Nearly 3 years of experience in Piping Engineering.
Proficient in selection and sizing of piping, preparation of piping layout, reviewing, estimations, isometric checking, standard and specification development, tendering and vendor development
Expertise in planning, monitoring, controlling all phases of project lifecycle, administration and resource planning.
Proficiency in carrying out activities such as prepare Bill of material, checking P&ID’s, GAD’s & Isometric drawings.
Skilled in performing site management functions with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.
Core Competencies
Overseeing on-site activities viz. erection & commissioning of piping equipments, reviewing project schedule, piping pre- commissioning activities such as conducting various types of erection & alignments, welding, steam blowing, pressure testing, flushing, leak testing, degassing, dry outs, etc.; performing stage wise inspection of piping fabrication.
Inspecting field sites, observing and evaluating site conditions & feasibility for construction, availability of resources & facilities.
Monitoring the final start up and handing over procedures; ensuring continual improvement in safety measures.
Career Summary
Feb’13- Feb’15:
Chelsea Arabia Co. for Contracting, at Shaybah as Piping Engineer
Project: Shaybah IGHC Project
Client: Saudi Aramco
Contractor: Samsung Engineering
Key Result Areas:
Performing analysis of available work scope as per original contract
Leading engineering activities with other disciplines to deliver engineering documents as per schedule & ensuring compliance with the mandatory standards.
Carrying out major activities encompassing:
Preparing Bill of Material
Handling material & ensuring delivery to the site on priority basis
Conducting checks on P&ID’s, GAD’s & Isometric drawings to ensure adherence to the required specifications
Maintaining satisfactory size and schedule of pipe, rating of flanges, proper flange face & fittings as per isometric drawings.
Developing weekly & monthly look-ahead plans to achieve client target and organizing plant & site facilities
Monitoring stage wise inspection of piping fabrication & erection works with respect to approved Isometric and P&IDs
Facilitating installation of pipe supports, hangers & guides in accordance with piping drawings & pipe support details.
Highlights:
Completed the 1st Shut down of GOSP-3(Gas Oil Separation Plant) of Shaybah IGHC Project.
Dec’11- Feb’13:
Chelsea Arabia Co. for Contracting, at Manifa as Piping Engineer
Project: Manifa Core Hydrocarbon facilities Project
Client: Saudi Aramco
Contractor: Saudi Arabian Saipem Ltd
Key Result Areas:
Reinstatement activities of Process piping/Utility lines/Blow down lines/Fuel gas etc. and Structural erection.
Completely involved in all Process Piping Activites such as documentation and co-ordination activities on site of complex project.
Co-ordinating for engineering activities with the other disciplines in order to deliver engineering documents as per schedule & compliance with the mandatory standards.
Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary
ACADEMIC PROJECT
Title: DMAIC Tools Applied on Bail Tight Project
Duration: Final year Project
Description: The project focused on selecting Initial Tool for Component Search. The response is of attribute type and assembly of brake pedal was creating the problem. Involved in identifying whether the assembly process or sub-assemblies are creating the problem. The suspected source of variation in tightening of bail is:
– Assembly process of brake pedal LH and RH creating the problem
– Bail is creating the problem
– Brake pedal LH creating the problem
– Brake pedal RH creating the problem
Key Learning’s: Swapped the pedals and bails of Good Assembly and Bad Assembly in 1st Suspected Source of variation. Concluded that RH Pedal was creating the problem. Thus in RH Pedal the suspected source of variation were bush and sleeve position, bush and sleeve perpendicularity. Checked the perpendicularity from CMM Machine and successfully concluded that in bad assembly sleeve perpendicularity was creating the problem.
– In Improve phase, concluded that VMC machine was creating the problem. After few days of inspection the problem was with fixture of the VMC Machine.
– In Control phase, tabulated the rejection level in next three months the defects percentage reduced from 80% to 5%
IT Skills
Well versed with MS Office, AutoCAD, Pro-E, PDMS, CAESAR II, C & C++ and Internet Applications
Qualifications
B.E. (Mechanical) from Amruthvahini College of Engineering, Sangamner, Pune University in 2011 with 60%,
H.S.C & S.S.C from Maharashtra State with 75% & 76% respectively