Professional Qualifications
• City and Guilds 2391 – Test and Inspection
• City and Guilds 2381 – 17th Edition BS7671:2008 Wiring Regulations
• City and Guilds 2330 level 2 & 3 – Electrical Installation
• IPAF – 3a & 3b (Mobile Scissor Lift and Mobile Boom)
• Nebbs Management Certificate
• SMSTS (Site Managers Safety Training Scheme)
• Paxton Door Access Control Installers Course (Paxton Registered Installer)
Professional Training
• Fully conversant with Microsoft office 2013 including Visio and Project
• Working Knowledge of Auto-Cad
Profile
Experienced and dedicated professional electrician with many years of working within the domestic, commercial and industrial sectors. Working as a commissioning and qualified test and inspection electrical has taught me the need to work to a set process and the highest standards ensuring compliance with the current regulations, this will ensure that the documentation is completed right first time.
Working within the family business has meant I have taken on many different roles and tasks including man managing 50+ non – English employees, this has necessitated having a flexible approach to ‘getting the job done’ on time and to budget
Career Summary
Senior Site Supervisor – Electrical – Uphill Engineering Ltd,
(July 2014 – present)
Current Contract for Workspace Technology Ltd & Trilec Communications Services Ltd.
The duties included
• Supervision of 45 employees and sub-contractors for all M & E installations.
• Large Industrial Generator Projects
• Data centre power and data cable installation & pro-active and re-active maintenance
• Door Access Control Installation
• Commissioning and testing of installations
• Production of all documents including OEM’s, Health and Safety Documents and Risk Assessments
• Periodic Inspection and Testing of Fixed wire installations including DATA Centres
Electrical Supervisor – Uphill Engineering Ltd,
(June 2008 – July 2014)
Major Contract for Workspace Technology Ltd.
The duties included
• Supervision of 45 employees and sub-contractors
• Large Industrial Generator Projects
• Diesel rotating uninterruptable power supply (DRUPS) installation
• Cable Containment including ladder rack, cable tray, trunking and conduit installation
• Data centre power and data cable installation
• Commissioning and testing of installations
• Periodic Inspection and Testing of Fixed wire installations
• Complete home and office rewires
• Commercial Business renovation
• Fault finding and Rectification
• Preventative and reactive maintenance work
• Repair work
• Call out and Emergency Repairs
Electrical Contractor – Uphill Engineering Ltd,
(Nov 2006 – June 2008)
The duties included
• Complete home rewires
• Commercial Business renovation
• Fault finding
• Preventative and reactive maintenance work
• Repair work
Electrical Contractor – Self-employed within family business
(Jan 2002 – Nov 2006)
• Employed within family business, ensuring that all contracts were completed on time and to Budget
The jobs included
• Home and office renovation
• 6 month contract to London Underground (Metronet) – managing 50 non-English staff
• Reactive Maintenance work
• Restaurant renovation