QUALIFICATIONS
1986 B.E. (Hons) Chemical Engg. from BITS Pilani
1986 M.Sc (Hons), BITS Pilani
PROFESSIONAL EXPERIENCE
2014 – 2015
TEBODIN, ABU DHABI
PROJECT MANAGER for Engineering of Offshore Projects (Conceptual studies, brown field Detail engineering for Offshore Projects)
Projects :
QATAR PETROLEUM : Detail Engineering for Replacement of piping on NFA-PS4 Platform
ADMA- Engineering for EPC WORKS FOR ZK FIELD WHT’S ELECTRIFICATION ZWSC/ZCSC TOPSIDE ELECTRICAL WORKS PACKAGE – “A”
Placement of containerized substation and other electrical equipment on ZCSC-PGP, ZWSC-BST-S1 and ZCSC-UTP as part of electrification projects package in Zakum field LQP expansion conceptual study- Bunduq
Study to increase POB on Bunduq LQP platform from 110 to 180
Structural modifications to accommodate living modules for enhanced POB
Global and local in place analysis for adequacy check
Study of alternate barge arrangement for living quarters
Study and design of separate LQP platform for increased POB
Design of jacket, pile and topside for new accommodation platform
Cost estimation and optimization of different options
2005 -2014
PUNI LLOYD LTD( PLL ) – OFFSHORE
EPC PROJECT MANAGER , GM (OFFSHORE)
Well Head Platforms(Engineering , Procurement Fabrication, Load out ,transportation and installation) , Subsea Pipelaying with Kuber Pipelay Barge, Shallow water piplaying by shore pull, SBM Installation, Top side modification of existing Oil Well and Process Platforms including Deck Extension(Engineering, pre fabrication of spools, transportation and installation), NG Compressor Trains skids fabrication, load out, transportation and installation on Platform.
Projects:
Heera Redevelopment Project for ONGC (USD 300m),
Gas Compression facilities on PRP Project, in the Gulf of Thailand ( Client PTT Thailand – USD 120m)
CNPC – Myanmar China Pipeline Project – Laying of Submarine Pipeline (32” and 40”), including shore pull and Normal Pipelay. ( USD 42m)
Mumbai Uran Pipeline Project – Shallow water pipelaying, HDD, marshy area
SBM and Pipeline project for British Gas Project.
DETAILS OF EARLIER EXPERIENCE CAN BE PROVIDED UPON REQUEST
KEY ACCOMPLISHMENTS
Offshore Projects Completed :
Myanmar China Pipeline Project ( offshore ) – Laying of 40” and 32” subsea pipeline with Pipelay Barge and shore pull from shore approach on either ends, FOC laying, Pre and Post Trenching
Mumbai Uran Pipeline Project (shallow water offshore), with FOC piggy back shore pull, tie-ins etc
SBM and subsea pipelaying for British Gas
Offshore Gas Compression facilities on PRP Platform, in the Gulf of Thailand ( Client PTT Thailand – USD 120m) – Project involves engineering, procurement and installation of three gas compression trains on offshore platform
Heera Redevelopment Project (ONGC) – Four Well Head platform, Top side modification, Subsea Pipelaying,Composite cable, SBM
Project Control Engineer for Shell – LNG Port & Re-gasification Terminal Project , Hazira
Petrochemical project : Ethylene Oxide Purification, EO Derivatives and MEG
Other Projects Completed – Gulf and India
Planning for Tripoli – Khom Pipeline & Compressor Station project, Libya.
Planning for Buhasa Habshan Pipeline ( Proposal )
Planning for Doha Urban Pipeline Relocation Project ( for Qatar Petroleum)
Schedule for MG3 refinery project of Petronas , Azzawiya Refinery revamp & DCS modernization project – Libya(Proposal)
Ethylene Oxide Purification Project ( Petrochemical )
Ethyoxylation Project (Petrochemical )
Planning for Onshore Gas Development Project OGD III – GASCO, Abu Dhabi.
Project Feasibility : PVC Project, PBR Project, LPG Storage Terminal