Certifications
City and Guilds carpentry / joinery
Managing safety in construction certificate
First aid certificate
BER 3 day workshop
Safe Pass Course
Extensive training in health and safety
Employment History
Jan 2014 –Present
ExonnMobil
Position Construction Manager
Overall in charge of a Design and Build fitout project in Monrovia for a large American oil company
Nov 2012-Jan 2014
International Construction and Engineering
Position Construction Manager
Responsible for the setup of a diamond mine in a remote part of western Liberia
This project involved the construction of 7 bridges using concrete culverts, land clearance,building a camp for 50 nationals and running the mine for its life cycle.
Jan 2012 –Nov. 2012
P.W. Sierra Leone
Position Construction Manager
Responsible for concrete yard producing and placing culverts.Site set up and construction of maintenance building for established mining company in Sierra Leone
May 2010 – Jan 2012
Lagan Construction
Position Construction Manager
Refurbishment of Sierra Leone Lungi airports main runway
Demolition of Cape Sierra hotel and site set up in Aberdeen Freetown in preparation for the construction of new Hilton hotel in early 2012
Jan 2010 – April 2010
Airlink
Position Construction Manager
Tesco refresh on stores in Ireland
Sept. 2009 – Dec.2009
Fire and Flood Services
Position CONSTRUCTION MANAGER
Strip out and refurbishment of factory extensively damaged by fire in Connemara Galway
Overseeing all aspects of health and safety on site.
Sept 2006 – August 2009
Zoe Developments
Position CONSTRUCTION MANAGER
Projects undertaken include the following:
State Street Bank landlord and client fit out of new build 6 storey over ground with 2 storey underground car park and tenant fit out including RAF and lay in ceiling grid throughout main comms room ser rooms, av facilities in meeting rooms, full size kitchen and canteen, HVAC installation, wet areas including showers and toilets.
Cherrywood Business Park multi tenant and landlord fit outs
Fit outs included Directors floor with audio and visual conference facilities,kitchen,dining area and meeting rooms.RAF and lay in grid ceiling throughout,comms rooms with cooling and fire suppression
Fit out of fitness centre from shell and core to completion including construction of swimming on 1st floor, pool plant room, construction of male and female changing rooms, HVAC installation, reception area and lift installations.
Jan 2004 – August 2006
Patton Fit-out
Position SITE MANAGER
Projects undertaken include the following:
Fit-out of listed church in Dublin city centre to landmark pub/diner on Mary Street Dublin[www.thechurch.ie]
Fit out included installation of goods lift ,passenger lift and 2no dumb waiters
Full size commercial kitchen,new main bar with secondary bars on each floor,HVAC,new joinery and refurbishment of original including the redos.Wet areas including showers and toilets Outside landscaping
Fit-out of various retail outlets in Dundrum SC, Mahon Point SC in Cork and Cork city centre.Including Monsoon,Accessorize,Debenhams and Fields Jewellers.
Sept 2002 – Dec 2003
Lawlor Magee
Position SITE MANAGER
Projects undertaken include the following:
Fit-out of derelict factory with structural alterations to high end pub (www.marketbar.ie) in Fade Street Dublin This project included the installation of a new mez. Floor for dining area the use of reclaimed flooring background heating and natural ventilation.
Fit-out of POD night club in Dublin This project involved structural alterations and the installation of stepped seating area and male /female toilets
Sept 2001 – Aug 2002
T B D Developments
Position SITE MANAGER
Projects undertaken include the following:
Commercial development new build at Sandyford Business Park.
The landlord fit out for the building included the installation of lifts, raf, lay in grid ceiling and shell and core toilets and showers.
Nov 1997 – Sept 2001
Structuretone
Position SITE MANAGER
S A P fit out at Citywest Business Park this building is naturally ventilated controlled by an external weather station monitoring wind speed sun direction and elevation with internal co2 sensors.
The fit out also included a full size commercial kitchen and canteen, av facilities directors offices and lift installation.RAF and lay in ceiling grid throughout
Level 3 communications fit out of derelict factory in north London with major structural alterations into a switch site.
Cecil Chambers in the Strand London complete fit out over 5 floors including lift installation,
4 Millbank London fit out of sister company of Enron.
Enron energy seconded to Enron to oversee a 26 million pound fit out at Grosvenor Place being carried out by Laing management.
NCR Marylebone road the total refurbishment of NCR headquarters with the client in occupation this project included the installation of lifts, new comms room, HVAC installation, full size commercial kitchen and canteen, av facilities in meeting rooms and high end finishes.
May 1997 – Nov 1997
Bovis Lelliot
Position SITE MANAGER
Projects undertaken include the following:
Palace of Westminster this involved the installation of a new power, voice and data network in the House of Lords and Commons.
Banco Commerciale Italiano fit out of commercial bank over 4 floors.
Jan 1997 – Apr 1997
Galliford Construction
Position SITE MANAGER (self employed)
Project undertaken include the following:
St Ivel dairy fit-out of head office in Somerset.
Sep 1996 – Dec 1996
Ramco Energy Baku Azerbaijan
Position SITE MANAGER (self employed)
Project undertaken include the following:
Refurbishment of existing building in Baku this involved the installation of new rc floors HVAC installation and fit-out for British oil company
Feb 1995 -August 1996
Peter Da Savary
Position SITE MANAGER (self employed)
Project undertaken include the following:
Stapleford park country house construction of new swimming pool and fit out of high end hotel in Leicestershire.[www.Staplefordpark.com]Refurbishment of 2no grade 2 listed country houses in Somerset.
Interchange building in Camden lock London refurbishment of existing building for commercial office space this work included the installation of new cast in site stairs and lifts HVAC installation.
Apr 1989 – Jan 1995
Henry Boot Southern
Position SITE MANAGER / FOREMAN CARPENTER (self employed)
Projects undertaken include the following:
Refurbishment of 19 void properties for the Borough of Hammersmith and Fulham.
The fit-out of 3 halls in Vand A museum.
Construction of sub station at Glaxo Stevenage.
Renovation of 4 properties for Bedford Estates in Bedford Square London.
Construction of Nursing Home in Bushey Herts.
Refurbishment of various government buildings.
Refurbishment of 2no houses for Shepherds Bush Housing Association.