CV, Indonesia based Welding/Piping Engineer

Available
Serial No: 16754
Skills keywords: 
Current location:  Indonesia - View on map
Nationality: Filipino
Spoken languages: english

Qualifications

AWS CERTIFIED WELDING INSPECTOR
AWS(CWI) CERT:14063391

MECHANICAL ENGINEERING LICENSURE EXAMINATION
MECHNICAL ENGINEER
PRC Board Rating 74.5%. Manila – November 1999

Career Summary

FIELD PIPING ENGINEER
BRUNEL, BATAM, INDONESIA
APLNG MODULE YARD PROJECT.
BECHETEL INTERNATIONAL INC.

Conocophilips Project

November 21,2013 to present

Duties and responsibilities;

 Monitors health, safety and environmental requirements are implemented at site all time.

 Development, implementation and review of asset process safety program for all areas in coordinate to the production manager and asset maintenance reliability manager and other discipline.

 Monitor and development implementation and ongoing review pipeline components integrity to the base line survey for the reference in RBI inspection program.

 Development implementation of project requirements, ongoing review of piping integrity, maintenance reliability for the future risk base inspection program.

 Responsible for everyday progress, activities and monitoring the scope of work at site to make it sure that works assignments are completed base on the project completion date.

 Responsible for workforce arrangements and deployments for designated area of site personnel.

 Responsible for the operation of technical engineering support for the base line survey program as dictated by the project requirements.

 Responsible for TML progress in daily basis and coordinate to the client.

 Inputting of all the data in the Bechtel system(teamwork) and review before submitting to client .

QA/QC WELDING INSPECTOR/PIPING INSPECTOR
MONADELPHOUS ( PNG) LIMITED
SOUTHERN ISLAND KUTUBU PNG CPF, PAPAU NEW GUINEA,
OIL SEARCH PROJECT

January 27,2012-June 30 2013

Duties and Responsibilites:

 Monitors health, safety and environmental requirements are implemented at site all time.

 Monitor as per Inspection test plan (ITP) Monitor from upstream to downstream ,shutdown monitoring and involving plant upgrading supervise and monitor before, during, after welding to ensure the sequencing of weld bead as per code and WPS temper bead technique if required and ensure the heat input is comply at hot topping point .and to ensure all NDT activities are completed before conduct hydro testing.

 Directly reporting to site manager ,working for QA/QC department daily report and updated all welding activities.

 To determine and documents any areas that may need improvement. review ITP WPS PQR Line checking and punch items and close all punch item preparation for testing and pre commissioning activities.

 Inspecting and sampling the entire fabrication process is another part of quality assurance job description.

 To review the current policies and improvise plans to improve upon the existing quality standards.

 To review and analyze the effectiveness of the modifications made such as built drawing make sure approved by engineering department prior to use in fabrication and site.

 To ensure that all procedures within the company approved and updated and all reports are on record,

 Daily monitor consumable storage and worksite for preventing the potential of hydrogen cracking

 Suvervise structural mechanical piping activities and making sure to comply with the project procedure. Primarily involved in the inspection and monitoring of piping take off and welding in progress to the construction of gas plant project in accordance with the applicable code, project procedure such as oil seach limited ASME IX ,API 620/650 API 1104, ASME B31.3 ASME VIII div.1, ASME B31.1, AWS D1.1.Australian standard AS 1210,AS 1554,AS 2885.

Responsible for checking the up dated and ensure the drawing on site.

 Responsible for the line checking of completed line as per working packages and prepares report of punch items outstanding, weld mapping of all joint; tacking of materials specially monitoring of all treaciable materials; reviews the MTR against actual condition of the material size, visual appearance and type.

 Carry out inspection and making sure that the project specification and codes are properly implemented.

 Monitors and Check WPS making sure that these are used correctly for base material class and checks that the welders are qualified to the WPS are being used and make all daily welding reports.

 Monitors all nondestructive testing such as MT, PT, UT, RT, HARDNESS, PMI, PWHT are conformed to the project requirements; control final documents.

 Responsible for the inspection and monitoring of welding consumables, receiving and issuing (Electrode, bare wire) baking of Low Hydrogen Electrode are properly implemented at the project procedure to avoid HICC problem.

 Responsible for the inspection of materials receiving and issuing for site welding and erection.

WELDING FIELD ENGINEER/PIPING ENGINEER
BECHTEL INTERNATIONAL, INC.
Angola LNG Project, Soyo, Zaire, Republic of Angola

April 10, 2010 – April 01, 2011

CHEVRON PROJECT

Duties and Responsibilities:

 Monitors health, safety and environmental requirements are implemented at site all time.

 Assists site management in attending the client’s job related queries.

 Responsible for the coordination, meeting with clients as QA/AC representative and client correspondence.

 Responsible for the material receiving on site which is based on isometric drawing. Final documentation control.

 Responsible in reviewing and fully implementing the project procedure and making sure that the works are completed on time.

 Reading and complete understanding of Plans, Isometric Drawings and P&ID’s; preparation of welding procedure specification when needed.

 Checks and monitors Welding Procedure Specification (WPS) & Procedure Qualification Record (PQR) and serves as witness of Welder Qualification Test (WQT) according to ASME IX.

 Responsible for the inspection and monitoring of welding consumables, receiving and issuing (Electrode, bare wire) baking of Low Hydrogen Electrode are properly implemented at the project procedure to avoid HICC problem.

