CV, Experienced MEP Project, Construction Manager Targeting M East

Available
Serial No: 20665
Skills keywords: 
Current location:  Cairo / Egypt - View on map
Nationality: Egyptian
Spoken languages: Arabic, english

Relevant Qualifications & Training

Graduation Date: June 2001
Bachelor of Mechanical Engineering (major: Power & Energy) from: Ain Shams University – Cairo – Egypt
Overall Grade: Good
Grade of Graduation Project: Very Good
Graduation Project Criteria: “Second low analysis of scroll compressors used in the refrigeration cycle typically employed in chilled water A/C systems”Scope of Work: The aim was to design and construct a model for the refrigeration cycle utilizing a scroll Compressor with a capacity control using the inverters technology (VFD) to vary the loading conditions through compressor rotational speed variation for the sake of obtaining various operational loading points @ optimum efficiency

July 2000 to August 2000

Trainee mechanical engineer in Power JAC (Leading Company in Egypt in the field of manufacturing A/C and refrigeration equipments)

• Sheet metal working for the parts used in manufacturing of the window A/C units

• Monitoring the process of the assembly line of the window A/C’s and split units

July 1999 to September 1999

Trainee site engineer in GTEC (General Technology for Air conditioning, it’s one of the leading and renowned dealers and distributors of Carrier products in Cairo)

• Installation of package units, ducted and decorative (duct free) split units including: refrigerant piping, ductwork, electrical and control wiring connections.

• Heat Load Calculation (manually” Excel sheets”, tables/charts & computerized by using different software), reading and interpreting the A/C drawings.

• Complete system design and equipments selection.

Profile

I’m a mechanical engineer with professional experience, I ‘m experienced and familiar with the field of: maintaining, troubleshooting & servicing of various A/C units and systems – site work supervision – equipments installation and start-up – complete HVAC Systems design – testing, balancing and commissioning – cold & hot water supply, drainage, LPG, fire fighting systems design and installation knowledge inline with project specifications, international codes, standards and authorities regulations – electrical systems(low current/low voltage) knowledge – materials procurement – quality control & assurance – cost estimation & cost control, budgeting, scheduling & project management tools & techniques.

Career Summary

Company Name: Al Hada contracting company Ltd – Riyadh “KSA”
From: May 2013 to: December 2014

Position: Mechanical Projects Manager – Section head

Job Responsibilities:

• Overall mechanical works in-charge for all company projects reporting to the deputy general manager

• Leading a staff of site mechanical engineers and other staff to handle and execute the project mechanical scope of work

• Bidding, price estimation of new tenders

Preparation of mechanical shop drawings, MEP coordination / composite drawings and design proposals

• Planning, scheduling of mechanical project activities and progress monitoring of all projects

Projects:-

1) Emergency bldg. (ECC) in King Abdul Aziz medical city (75 beds hospital) for National Guard – Riyadh

2) Bone Marrow transplant bldg. (BMT) in Prince Sultan military medical city – Riyadh

3) Child cancer center main hospital building and renovation of administration and security building in King Faisal specialist hospital and research center – Riyadh

4) Chronic & oncology buildings for Health affairs dept. – Ministry of defense – Riyadh

Company Name: MMG (Mohammed Al Mojil Group of companies) – Riyadh & eastern province “KSA”
From: December 2009 to: March 2013

Position: MEP Construction Manager

Job Responsibilities:

• Supervision of all the mechanical installation on site (including: HVAC , Cold & hot water supply, sanitary & waste drainage and firefighting)

• Preparation of shop drawings and material requisitions

• Coordination meetings with main-contractor and client

• Progress monitoring, review and verify subcontractor(s) monthly invoices

• Preparing RFI “Request For Inspection” for completed works for all mechanical activities

• Fully aware of all ARAMCO procedures and standards as: SAES, SATIP, SAIC, SATR, SAMSS and other quality system requirements

• Defining project constraints & key milestones based on the approved master work plan

• Assigning different tasks and work activities to the project team based on their skills/experience & capabilities with productivity monitoring

• Obtaining project resources in accordance with the company approved procurement plan and project budget monitoring

• Preparing two weeks look-ahead work schedule based on the updated master work program

