Qualifications
• Electrical College LTS (diploma )
• Electrical Technician College MTS (diploma)
• Safety Training VCA 2 “VOL”
• Shell “Vop voor toegang tot elektrische bedrijfsruimten“
• Cursus Atex Richtlijn 137
• Cursus NEN-EN-50110 / NEN-3140 / NEN-3840
• Cursus Working with a mobile boom elevating work platform,cat,3B
• Cursus Working with a mobile boom elevating work platform,cat,3A
• Cursus Working with independent respiratory protection(breathing apparatus)
• Cursus Working twin ferrule fittings
• Cursus Working on flange connections according to protocol
• Cursus Working with a forklift truck
• Cursus Handling loads
• Foreign languages: Dutch, English, Turkish
Career Summary
February ’11-
* Witnessing loop checks for the client from devices to Metso DCS completed by main contractor Technip/ESD testing.
* Commissioning, inspection and start-up E&I installation on the bio plant
* New and turnaround projects in bio plant.(start-up&Pre-commissioning)
* Initial maintenance ,for Nesteoil Maasvlakte
Function: Commissioning Engineer
July ’10 – February ’11
Commissioning and inspection of E&I installation on the chemical plant of Aluminium & Chemie Rotterdam B.V
Function: Commissioning/ supervisor
May ’09 – July ’10
Commissioning and inspection of E&I installation on the chemical plant of Cerexagri Rotterdam-Pernis (start-up&Pre-commissioning)
Function: Commissioning/ supervisor
January ’09 – May ’09
Commissioning and inspection of E&I installation on the chemical plant of KPE Europoort.( start-up&Pre-commissioning)
Function: Commissioning Engineer
June ’08 – January ’09
Commissioning, inspection and start up of E&I installation on the refinery plant of Shell Pernis (COF2, AIR LIQUEIDE, PGP, TGI, SGHP, CMR, COD, SRU, RCT, ROM, RWZ, RDU (Steamload shedding project, Gasfiring project CD5, Vacum upgrade project CD5).
Function: Commissioning Engineer
April ’08 – June ’08
Commissioning and inspection of E&I installation on the chemical plant of Voridian Europort
Function: Commissioning Engineer
June ’07 – April ’08
Commissioning, inspection of E&I installation on the refinery plant of Total Fina Antwerp for Foster Wheeler Italiana
Function: Commissioning Engineer
May ’06 – June ’07
Commissioning, inspection of E&I installation on the chemical plant of GE Plastics Bergen op Zoom
Function: Commissioning Engineer
January ’06 – May ’06
Commissioning, inspection of E&I installation on the chemical plant of Shinatsu Pernis and for Huntsman (MDI-2) Rozenburg
Function: Commissioning Engineer
March ’04 – December ’05
Commissioning and preparation (PC, MC) for an oil drill platform for AIOC (BP)
(Azerbaijan oil company),on Mercon construction in Gorinchem.
Function: Commissioning Engineer
December ’03 – March ’04
Several small project, E/I modifications in chemical industries for Monax
Function: Commissioning Engineer
September ’03 – December ’03
Commissioning, inspection and start up of E&I installation on the chemical plant of Dupont Dordrecht.
Function: Commissioning E&I
February ’02 – September ’03
Commissioning of fire and gas system on the Lyondell maasvlakte,
Function: Commissioning E&I
March ’01 – January ’02
Commissioning, inspection and start up of E&I installation on the medical plant of DSM delft.
Function: Commissioning E&I
March ’00 – February ’01
Construction of no. 6 CCR platform unit for Petrochemie.
Supervision of a team responsible for electrical & instrumentation, testing and inspection. This includes complete installation of control- and sub-control room equipment.~
Function: Commissioning E&I
September ’99 – February ’00
Commissioning and start up of E&I installation on the power plant of EPZ, Geertruidenberg
Function: Technician E&I