Owner: PetroChina / Chevron
Location: Chuandongbei Gas Project, Sichuan China
Company: Worley Parsons (Chevron)
Year: November January 28, 2012 Up to Present
Position: Commissioning System Completion Coordinator
Job Description:
Monitor the site activities, pre-commissioning\commissioning progress in relation to the approved project schedule last version and terms of the contract. Define, for each system, the list of documents and the relevant issuers, necessary to achieve to required steps for facility hand over. Prepare for each subsystem\system\unit\facility pre-commissioning dossier and hand-over package collecting and managing necessary documents from contractor\company terms. Manage the plant system subdivision marked-up drawings and component lists up-dating during the construction \ pre-commissioning\commissioning phases. Provide guidance and participate in activities concerning Mechanical Completion, Pre-Commissioning\Commissioning and Turnover subsystems\systems equipment and systems. Provide assistance in development of completions management procedures and participate\lead functional and inspection checks, start-up and operating, loop testing, Permit to Work and preparation of Completions Dossiers, etc. Lead and participate in Systems Completion acceptance processes including punch list activities and management of the same mechanical completions\subsystems\systems and equipment systems. Provide onsite leadership in ensuring safe execution of construction execution, Pre-commissioning\Commissioning and systems completion. Ensure utilization of a computerized Completion Management System tracking, the certification, and quality purposes. Carry out review of all PID’s, SLD’s, Vendor drawings\documentation-comment as necessary. Provide detailed input into population of pre-commissioning\commissioning Database for all disciplines.
Monitor proper database population of engineering parameters, checksheets, and verification criteria. Ensure mechanical completion and equipment’s and systems commissioning procedures, work packs, and turnover and completion packages. Follow-up and coordinate punch lists issues by company according to contractual needs and approved procedures coordinate technical assistance to project teams. Cooperate with commissioning managers and company representative to solve any problem relevant to hand-over. Promote and Support the Construction, Commissioning & Star-up Managers with the effective implementation of the Completion Management System during execution phase of each project. Ensure maximum levels of utilization, availability and reliability of the Completion Management Systems. Responsible include system mark-ups for the handover of the process train system. Responsible for the system completion certification database for all construction, pre-commissioning and commissioning aspects. Liaise with discipline & construction engineers to ensure certification boundaries & requirements. Compilation of guidance certificates in line with system certification and boundary limits. Input of data to handover certification packs to assure continuous accurate handover records. Liaise with inspection, construction, commissioning, mechanical completions, to ensure adequate status recording of ongoing activities. Ensuring adequacy of as-built drawing records and input to certification dossiers plus transmittal to design contractor. Liase with operations and commissioning teams during the finalization the handover phase through to final close out and systems handover. Initiate, establish and manage the projects document control system in its entirety including establishing a filing index for any stored hard copy documents. Check certification to comply with company regulations to ensure that the project meets all of their requirements and legislation, ensure complete adherence to document numbering and agreed pathways throughout both internal and external. Progressively transfer responsibility for the works start up and commissioning organization ensuring that system turnover is fully accepted by signature. Compile agreed lists of system execution items to be completed by agreed dates, and monitor and record completion of such exception items. Consolidate construction punch lists into system punch lists, and provide an auditable trial to ensure that all punch list items are captured, cleared and signed off for completion. Maintain the original hard copy wet signature master system punch list. Coordinate with Falcon Global Technical support group via support desk to report any technical issues with the Zenator, Track and report progress of contractor effort with respect to pre-commissioning and commissioning, Coordinate both company discipline engineers and contractor’s responsible authorities for the sign off of all punch list documentation and updated progress of closed punch list items as per priority. Overall responsibility for the systems completion database is the focal for systems completion database. Troubleshoots all database issues with the respective parties, database, Zenator support team, Prepares in overall responsible the company standard tag import matrices against engineering tags registers, Overall responsible for audits engineering and commissioning disciplines lead population of tags registers for input systems completion database asset register.