• Executing the tasks defined in the approved project plan in order to achieve project goals

• Managing changes to the project scope due to site modifications or other factors and updating project time schedule and project costs

• Preparing monthly payment interim invoices application based on work progress percentages and submit it for approval and payment follow up

Projects:-

1) KAPSARC (King Abdullah Petroleum Studies and Research Centre) residential package in Riyadh

Main Contractor: SKE&C

2) WASIT gas plant industrial support facilities buildings (ISF) in Khursaniya , Eastern province

Project management: SAUDI ARAMCO

Consultant & Project Management: SAUDI ARAMCO

Owner: Ministry of Petroleum

Company Name: OBAYASHI Corporation (the main contractor in DURL consortium for executing Dubai metro project) – Dubai

Designer: WS ATKINS & associates

Consultant/The engineer: Systra-Parsons

Owner: RTA (Roads & transport authority) – Dubai Government

MEP Sub-contractor: ETA / Al Futaim engineering

From: January 2009 to: November 2009 (one year employment contract only)
Position: Construction Manager (E & M)

Job Responsibilities:

• Handling the installation of the overall electromechanical works executed in four over-ground metro stations in SHK Zayed road including stations footbridge & entrance podiums through our E&M subcontractor workforce and a group of company direct workers and other subcontractors

• Reporting to the senior construction manager and having eight engineers directly reporting to me

• Certified by MHI (Mitsubishi Heavy Industries (Rail project contractor) as a TCOMP trainer (testing, commissioning, operation & maintenance procedures) of all MHI safety & quality procedures concerning the metro operations

• Coordinating with the design dept. for material/drawing submissions and obtain approvals as per the regulations of the relevant local authorities and service providers like: DUBAI Municipality, DEWA, DUBAI Civil Defense, DU, ETISALAT, TECOM and EMPOWER…etc

• Checking and reviewing all shop drawings, coordinated/composite services drawings and material appraisals in line with the project specifications, E&M design, architectural & structural drawings and incorporating the engineer comments for obtaining final approval

• Issuing FCR (Field Change Requests) to the engineer (consultant) for his approval as per site conditions installation, coordination with building section (civil works)

• Reviewing all design changes, monitoring and approving variation work orders for subcontractors

• Planning and scheduling material deliveries and monitoring the overall work progress against the approved work program and look-ahead schedules and preparing weekly project report for the management meeting

• Project QA/QC activities like:-

1. Maintaining proper documents filing as per the company quality ISO procedure system

2. Installation & material inspection requests

3. Mockup installations

4. Pressure/gravity/insulation tests

5. Monitoring installation/workmanship, safety, quality and overall housekeeping

6. MEP clearances

7. Snagging list and rectification

8. Method statements

• Testing & commissioning manager for all the related E&M installation and equipments as per the project quality policy & procedures

• Arranging and attending scheduled meetings with:-

E&M and building section staff/subcontractors/the engineer/company management as required and scheduled to ensure adherence to the planned or programmed works with company quality and HSE policies

Company Name: OMEGA Engineering LLC – Dubai (subsidiary of DEYYAR group and a leading MEP
Contracting company in UAE) – Dubai
From: December 2006 to: January 2009

Position: Senior Project Engineer (MECHANICAL)

Job Responsibilities:

• Assisting the project manager in delivering the project to the specified quality, time and budget in accordance with the company quality standard procedures

• Following up with the different suppliers to obtain quotations, evaluate offers and prepare take-off material quantities and material requisitions comparative statements

• Coordinating and following up with the engineering dept. for all the site technical related issues, managing and supporting the draughtsman/CAD operators in preparing the shop drawings for the different trades, builders work, services coordination & As-built drawings

• Checking, reviewing and preparing shop drawings and material submittals in line with the project specifications and incorporating consultant’s comments for obtaining final approval

• Planning and scheduling material deliveries and monitoring the work progress against the approved main contractor’s program and look-ahead schedules

• Responsible for materials/drawings submissions and obtain approvals as per the regulations of the relevant local authorities and service providers

• Attending scheduled meetings with the internal staff as advised by the project manager and ensuring adherence to the planned or programmed works and company quality and HSE policies

• Updating Project baseline program including delays in critical activities, milestones and their effect in overall project delay

• Supervising and coordinating the “Testing & commissioning” process for all electromechanical services

• Handling contractual correspondences from and through the main contractor

• Responsible for the day to day work execution progress in coordination with the site engineers, supervisors and foremen to achieve the planned clearance dates, initial and final fixes

• Preparing variation claims/cost sheets based on site modification and client additional requirements subject to consultant approval

• Participating in the value engineering process done in the project pre-construction stage

• Project QA/QC activities as mentioned herein before

Projects:-

1. [3B + G + 18 + ROOF] Residential Tower @ Business Bay.

