CV, India Based Asstistant QC, E And I Manager

Available
Serial No: 17699
Skills keywords: 
Current location:  Bihar, India - View on map
Nationality: --------------------
Spoken languages: Arabic, english, Hindi

Qualifications

 Bachelors of Engineering in Electronics & Communication from, BIT Mesra Ranchi, in the year of 1999 with 1st Class.

 Diploma in Quality Management & ISO 9000 From National Institute of Labour Education & Management, Adyar, Chennai, in the year of 2009 with first Class.

 Diploma in Quality Control & ISO 9000 From National Institute of Labour Education & Management, Adyar, Chennai, in the year of 2008 with first Class.

Career Summary

An E&I Quality Control Engineer / Commissioning Engineer with more than 13 years of experience in the Oil & Gas Project & Maintenance (onshore) in Middle East and India. Comprehensive experience includes construction Inspection; testing and pre-commissioning / commissioning and maintenance work related Electrical & Instrumentation activities

1. Orranization : BCR ( BARAUNI PETROCHEMICAL & OIL REFINERY )
Position : ASST. QA/QC Manager-Electrical & Instrumentation
Period : 22nd August 2013 to Till date.
Project : Bokaro Oil Refinery Extension Project.
Company : BCR Govt. of India.

Work description :

Reporting to the Project Manager for all the aspects of E& I construction qualityactivities

Monitor the performance of the work to ensure that the contractor assigns the appropriate resources to execute the work to the required quality, standard and within the agreed the schedule.

Attend weekly meeting with production to expedite the quality issues

Manage documentation transfer for approval/ review between contractor and company.

Assure that local and international standards are followed. Identifies deviations in the design job scope, construction works and raise deviations and follow up action.

Hook up drawings covering specification & Documentation prior to installation

Evaluating to the QC Personnel Competency of sub contractor for approval

2. Organization : TECNICAS REUNIDAS, Abu Dhabi, UAE
Position : QC E&I Engineer.
Period : 23rd Jan 2012 to 05th June 2013.
Project : Sahil Asab & Shah full field Project.
Company : ADCO- Abu Dhabi onshore Oil Company, UAE

Work description :

 Coordinate with the site QC manager for the completion of as-built turnover

documentation.

 Attend the weekly QA/QC, and commissioning meetings coordinate any

Inconsistencies with Test packages with the field QC site inspectors. Monitor and control the status of punch list and exception lists relevant to quality

dossiers.

 Review supplier’s inspection and test plans against the milestone scope of work.

 Involved in the preparation of Quality Control Plan for the awarded contract, reviewing QCP and ITP and implementation of QCP & ITP’s in accordance with Project specification.

3. Organization : Chiyoda Technip Joint Venture Company, QATAR.
Position : Electrical QC Engineer.
Period : 01st Aug 2006 to 30th Nov 2011.
Project : Qatar Gas-II & QCS LNG Onshore Expansion Project.
Company : Qatar Gas, Ras Laffan, Doha, Qatar.

Work description :

 Responsible for switchgear, transformer, motor, ups testing in substation.

 Prepare and study technical drawings, specifications of electrical systems.

 Supervise and train commissioning team at the Project.

 Investigate and test vendor’s and competitors products.

 Plan layout of electric power generating plants and distribution lines and stations.

4. Organization : Petrofac International Ltd., Doha, Qatar…
Position : Quality Control Engineer Instrumentation
Period : 04th Feb 2005 to 30th Mar 2006.
Project : Qatar Petroleum- NGL-1, 2, 3, 4 Projects.
Company : QP. Qatar petroleum, Doha, Qatar.

Work description :

 Organized the project team of QC Inspectors (E&I), conducted vendor inspection for Materials in-process Inspection & final inspection.

 Involved in documentation of receiving materials in-process and final inspection of Electrical and instrumentation works.

 Coordinating with the Project Engineer to develop project plans and ensure Successful Execution of the project.

 Evaluating construction drawings for possible changes.

5. Organization : Saudi Oger Ltd., Saudi Arabia.
Position : Maintenance Engineer.
Period : 02nd Oct 2001 to 30th Dec 2004.
Project : SWCS, Jubail, Saudi Arabia
Company : Royal Commission, Saudi Arabia.

Work description :

 Ensure that the quality of work carried out in accordance with Project Specification and other approved standard of company.

 Responsible for switchgear testing like-: Bus bar-IR, Contact resistance & Hi- pot, CT/VT- IR, winding, Ratio, Polarity & magnetization, Relay test, ATS
test, Functional test for drawers.

 Responsible for Transformer Testing like-: IR, Winding, Ratio, Polarity, Magnetization, Vector test, Oil dielectric test, Functional test, Differential Stability test.

 Responsible for Motor Test like-: IR & Winding, Differential protection test, Solo run & bump test, motor direction test.

6. Organization : Fafco Ltd. (Saipem Ltd.), Saudi Arabia.
Position : Junior Instrument QC Engineer.
Period : 04th Jul 2000 to 28th Aug 2001.
Project : Rastanura & Jeddah – Refinery.
Company : ARAMCO- Arabian Oil Company, Saudi Arabia.

Work description :

 Responsible for compilation of Instrumentation dossiers and documentation to Facilitate the hand over all the system from construction phase to Pre-Commissioning phase.

 Assist QA/QC Manager to Established Project Specification, Method Statement, QCP / ITP for E & I.

 Responsible for Installation / mechanical Completion for Instrumentation System. DCS/PLC/ESD/FAS-System Cabinet, Marshaling cabinet, Junction

Box, Field mounted instrument like PT, TT, FT, LT Switches, Gauge’s, and MOV & Control Valves Etc.