Owner: Chevron/ CABGOC
Location: Cabinda Malongo, Angola Africa
Company: Fircroft (Chevron)
Year: November Nov. 30, 2010 to Dec. 30, 2011
Position: Commissioning System Completion Database Specialist
Job Description:
Responsible for company completion& interface facilitation activities, ensure that interfaces toward completion are identified and addressed. Establish, implement and maintain the project completion system. Ensure the completion activities are strictly compliant to relevant HSE standard and requirements implement an effective organization for the completion function. Ensure professional execution of responsibilities, including quality, timely completion and HSE aspects in the completion & interface organization, also develop and implement a project specific completion strategy. Responsible for the development and execution of the Systems Completion plans oversee the project. Involves the interface and handover form construction at Mechanical Completion, to commissioning resulting in turnover to operations and providing assistance in start-up and acceptance testing efforts. Overall responsibility for the systems completion database is the focal point for systems completion database coordination. Responsible Mechanical Completion Data Entry Specialist will be ensuring that the System Completion Database entries are updated daily in parallel with field construction, Lead Data entry of critical completions data into Mechanical Completions Database Mechanical checksheets, punch lists and Completions Certificates. Organized and filing of all paper documentation being entered into the MC Database for the preparation of handover documentation for the Operation Teams. Prepares tag import matrix against engineering tag registers. Audits engineering contractor population of tag registers for input to systems completion database and asset register. Construction and population of the systems completion database from design documents. Maintenance and accuracy of information held in the system completion database. Ensures that all MOC’s are auctioned in the systems completion database. Validates Equipment tagging is applied uniformly across vendors and engineering contractor’s documentation. Validates commissioning contractor turnover documentation in accordance with the project VDD specification. Consolidates all vendor carry-over issues into the systems completion database. Coordinates all regulatory certification and carry-over issues into the systems completion database, and preservation activities within the systems completion database. Coordinates and issues preservation look ahead activities, report. Prepares electronic and paper systems completion dossiers. Coordinates systems certificates and acceptances. Coordinates punch list control. Manage contractor through the development of the completions process for the project downstream physical assets through the handover to operations. Liaise with upstream systems completion to insure alignment with respect to the set-up of systems handover database. Develop and coordinate handover assurance process to ensure first time right delivery to operation providing the evidence that asset is safe to start up and we can demonstrate it. Coordinate handover assurance process to ensure timely delivery of the handover dossiers to operation. Support the area completion team lead in ensuring development and execution of effective turnover handover process ensuring a smooth transfer of ownership to the final asset team. Liaise with upstream, inspection team and area completion to ensure clarify of scope, roles and responsibilities with of as a Zenator systems database lead to align with the handover strategy to demonstrate the integrity of the asset for start-up. Liaise with disciplines commissioning assurance team to monitor and advise commissioning management team on blocks to progress towards completion of handover dossiers to meet rfsu. Liaise with information management team to identify handover requirements outside of Zenator and ensure deliverables are clear with requisite. Primarily lead implementation of an electronic mechanical completions system. Liaise closely with the engineering construction and commissioning. Review and comment against mechanical completion system identification and ITR list. Report the progress to the manager and implementation of mechanical completion management system. Implementation an electronic mechanical completion system for the asset ensure all offshore onshore construction, commissioning activities follow a mechanical completion management system ensure the development and updating of the project documentation. Ensure all vendor certification and documentation complies with statutory regulations requirements. Ensure mechanical completion data, documentation and handover documents are in accordance with project procedures. Compilation and verification of mechanical handover packages in line with agreed system handover schedule. Analyse certification data to identify trends and resolve any backlog issues, provide support to vendor for certification issues, and generate reports including progress and look ahead.