Main Contractor: AGCC “subsidiary of CCC”

MEP Consultant: RMJM “Robert Matthew & Johnson Marshall”

Owner: CFH

2. [3B + G + 5P + 21 + ROOF] Commercial Office Building @ TECOM – “DAMAC Executive Heights”.

Main Contractor: Target Engineering

MEP Consultant: ECG \ Ian Banham & Associates

Owner: DAMAC Holding Properties

Company Name: (ARABTEC), one of the leading construction companies in UAE & GCC – Dubai
From: January 2006 to: December 2006

Position: MEP Coordinator

Job Responsibilities:

Coordinating between the consultant / main contractor and all the other sub-contractors for the following issues:

1. Overall MEP work progress on site follow-up

2. Liaisons with the different local authorities and services providers for shop drawings submission, site inspections, obtaining approvals and NOC certificates (design & construction)

3. Arranging coordination meetings between all the concerned sub-contractors with consultant and main contractor including recording and distributing the minutes of meetings

4. Site daily activities & progress reports, material delivery/procurement and shop drawing flow sheets, work inspection requests and clearance schedules in line with the project plan and civil works progress

5. Reviewing all RFI’s (Request For Information) raised by sub-contractors and following up the technical reply given by consultant to ensure closing of the RFI

6. Evaluation & verification of all variation claims raised by sub-contractors before submission to client for final approval

Projects:-

Burj Dubai Lake hotel & amenities @ Burj Dubai development area (commonly known as: THE ADDRESS HOTEL) for M/s EMAAR Properties PSJC

Consultant: WS ATKINS & Associates Overseas

Project Management: Mirage Mille Leisure Development

MEP Sub-contractor: International Electromechanical Services (IEMS)

Company Name: UTS CARRIER LLC – Abu Dhabi & Dubai “UAE”
From: November 2002 to: January 2006

Position: Service Engineer – Service Business Unit (Warranty Dept.)

Job Responsibilities:

Warranty related operations in Dubai and Northern Emirates. To handle and solve any product quality issue or a customer complaint, reporting the frequent ones to concerned factory or manufacturing party for further analysis and investigations. To be also responsible for the installation, start-up and commissioning jobs carried out by the service team including all Carrier products (mainly chillers) , conducting a number of training sessions for the service and warranty staff / key customers & end users and also includes:-

1) Customer and Employee Satisfaction

2) Total quality Management

3) Service Profitability and controlling the operation cost

4) Productivity

5) Technical Support Function

6) Leadership Functions

7) Office Management

Company Name: EGYCOND – HVAC Contracting – Cairo “Egypt”
From: August 2000 to: October 2002

Position: Mechanical / HVAC site engineer

Job Responsibilities:

• Participating in tendering, material take off & bidding for more than10 different projects of total cooling capacity ranging between: 100 to 1500 tons (CHW & DX systems) in Egypt

• Checking & re-calculating all the system designed values from the heat load estimation, duct design, air outlets selection, fan static & pump head pressure calculation, pipe sizing and equipment selection manually through charts and tables or through different design software

• Arranging the preliminary shop drawings, equipments/material submittals and samples, revised drawings, preparing the final As-built drawings & follow up – liaison for consultant’s approval

• Supervising and responsible for the work execution progress in two different sites

• Attending the consultant-subcontractors site coordination and work progress weekly meetings

Projects:-

1. City Centre shopping mall and residential complex – Nasr city – Cairo, (2B+G+4 Floors +7+Roof) bldg

2. Ramad Al Azhar hospital (100 bed spaces) – Al Darrasa – Cairo, (B+G+5+Roof) bldg

 

 

 

 

 

 

 






popup-img