Career Summary

Total Work Experience of 5 Years in the field of Heavy Steel Structure and MEP Projects

( HVAC, Plumbing & Fire Fighting ) in fields like HVAC Engineer, HVAC Maintenance Engineer,

HVAC Site Engineer.

Companies Worked:

M/s Nexstar MEP Solutions Pvt Ltd, Bangalore, India.

M/s Super Engineering Industry LLC, Abu Dhabi, UAE.

M/s One World Inc, Bangalore, India.

Career Summary

• M/s Nexstar MEP Solutions Pvt Ltd, Bangalore, India.

• Period: September 2nd 2013 to Till Date.

• Designation: HVAC Engineer.

• M/s Super Engineering Industry LLC, Abu Dhabi, UAE.
• Period: June 28th 2011 to August 17th 2013.
• Duration: 2.2 years.
• Designation: Project Coordinator.

• M/s One World Inc, Bangalore, India.
• Period: August 03rd 2010 to June 18th 2011.
• Duration: 1 year.
• Designation: HVAC Engineer.

TEAM MANAGEMENT

 Recruiting, mentoring, training and development of team members to ensure proper resource training prior to appointment at site.

Qualifications

Bachelor Degree : B.E in Mechanical Engineering.
Name of Institution : St. Aloysius International University, Bangalore, Karnataka

Courses : Diploma in MCAD (AutoCAD & Solid Works)
Name of Institution : CADCom, Bangalore.

Courses : Diploma in HVAC-MEP (Design & Drafting)
Name of Institution : TEC, Bangalore.

Courses : Computer Aided Design
Name of Institution : Manipal Institute Of Computer Education, Bangalore

Courses : IES Virtual Environment, Green Building
Name of Institution : Integrated Environment Solution, Bangalore

Courses : HPMP, HCFC Phase-out Management Plan
Name of Institution : HPMP, Under Govt of India, Bangalore

Experienced in using software : Solid works, AutoCAD, MS-Word and MS-Excel, MS- Power Point.

 

Project Management

 Handling client interaction for requirement gathering, finalization of functional specification.

 Review of Technical Submittal, Qc Documents.

 Interacting with and guide team members to ensure smooth progress of project work.

 Overseeing raw material purchase, fabrication with quality procedures, coordination with Client, attending meeting with various clarifications with site visit etc.

 Lead the mechanical HVAC engineering for a variety of clients. Projects will include building mechanical systems and central plants.

 Lead the development of design and construction documents, including flow diagrams, plans and sections, details, specifications, equipment schedules, and calculations.

 Size and specify mechanical equipment, including air handling units, chillers, cooling towers, compressors, etc.

 Coordinate with other technical staff including site civil, structural, electrical, instrumentation, controls, and architectural.

 Coordinate with in-house construction personnel for Design-Build projects.

JOB RESPONSIBILITIES.

• Sole in charge of complete project reporting to project manager.

• Monitoring and maintaining the progress & quality of work.

• Check and order material as per the specifications, follow specifications for other works as well.

• Co-ordinate with multiple sub-contractors to ensure smooth flow of work.

• The company specialization in installations of Air / Water Cooled Chiller Packages, Pumps, Cooling Towers, Chilled-Condenser Water Piping.

• Installation and maintenance of Ductable split packaged, Fabrication and Ducting, Fire fighting sprinkles.

• Coordinate with consultant to get work done approved, generate RFI, etc.

• Co-ordinate with M.E.P and Civil department to check services

• Study and check the drawings before issuing to the sub-contractor.

• Preparation of bill of quantities and monthly bills & reports at site.

• Ensure safety at site as per high standards.

• Conducting Weekly meetings with subcontractor and co engineers to discuss and solve issues arriving at site, and to follow up for target dates.

• Report progress and discuss requirements to the seniors timely.

• Closing of project by raising final inspection and taking of clearing snags points.

• Co-ordinate with consultant for red mark and as built drawings.

• Commissioning and Air Balancing.

• Handling meetings with Clients/Architects & clarifying doubts, along with making proper co-ordination with HVAC vendors & other services and completing the projects successfully.

MAJOR JOBS HANDLED

• M/S : KENTECH INTERNATIONAL LTD.
PROJECT : LOPE UNIT – BOROUGE 3 PROJECT – RUWAIS

• M/S : LINDENBERG – EMIRATES LLC.
PROJECT : REPLACEMENT OF 11 KV SWITCH GEAR IN W13, E15, SALT & CLORINE SUBSTATION

• M/S : TOSHIBA CONSTRUCTION.
PROJECT : 400 KV SUBSTATION EXTENSION / 220 KV SUBSTATION EXTENSION.

• M/S : CCC – ADMA.
PROJECT : DAS ISLAND, (+) 100 MBD DAS FACILITIES UPGRADE PROJECT, DFUP.

• M/S : CCC SAS.
PROJECT : SAHIL AND SHA FULL FIELD DEVELOPMENT PROJECT

• M/S : CCC QFD.
PROJECT : QUSAHWIRA FULL FIELD DEVELOPMENT PROJECT.

• M/S : CCC QFD.
PROJECT : EPC FOR QUSAHWIRA FULL FIELD DEVELOPMENT 1.8 MMBOPD PROJECT

• M/S : SIX CONSTRUCTION.
PROJECT : ONSITE WASTE WATER TREATMENT PLANT FOR RAZEEN LABOR CITY.

• M/S : LARSEN & TOUBRO LTD.
PROJECT : 133/ 33 KV SUBSTATION AT KALBA

• M/S : LARSEN & TOUBRO LTD.
PROJECT : 132/33 KV SUBSTATION AT SUDAH PORT IN FUJAIRAH.

• M/S : HILALCO.
PROJECT : AL FALAH VILLAGE COMMUNITY PROJECT.

• M/S : PAL TECHNOLOGY.
PROJECT : AL WATANI RESIDENTIAL DEVELOPMENT

• M/S : AL HABTOOR LEIGHTON GROUP.
PROJECT : KHALIFA PORT & INDUSTRIAL ZONE INFRASTRUCTURE.

• M/S : HYUNDAI.
PROJECT : POWER PLANT (ABU DHABI).

• M/S : TAV-CCC-ARABTEC JV.
PROJECT : MTB PROJECT (AIRPORT PROJECT) – ABU DHABI.

• M/S : SAS FABBRIC LLC.
PROJECT : SIEMENS HEAD – QUARTERS, TENSILE FABRIC CANOPY.

• M/S : TAV-CCC-ARABTEC JV.
PROJECT : MID FIELD TERMINAL COMPLEX BUILDING PROJECT

• M/S : MAHAVEER JAIN HOSPITAL, ( BANGALORE )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 