Owner: Shell/ Qatar Petroleum
Location: Shell Pearl GTL Project Industrial City, Ras Laffan, Qatar
Company: O2 Pearl VSA Consortium/ Saipem
Year: June 10, 2009 to November 15, 2010
Position: Electrical & Instrument Supervisor
Job Description:
Review plans and drawings in accordance with specifications and standards prior for implementation on site. Monitor daily discipline activities and verify compliance to project procedures, specifications and standards to ensure quality and integrity of the works performed on site. Identify quality problems, reject non-conforming items and deficiencies in executing works and recommend or provide solutions with client approval if required through designated channel control until rectification and any remedial action is approved. Maintain close working relationship with the construction personnel and with the client representatives to meet contractual project requirements. Fully aware of client specifications, contractual requirements, and applicable codes and standards relevant to Automation and E&I activities. Preparation of site queries if no available plans, drawings and information is in hand to prevent delays that may affect construction activities on site. Prepare and generate work permits on client controlled areas where permit to work is required to ensure safety and potential hazards be eliminated in performing site works. Ensure HSE is given highest priority and see to it that construction personnel are adequately trained to execute work assignment safely and comply with job instructions and identify potential hazards. With skills on material control and inspection of electrical and instrumentation equipment’s prior for installation on site Generate progress reports and monitor day to day activities on site as per procedure, drawings and specifications. Provides leadership to cause the creation of organizational structure and processes required to fully execute the requirements of quality services to meet project standards and early project completion date this has encompassed the direction of multidiscipline, multinational engineering and construction team through all phases of project execution. A consistent level of success has been achieved through diligence, being efficient and responsible to the assigned task and good communication skills. Coordinator in ensuring that quality risks are identified assessed and managed for all site construction project management activities resulting in high quality project delivery/execution. Establishing the company specifications, procedures, codes and standards as central technical resources for all engineering and construction activities. Reviewing and developing punch lists with sub-contractors and cleaning or closing of these punch lists issues towards mechanical completion. Assisting completions and certification manager with directing sub-contractors for check sheets and documentation. Establishes and ensure adherence to standard of quality control construction personnel and engineering related areas, includes supervising the inspection quality standards, ensure that standards and codes for all construction activities and engineering works are properly observed by review of reports and another documentation, resolving any problems of materials used in all project and equipment’s. Ensure that project engineering standards comply with quality and integrity requirements and applied at the various stages of new project. Participate in design reviews, technical kickoff meetings, subcontractors kick off meetings, and vendor’s kickoff meetings to assurance quality requirements are understood and implemented. Fully understand with regards to hazardous area and industrial type area. I have fully knowledge all required report documents required as per project specification all related for Electrical and Instrument description. Assist with compilation of Pre-commissioning\Commissioning Manuals by Subsystem and Systems. Provide detailed input into population of commissioning database for Electrical and Instrument discipline. Assist with preparation of pre-comm\commissioning execution schedule. Assist with preparation of commissioning operational procedures (OTP) as required. Attend FAT’s where necessary and compile FAT punch list & FAT reports, liaise closely with relevant Contractors and Vendors, Attend meeting where required. Uphold HSE policies at all times. Attend relevant HSE meetings where required. Visit warehouse when required, for any package\equipment inspection prior to dispatch to site, prepare detailed lists of all tools and test equipment to be used at site for Electrical and Instrument. Attend regular meeting with company operations department as required.
Owner: Petrom, OMV Group.
Location: Komsomolskoe Oil Development Project &Pipe Line
Company: ILF Consulting Engineers, Germany
Year: August 4, 2008 to June 30, 2009
Position: Electrical Qc Supervisor
Job Description:
Monitor the project and contractor schedules, review activity durations, and provide continuous to the Site Project Manager. Review the progress reports submitted by the contractor, analyze the activity durations and integrate into the project plans. Verify and control contractor competence and qualification to obtain best results with respect to technology, quality and schedule, kept and prepare record related to the work performed and materials and supplies used. To ensure that all company safety rules and regulations are implemented are followed. Monitor, inspect and verify the performance of the E&I construction activities at site as per the schedule. Monitor to ensure that work is completed in a professional, safe environmentally friendly fashion at all times. Develop, in conjunction with the construction contractor, safe & practical work procedures and methodology statements that cover all major planned activities to be undertaken during the completion of the works. To ensure that method statement and associated risk assessments for critical construction activities are prior to the work commencing & that finding passed down to the workforce at the start of each working activities. Review and approved multi-discipline commissioning procedures ensure compliance with project standards, specifications and procedures. Ensure all commissioning activities adhere to all applicable site/project safety procedures and practices. Reviews monitor the performance of the detailed design to ensure that the EP Contractor assigns the appropriate discipline resources to execute the work to the required quality, standard and within the agreed schedule. Maintain a good working relationship with the clients’ sub-contractors engineering representatives. Monitoring to ensure implementation and compliance with project policies and processes for success of the documentation management activities and deliverables in accordance with agreed schedules, milestones. Monitoring all aspects of construction works pre-commissioning and commissioning ensuring safe and to achieve the Quality execution and adherence to Company Standard and specifications and the agreed construction schedule. Planning and scheduling of required works. Daily review report of construction progress, and initiates the corrective actions if required. Coordinate to managers areas/items of concern. Tracking of contractor compliance to Company HSE Procedures and Standards as well as participating in HSE inspections and audits. Clarify company policy statements and Kazakhstan statutory health, safety environmental regulations and occupational hygiene as well to personnel and contractor, enforce adherence of all the personnel to these procedures. Give full support to the policies, goals, efforts and programs of the Kom Munai health Environment and Safety Management System. Maintain good communications with other discipline supervisors to ensure no interface problems occur. Supervise all installation, hook up, erection, trenching lowering, ballasting and hydro test for gathering, export pipeline, central processing facilities and oil receiving facilities, Overhead Power Line for Oil Well.