JOB PROFILE:-

 Inspection & Witnessing according to Project Specification, QCP, ITP & Method of Statement, International standard and other approved reference Document as per Company standard.

 Ensure that the quality of work carried out in accordance with Project Specification and other approved standard of company.

 Responsible for switchgear testing like-: Bus bar-IR, Contact resistance & Hi-pot, CT/VT- IR, winding, Ratio, Polarity & magnetization, Relay test, ATS test, Functional test for drawers.

 Responsible for Transformer Testing like-: IR, Winding, Ratio, Polarity, Magnetization, Vector test, Oil dielectric test, Functional test, Differential stability test.

 Responsible for Motor Test like-: IR & Winding, Differential protection test, Solo run & bump test, motor direction test.

 Routine Area Surveillance of Electrical & Instrumentation construction activities.

 Updating day-to-day Inspection, Test & Area Surveillance report to QA/QC Manager.

 Issuing (NCR) Non-conformance report, (CAR) Corrective action Report, (PTQR) Project technical Query Report, (DR) Damage Report when the specification or procedural requirements are not met.

 Coordination with Consultant and Client on all aspects of site inspections.

 Responsible for compilation of Instrumentation dossiers and documentation to facilitate the hand over all the system from construction phase to Pre- commissioning phase.

 Assist QA/QC Manager to Established Project Specification, Method Statement, QCP / ITP for E & I.

 Reviewing the engineering document and maintaining the latest revision of all contract documents, Drawing, Specification and standards required for Quality Assurance & Quality Control Inspection.

 Ensure the discipline punch list are created for Inspection Hold point and completed before the requirement, clearing the punch list.

 Responsible for receiving the RFI (Request for Inspection) raise by construction Engineer /Supervisor after completion of job. Carrying Internal / Pre- Inspection and forwarding it to Consultant & Client for group Inspection and his acceptance.

 Make verification for the RFI submitted by the construction department, work to be inspected is complete and in compliance with the Engineering Standard & Material shall conform to all applicable requirements standard. Verifying and reviewing the construction drawings covering ISS, P&ID, ILD, SLD, Layout Drawing, Hook-Up Drawing, Typical Drawing and Wiring Details etc.

 Carrying Internal Inspection prior to issuing notification for MCN Mechanical System Completion Notification to Client. Carrying group Inspection for MCN & Final Walk through with Consultant & Client

 Responsible for updating the ITR Inspection Test report, taking client signature for his approval, Submitting the ITR to Certification department for record keeping , system updating and maintaining QC documentation, Reviewing the final QC documentation.

 Responsible for Installation / mechanical Completion for Instrumentation system. DCS/PLC/ESD/FAS-System Cabinet, Marshaling cabinet, Junction Box, Field mounted instrument like PT, TT, FT, LT Switches, Gauge’s, and MOV & Control Valves Etc.

 Responsible for the Installation of Fire & Gas, Telecommunication System in the Field such as Push Button, Horn & Beacon and Fire & Smoke Detection and Analytical Instrument.

 Inspection for the Installation of CCTV camera & Speakers in the Electrical Substation and Main Control Building.

 Visual inspection of all types of electronics & Pneumatic instrument like PT, TT, FT, LT Switches, Gauge’s & Control Valves, MOV etc, and Witnessing the calibration of Instrument at site Calibration workshop & field.

 Reviewing the Instrument Hot Loop packages and witnessing Instrument Final Hot Loop check.

 Inspection for installation & rooting of Instrument Air Piping, Tubing /Impulse tubing, and Witnessing the Pressure & Leak Test.

 Inspection for Laying, Dressing, Glanding and Termination for EC, LV, MV, HV Control, Power & instrument (UG/AG) Cable.

 Inspection of Cable trays and Conduit in the Field and inside Control Building.

 Inspection for the Instrument Cable Trenches prior to cable Pulling and after Cable Pulling to release for the next activities. Inspection for Cable Rooting, Dressing and tagging in side cable trench.

 Inspection for the Installation of Earthing (Grounding) Cable and Bus bar in the Field and Buildings and Connection to the equipment as per the approved drawing and specification.

 Assuring the valid Calibrated IMTE is being used during Inspection & Test and Calibration Certification is maintained.

 Familiar with international standards ISA, IEC, ANSI, API, NEC, NEMA, NFPA, BS etc.

 Conversant with engineering Drawing such as P&ID, Hook-up, ILD, Termination Detail, Cable Schedule, Plant Layout, Logic Diagram etc.

 Unicating and forwarding the data of weekly progress and daily progress to the client. Attending the construction meeting, technical discussion and planning for further assignments in hand.

 Plan and Perform work scheduling, Trouble shooting, Loop Checking, Commissioning, Start-up & Function Logic Tests, perform Instrument Calibration, Conduct Field bus wiring test, Carry out skilled field installation, Diagnose Instrument malfunctioning.

 Also worked as maintenance Engineer and carried out preventive & corrective maintenance, Commissioning, Trouble shooting, Loop Checking, Function Logic Tests, Perform Instrument Calibration, Conduct Field bus wiring test, Carry out skilled field installation, Diagnose Instrument malfunctioning. And Responds to all operation priority breakdown calls as per shifting schedule. Maintenance of DCS & PLC under the supervision of Maintenance Manager.

 Also aware of Safety rules and regulations, Participating weekly safety Auditing and reporting, participated weekly safety meetings and familiar with all relevant safety induction like 100% Tie Off, Fall Protection, Confined Space Entry and Plant Mechanical Pre-commissioning safety etc.

 






popup-img