Qualifications
D. C. E. (Diploma in Civil Engineering) in 1999 & From State Board of Technical Education, A. P., India
Career Summary
Technical experience in Oil & Gas, Petroleum Refinery, Petrochemical industries Civil, Structural, Architecture, Oil & Gas Pipelines, Sub-Station & Control Buildings, National Highways Bridges across the river, Elevated and under- ground Reservoirs,. Quantity estimation for Tenders of Civil & Architecture Works, Extensive experience in Quality Control the various Civil, structural and Architecture works, like studying Drawings, specifications, Work Procedures, Inspection and Test Plan etc. reinforcement, formwork, concreting, slip forming method for vertical shafts, Post tensioning and pre-casting system ( PSC ). Preparation of bar- bending schedule and quantity estimation for steel and concrete as per drawing Etc…
Present Employer : Hyundai Engineering & Construction Co., Kuwait.
Period : 03rd Feb. 2012 to till date
Position Held : QA/QC Inspector Civil (Approved by KOC)
Job Description
KOC & KNPC
Installation of LSFO, FG & Gas Oil Pipelines from MAA (KNPC) to Sabiya and Doha Power Stations (P 1 & P 2)
Inspection, Execution and Quality Controlling of all type of Civil, Structural & Architecture such as Structural Concrete Foundations, Sub-Station buildings, Control buildings, Box Culvert, Duct Banks, GO/FO Metering Shelters , Air Package Shelters, Booster Station – 180 including Steel Structure & Cladding works, Electrical & Instrumentation Building, Survey works, Right-of-Way, Under Ground facilities, Earth excavations for (Pipelines, Tie-in Joints, SVS, Drip Barrel and CMC Pits etc..) Sand Bedding, Padding, Back filling, Shuttering, Re-bar and Concrete works.
Period : 10th April 2006 to 02 Feb. 2012
Employer : Heavy Engineering Industries & Shipbuilding Co. (Formerly Kuwait Shipbuilding & Repair Yard Co. (KSRC) KUWAIT.
Designation : Civil/ Structural Construction Supervisor.
(Permit to work Authorized by KOC, KNPC & EQUATE)
Job Description
Kuwait Oil Company
(Jan. 11 to Feb. 12)
Installation of LSFO, FG & Gas Oil Pipelines from MAA to Sabiya and Doha Power Stations Pipe Dia.48” & 40” (P 1)
Executing and Controlling Survey works, Right-of-Way, Under Ground facilities, Earth excavations for (Pipelines, Tie-in Joints, SVS, Drip Barrel and CP points ), Sand Bedding, Padding, Back filling, Shuttering, Re-bar and Concrete works for SVS and Drip Barrel.
Direct handling to Client and Consultants, Management, Equipment and Manpower.
Industrial Contracts Division (ICD) OPS Unit ‘D’ Civil (Nov. 09 to Jan. 11)
Quantity estimation for Proposal Tenders of all type of Civil works, Casting of RCC Pre-Cast Foundations for KOC Projects and Preparation of Credit/Debit Note for In-House Works and Under taken Business trip to Sri Lanka and India for recruiting Civil Manpower for KOC 1 Pipeline Projects.
KNPC (K.S.C), Modernization of Obsolete Instrumentation Project (MOIP Phase – 1) at MAA Refinery
( Apr. 2009 to Oct. 2009)
Construction of Oil Movement Central Control Room (Blast Resistance), Analyzer shelter Foundation, Foundations for all type of Instruments etc.,
Olefins II Kuwait, EQUATE Petrochemical Co., Polyethylene Expansion Project
. (Jan 2007 to Mar 2009)
Construction of New pellet heavy foundations and structure, Heavy Silo’s foundation, Pipe rack foundations, Heavy Compressor foundation, Sub-station buildings, Ramp with retaining wall, Spare cycle gas cooler foundation, re-routing of 20” fire water line and new pellet storage area, etc.
Kuwait Oil Company
( April 2006 to Jan 2007 )
In Gathering centre-27 capacity expansion project for effluent water separation & transfer and new desalter and light crude modification, construction of chemical storage & chemical injection shelters, pipe rack foundations and sleepers, TV flare foundations etc.,
Worked as supervising and executing of all civil works, like shuttering, reinforcement, concrete ,earthworks, cast-in-situ & pre-cast foundations and structure installation system etc.,
Period : Feb. 2004 to March 2006
Employer : Ministry of Energy (Electricity and Water) Water
Project Department (On Contract) Kuwait.
Designation : Site Engineer Civil
Job Description
Construction of conical shaped reinforced concrete Pre-stressed water tower 10 nos. (Each 0.66 MIG Capacity)
2.75 MIG Reinforced Ground Reservoir.
Electrical and Control Building, Pumping Stations, Guard House, Asphalt Road, Etc. at South Jahra and Doha Residential areas.
Worked as Inspection & Quality Control of all civil & Architecture works, Studying Specifications, Drawing, Reinforcement, and formworks, Concrete, Slip Form Method for Vertical shafts, Post Tensioning and Pre-casting system.
Period : November 2003 to January 2004
Employer : Nagarjuna Construction Co. Ltd. Mumbai, India
Designation : Junior Engineer
Job Description
Construction of J.V.L.R. Flyover Bridge, 30 meters by 12 Spans, file foundations, structure P.S.C. (I) Girder (Post Tension).
Worked as Junior Engineer checking of Reinforcement, Concrete, Shuttering, Preparation of Bar bending schedule and Estimation for steel and concrete as per drawings.
Period : August 1999 to July 2003
Employer : Prasad & Co. (Project Works) Ltd., A.P. India
Designation : QA/QC & Civil Construction Engineer
Job Description
Construction of Major Bridge (km 61/1) 31 Mts. By 5 Spans, 4/6 Lane, NH-5 A.P., Package-5, India, Well Foundation, Structure: P.S.C.( I ) Girder Post Tension. Client and Engineers: NHAI, Sheladia (USA) & RITES
Construction of Major Bridge ( km 81/2) 20 Mtr. by 4 Spans, 4/6 Lane NH-5, A. P., Package-5, India, Open Foundation, Structure: Voided Slab, Client and Engineers NHAI Sheladia (USA) & RITES
Construction of High level Bridge (Across Thapi River) 40.0 Mtr. By 12 Spans, Jalagon Dist., Maharashtra, Well Foundations, Structure: P.S.C. ‘ I ‘ Section Girder (Post Tension and Pre-casting) Client & Engineers: Maharashtra Irrigation Development Corp..
Construction of Sub-mercible Bridge ( Across Purna River ) 48.5 Mts. by 6 Spans, Jalagon Dist., Maharashtra, Well Foundations, Structure: P.S.C. Box Girder ( Post Tension ). Client and Engineers, Maharashtra Irrigation Development Corporation.
Worked as Inspecting all type of Civil Works, Quality Control, Carryout Laboratory test on Materials following specifications, Inspection and Test Plan (ITP) like Earth works, studying drawings, reinforcement, Formworks, concrete, post tensioning and pre-casting system, as per drawing.
Total Experience : 15 years Experience in the Field as QA/QC Inspector, Civil Engineer & Supervisor.