Owner: Tingez Chevron Oil Company (TCO)
Prime Contractor: Parson Fluor Daniel International LLC (PFD)
Project: Second Generation Project
Location: Tengiz, Kazakhstan
Company: Fluor Daniel
Year: April 24 2007 to 26 June 2008
Position: E&I QC Inspector
Job Description:
Responsible for leading and managing the Quality Standard for all Electrical & Instrument aspect of Quality monitoring and reporting. Provide field based Quality supervision, support and assistance when required and supervise the activities as per company’s Quality Standards. Responsible for conducting, reviewing and overseeing all electrical & instrument aspect of Quality related activities, that all E&I Installation are executed without incident or minimal downtime. Reviewing, commenting and approval on documentation procedures by contractor’s eng’g. Technical reports specifications, procedures, drawings etc, and ensuring implementation of established procedures and good engineering practice supervising inspection and quality control during construction phase. Participate in reviews, technical kickoff meetings, subcontractors kick off meetings, and vendor’s kickoff meetings to assurance quality requirements are understood and implemented. Monitor to ensure all construction activities are per required codes and standards. Perform inspection of in process and completed work, Installation and testing to ensure compliance with project design specification and drawing in a timely manner. Ensure timely completion of QVD’s and forward to Quality Document Control Group for compilation into system dossiers. Perform walk down and document results to ensure compliance with project specifications and procedures. Developed and publish NCR’s and Surveillance Reports to identify and gain resolution of discrepancies observed during construction phase. Closely monitored contractor performance and review of documentation as work progresses will be required. Work closely with PFD superintendents and other inspectors daily to complete the inspections and ensure completion of required documentation and perform and report results of necessary walk downs. Knowledge of normative documentation (SNIPs, GOST, PUE etc.). Capability to manage, prioritize and quality control activities in a timely manner. Initiate work requests, modifications, and improvements and ensure company policies are upheld to the highest standards. Ensuring that the quality of work carried out complies with HSE standards. Reviewing and commenting on documentation produced by contractors (e.g. technical reports, specifications, procedures, drawings, etc.) ensuring implemented of established procedures. Monitoring and inspection for installation of instrument and electrical equipment’s and devices in accordance to drawing and project specification, Russian Electrical Code, NFPA 70 as National Electrical Code, British Standard, National Electrical Manufacturers Association,
American National Standard Institute, American Society for Testing and Materials, Institute of Electrical and Electronic Engineers, International, Electro-technical Commission, /NEC/IEC/94/9/EC(ATEX95)European ATEX Directives/ EEHA (Electrical Equipment in Hazardous Area) and other specified codes, Generate/develop database such as QVD, Surveillance, Punch list, NCR and E & I QC database through MS Access & Visual Basic Application to easily track all completed and outstanding QVD’s and generate daily & weekly reports. Check and review all cleared and outstanding QVD’s and Punch list in Complete IT (WINPCS) then do appropriate action for all outstanding Punch list and QVD’s. Fully understand with regards to hazardous area and industrial type area.
