tongue
English : Very Good reading, writing and verbal skills. French : Fair reading, writing.
IT Skills
Operating System : Windows XP,Windows 7
Programs : MS Office (Word,Excel,Power Point,…),Internet & Auto Cade 2D.