Career Summary
Total Work Experience of 5 Years in the field of Heavy Steel Structure and MEP Projects
( HVAC, Plumbing & Fire Fighting ) in fields like HVAC Engineer, HVAC Maintenance Engineer,
HVAC Site Engineer.
Companies Worked:
M/s Nexstar MEP Solutions Pvt Ltd, Bangalore, India.
M/s Super Engineering Industry LLC, Abu Dhabi, UAE.
M/s One World Inc, Bangalore, India.
Career Summary
• M/s Nexstar MEP Solutions Pvt Ltd, Bangalore, India.
• Period: September 2nd 2013 to Till Date.
• Designation: HVAC Engineer.
• M/s Super Engineering Industry LLC, Abu Dhabi, UAE.
• Period: June 28th 2011 to August 17th 2013.
• Duration: 2.2 years.
• Designation: Project Coordinator.
• M/s One World Inc, Bangalore, India.
• Period: August 03rd 2010 to June 18th 2011.
• Duration: 1 year.
• Designation: HVAC Engineer.
TEAM MANAGEMENT
Recruiting, mentoring, training and development of team members to ensure proper resource training prior to appointment at site.
Qualifications
Bachelor Degree : B.E in Mechanical Engineering.
Name of Institution : St. Aloysius International University, Bangalore, Karnataka
Courses : Diploma in MCAD (AutoCAD & Solid Works)
Name of Institution : CADCom, Bangalore.
Courses : Diploma in HVAC-MEP (Design & Drafting)
Name of Institution : TEC, Bangalore.
Courses : Computer Aided Design
Name of Institution : Manipal Institute Of Computer Education, Bangalore
Courses : IES Virtual Environment, Green Building
Name of Institution : Integrated Environment Solution, Bangalore
Courses : HPMP, HCFC Phase-out Management Plan
Name of Institution : HPMP, Under Govt of India, Bangalore
Experienced in using software : Solid works, AutoCAD, MS-Word and MS-Excel, MS- Power Point.
Project Management
Handling client interaction for requirement gathering, finalization of functional specification.
Review of Technical Submittal, Qc Documents.
Interacting with and guide team members to ensure smooth progress of project work.
Overseeing raw material purchase, fabrication with quality procedures, coordination with Client, attending meeting with various clarifications with site visit etc.
Lead the mechanical HVAC engineering for a variety of clients. Projects will include building mechanical systems and central plants.
Lead the development of design and construction documents, including flow diagrams, plans and sections, details, specifications, equipment schedules, and calculations.
Size and specify mechanical equipment, including air handling units, chillers, cooling towers, compressors, etc.
Coordinate with other technical staff including site civil, structural, electrical, instrumentation, controls, and architectural.
Coordinate with in-house construction personnel for Design-Build projects.
JOB RESPONSIBILITIES.
• Sole in charge of complete project reporting to project manager.
• Monitoring and maintaining the progress & quality of work.
• Check and order material as per the specifications, follow specifications for other works as well.
• Co-ordinate with multiple sub-contractors to ensure smooth flow of work.
• The company specialization in installations of Air / Water Cooled Chiller Packages, Pumps, Cooling Towers, Chilled-Condenser Water Piping.
• Installation and maintenance of Ductable split packaged, Fabrication and Ducting, Fire fighting sprinkles.
• Coordinate with consultant to get work done approved, generate RFI, etc.
• Co-ordinate with M.E.P and Civil department to check services
• Study and check the drawings before issuing to the sub-contractor.
• Preparation of bill of quantities and monthly bills & reports at site.
• Ensure safety at site as per high standards.
• Conducting Weekly meetings with subcontractor and co engineers to discuss and solve issues arriving at site, and to follow up for target dates.
• Report progress and discuss requirements to the seniors timely.
• Closing of project by raising final inspection and taking of clearing snags points.
• Co-ordinate with consultant for red mark and as built drawings.
• Commissioning and Air Balancing.
• Handling meetings with Clients/Architects & clarifying doubts, along with making proper co-ordination with HVAC vendors & other services and completing the projects successfully.
MAJOR JOBS HANDLED
• M/S : KENTECH INTERNATIONAL LTD.
PROJECT : LOPE UNIT – BOROUGE 3 PROJECT – RUWAIS
• M/S : LINDENBERG – EMIRATES LLC.
PROJECT : REPLACEMENT OF 11 KV SWITCH GEAR IN W13, E15, SALT & CLORINE SUBSTATION
• M/S : TOSHIBA CONSTRUCTION.
PROJECT : 400 KV SUBSTATION EXTENSION / 220 KV SUBSTATION EXTENSION.
• M/S : CCC – ADMA.
PROJECT : DAS ISLAND, (+) 100 MBD DAS FACILITIES UPGRADE PROJECT, DFUP.
• M/S : CCC SAS.
PROJECT : SAHIL AND SHA FULL FIELD DEVELOPMENT PROJECT
• M/S : CCC QFD.
PROJECT : QUSAHWIRA FULL FIELD DEVELOPMENT PROJECT.
• M/S : CCC QFD.
PROJECT : EPC FOR QUSAHWIRA FULL FIELD DEVELOPMENT 1.8 MMBOPD PROJECT
• M/S : SIX CONSTRUCTION.
PROJECT : ONSITE WASTE WATER TREATMENT PLANT FOR RAZEEN LABOR CITY.
• M/S : LARSEN & TOUBRO LTD.
PROJECT : 133/ 33 KV SUBSTATION AT KALBA
• M/S : LARSEN & TOUBRO LTD.
PROJECT : 132/33 KV SUBSTATION AT SUDAH PORT IN FUJAIRAH.
• M/S : HILALCO.
PROJECT : AL FALAH VILLAGE COMMUNITY PROJECT.
• M/S : PAL TECHNOLOGY.
PROJECT : AL WATANI RESIDENTIAL DEVELOPMENT
• M/S : AL HABTOOR LEIGHTON GROUP.
PROJECT : KHALIFA PORT & INDUSTRIAL ZONE INFRASTRUCTURE.
• M/S : HYUNDAI.
PROJECT : POWER PLANT (ABU DHABI).
• M/S : TAV-CCC-ARABTEC JV.
PROJECT : MTB PROJECT (AIRPORT PROJECT) – ABU DHABI.
• M/S : SAS FABBRIC LLC.
PROJECT : SIEMENS HEAD – QUARTERS, TENSILE FABRIC CANOPY.
• M/S : TAV-CCC-ARABTEC JV.
PROJECT : MID FIELD TERMINAL COMPLEX BUILDING PROJECT
• M/S : MAHAVEER JAIN HOSPITAL, ( BANGALORE )