Owner: Qatar Petrochemical (QAPCO)
Prime Contractor: JGC Middle East FZE/ CTCI Overseas Corp.
Project: Ethylene Plant 2, Mechanical, Electrical & Instrumentation Installation
Location: Messaieed Industrial City, State of Qatar
Year: September 15, 2005 to March 20, 2007
Position: E&I QC Inspector
Job Description:
Inspect instrument and electrical equipment upon receipt, monitor instrument and electrical equipment preservation activities, Inspect electrical equipment foundations and verify survey results, Inspect installation of electrical equipment such as transformers, switchgear, and generators to include, setting, grounding, termination, testing and final inspection, Inspect cable installation including trenching, duct bank installation, cable trays, earthed, terminations, continuity testing and Hi-pot testing, Inspect instrument installation including pre-installation calibration, installation, tubing installation, signal cable installation, loop checking and final test, Wetness bench testing of relief valve devices, inspect the installation of cathodic protection systems, Wetness flange bolt-ups, including verification on the face condition and gaskets, inspect equipment after completion to ensure all components are per the drawing and report deficiencies on the punch list, Witness pressure tests of instrument tubing including verification of temperature, pressure and calibration of test instrumentation, safety devices and verify leak test tightness, Conduct reinstatement walk down and log outstanding items on the punch list, Inspect heat tracing installation, witness continuity, final test and punch list, Receiving inspection of incoming electrical materials and equipment specified on purchase order. Control of non-conformance responsible to identify material problems, issuance of NCR, recommended resolution to problems and ensure that non-conformance is fully and promptly corrected. Conduct inspection and monitoring of electrical and installation. Prepare electrical package, monitoring and witness of Pre-commissioning and commissioning prior to start-up and customer acceptance. Conduct inspection in preparing punch list for mechanical completion certificate. Prepare and submit test reports on various testing, Prepare day to day inspection items / records and Punch list. Review and execute of the Approved Project Quality Plan, Field QA/QC Manual, and Work method. Particularly in Inspection Test Plan Electrical and Instrumentation works & Project Turnover plans, Verify that the equipment’s and instruments to be utilized for executing the routine, production test are controlled, suitable and calibrated. Check / verify the test, material, laboratory certificates and confirm that the results comply with the specification and international code & standards. Preparation the Inspection test packages, testing & commissioning plans and procedures for Electrical and Instrumentation equipment. Reviewing the loop folder of electrical & instrument prior to loop checking, and putting into the service all electrical and instrument the plant, compiling turnover packages to client. Verification of Materials & Equipment delivered to check conformance as per specification/vendor’s drawings, Visual inspection checked for free from damage during transport. Verify quality control method used to demonstrate compliance are carried out and documented properly witnessing inspection and test, conducting periodic surveillance and participating in audits. Provide technical assistance to site quality manager field engineering construction, Area QC Supervisor and Contractor for quality related issued in respective area of expertise. Be certain that accurate and complete technical documents are available and properly supplied from the client to perform the inspection activities.
Owner: Petron Bataan Refinery Limay, Bataan Philippines
Prime Contractor: CTCI Construction Inc. Petron Bataan Refinery
Project: GOHT & Isomerizes/on Plant
Location: Petron Bataan Refinery, Limay Bataan, Philippines
Year: October 21, 2004 to April 15, 2005
Position: Sr. Electrical Supervisor
Job Description:
Supervise the safe completion of the project system pre-commissioning/commissioning work-scope. To ensure all system commissioning activities adhere to all applicable site/ project safety procedures and practice. Monitor to ensure specific commissioning data is input to ensure punch list data is received and input correctly and progress reports are generated. Ensure that all the necessary supporting documentation is in place and compliance with the legislative and project requirements, Monitor compliance of certification documentation, both retention handover. Generation of status reports interface with hook-up contractor for sub system handover walk downs and allocation of punch list responsibilities and categorisation, interface QA/QC for certification reviews/acceptance prior to handover. Directing supervise daily commissioning activities as delegated by the lead commissioning engineer.Supervise the Quality control activities on site, including Quality Control inspection schedules; perform for inspection as well as collection/availability of reports and Quality Records issued by Subcontractors inspection team. Verify Quality Plan, Quality Control plans, testing and inspection procedures. Ensure agreed inspection strategies, procedures, standards and plans are implemented and completed by Subcontractor construction team personnel and any failures, variations and amendments are feedback into the client representative. Receiving inspection of incoming electrical materials and equipment specified on purchase order. Control of non-conformance responsible to identify s during the execution of NCR, recommended resolution to problems and ensure that non-conformance is fully and promptly corrected. Conduct inspection and monitoring of electrical and installation. Prepare electrical package, monitoring and witness of Pre-commissioning and commissioning prior to start-up and customer inspection in preparing. Review Quality Plan of suppliers of critical equipment/ material, ensure subcontractor is performing quality reporting per the contract, review metrics and identify assist resolution of issues. Monitor and, when necessary, assist in development of the Quality portion of site close-out reports. Monitor the compilation of certification documentation, both retention and handover. Punch list for mechanical completion certificate. Prepare and submit test reports on various testing, Prepare day to Day inspection items / records and Punch list. Supervise construction contractors during the execution of construction activities at the construction including inspections, material submissions and working drawings from contractors, acceptance. Conduct and processing documentation as required, direct the activities and check the works of contractors involved in electrical and instrument construction works on behalf of client, carry out daily checks on contractor’s staff and work carried out during the previous day in order to ensure compliance with prescribed contractual specifications, liaise with quantity surveyors in order to determine physical progress and percent of completed work for the preparation of monthly progress, monitored the subcontractor’s daily activities ensuring that safety procedures were followed and that quality workmanship met project standards and specifications. Review and endorse inspection reports to ensure that inspection frequencies are maximized. Monitor the performance and overall progress of construction inspections to ensure adherence to established requirements for quality. Monitor activities of construction subcontractors to ensure materials, installation, and construction comply with established acceptance criteria.
Owner: Exxzon Mobil Esso Exploration & Production
Prime Contractor: KBR Kellog Brown & Root
Project: Esso Exploration & Exploration & Production Chad Inc. Chad Africa Development (Onshore)
Location: Central Chad Africa
Year: March 14, 2004 to September 17, 2003
Position: Electrical Commissioning Technician
Owner: PNOC-Petrochemical
Prime Contractor: N. C. David Construction & Tracking
Project: Tank 400 & Facilities & 3rd Fire Pump
Location: PNOC-Petrochemical Complex, Mariveles, Bataan Phils.
Year: y January 4, 2000 to March 10, 2003
Position: Electrical Supervisor
Owner: SAUDI ARAMCO)
Prime Contractor: Mc Connell Dowell
Project: Upgrading Control Systems, Saudi Refinery 2
Year: June 2, 1999 to December 20, 1999
Position: Electrical Foreman
Owner: Nigeria Liquefied Gas (NLNG)
Prime Contractor: TSKJ.
Project: Nigeria Liquefied Gas (NLNG)
Location: Bonny Island, Nigeria
Company: Cimimuntubi/ Atlantic Gulf & Pacific Co. of Manila (AG &P)
Year: March 28, 1998 to March 24, 1999
Position: Electrical Foreman
Owner: Formosa Plastic Corporation
Prime Contractor: Samsung Engineering Construction Co. Ltd.
Project: Ethylene / Aruma Plants (Petrochemical)
Location: Taiwan R.O.C
Year: October 05, 1996 to January 27, 1998
Position: Electrical Supervisor
Owner: PNOC-Petrochemical
Prime Contractor: UHDE German
Project: Polypropylene Plant
Location: Petrochemical Complex, Mariveles Bataan
Company: Atlantic Gulf & Pacific Co. of Manila (AG&P)
Year: September 1994 to September 1996
Position: Electrical Foreman
Location: National Power Plant Limay, Bataan Phils.
Company: Atlantic Gulf & Pacific Co. of Manila
Year: May 1992 to August 1993
Position: Electrician
Strong Knowledge Computer Literate & Completion Management Systems: – Zenator Tools, WINPCS, AutoCad 2D\3D, MS Windows & MS Internet Browsers, Outlook, Excel.