 Monitors welder’s performance and welding activities to ensure the work is being carried out in accordance with the approved welding procedure.

 Responsible for the spool marking, welds markings, inspection of Piping material CS, LTCS SS, Seamless and welded pipe, duplex stainless steel. Ensures the Specifications and Heat Number during the cutting of pipe are being transferred.

 Responsible for the inspection of Pre-welding and Post-welding heat treatment. Visual inspection of welding Carbon Steel, Low Alloy Steel and Stainless Steel.

 Checks and verifies all the parameters during welding and supervises Pipe Fabrication, Welding and Erection.

 Monitors all NDT (PT, MT, RT and UT if required), prepared piping and steam tracing punch list pre-test and post-test. Verifies punch list after rectification.

Tanks / Vessels

 Inspects tanks fabrication and erection such as cone type, heavy slope, hemi spheroid, spherical and floating roof tanks as per API 650 and API 620.

 Checks and monitors the correct attachment and orientation of nozzle into pressure vessel as per drawing, specification and applicable code ASME Section V111 div 1.

 Supervises the fabrication, welding, inspection and hydro-test of LPG storage tank. Ensure the specification and heat number during cutting of the plates are transferred.

 Responsible for the inspection of shell plate’s erection vertical and horizontal joints, nozzles, stairs and plate form. Responsible for the inspection of Pre- and Post-welding and preparations of weld maps (Bottom, Shell and Roof).

 Responsible for the visual inspection of plates before and after rolling; visual inspection of welding; monitors all NDT (MT, PT, RT and UT) according to API 650/620, Pneumatic Leak Test (PLT) of reinforcement pads.

 Responsible for the peaking and banding inspection of welds and plumpness of tank according to API 620/650 and project specifications and for the preparing of the QA/QC format and reports.

 Preparation of punch list pre-test and post-test and responsible for the inspection of sand blasting and painting. Verification of punch list after rectification.

QC INSPECTOR – WELDING/PIPING INSPECTOR
EASTERN BECHTEL CO. LTD.
Asab Gas Development Phase II (Asab 2) Project, Asab, Abu Dhabi, U.A.E.

November 17, 2008 – February 15, 2010

GASCO PROJECT

Duties and Responsibilites:

 Monitors health, safety and environmental requirements are implemented at site all time.

 Qualifies specification of the work project procedure done by the subcontractor. Primarily involved in the inspection and monitoring of piping and welding in progress to the construction of gas plant project in accordance with the applicable code project procedure such as ASME IX ,API 620/650, ASME B31.3 ASME VIII div.1, ASME B31.1, AWS D1.1. Monitor as per Inspection test plan (ITP) Monitor from upstream to downstream ,shutdown monitoring and check the qualification of welder and wps involving plant upgrading supervise and monitor before, during, after welding to ensure the sequencing of weld bead, checking root before closed ,NDT after hot passed for verification as per project specification, code and WPS temper bead technique if required and ensure the heat input is comply at hot topping point .and to ensure all NDT activities are completed before conduct hydro testing.

 Responsible for the line checking of completed line as per test packages and prepares report of punch items outstanding, weld mapping of all joint; tacking of materials specially monitoring of all treaciable materials; reviews the MTR against actual condition of the material size, visual appearance and type.

 Carry out inspection and making sure that the project specification and codes are properly implemented by the subcontractor.

 Monitors and surveillance WPS making sure that these are used correctly for base material class and checks that the welders are qualified to the WPS are being used and signs all daily welding reports.

 Monitors all nondestructive testing such as MT, PT, UT, RT, HARDNESS, PMI, PWHT are conformed to the project requirements; signing of all inspection test plan for test packages approval and final review and signing of all dossier for mechanical completion as per project requirement control final documents.

QC INSPECTOR – WELDING/PIPING ENGINEER
CONSOLIDATED CONTRACTORS COMPANY W.L.L.
Khursaniyah Gas Plant Project, K.S.A.
August 29, 2007 – August 30, 2008

SAUDI ARAMCO PROJECT

Duties and Responsibilities:

 Carry out inspection in accordance to Saudi Aramco Engineering standards (SAES), quality control procedure (QCP), inspection test plan (ITP) and also well-verse in different codes such as ASME CODE, AWS, API.

 Primarily involved in the inspection and monitoring of piping and welding in progress construction of gas plant project in accordance in applicable code such as ASME B31.3, ASME VIII div.1 and AWS D1.1.

 Responsible in the line checking of completed line as per test packages and prepares report of punch items outstanding, weld mapping of all joint. For instance, during surveillance, I am responsible for the checking and approval of WPS and verifies all certificates or identification card of the welders who are qualified in the WPS.

 Makes sure that all requirements in the WPS are smoothly implemented. Checks the drawing for the correct dimensions in the actual spool that are being erected. Checks the fit-up to comform to project specification and strictly monitors all NDT testing at site and in fabrication shop. Checks and monitors repairs if welders are qualified and the WPS is approved. Lastly, prepares all report for record and control final documents.

WELDING INSPECTOR
FUGRO-SUHAIMI LTD.
Dammam, K.S.A

July 11, 2003 – May 22, 2007

Duties and Responsibilites:

 Acts as a third party inspection of welding fabrication and dimensions of piping, pressure vessel, low pressure tank are based on specifications and drawing requirements.

 Monitors and acts as a witness to hydro- testing. Acts as a witness to welder qualification test; prepares Welding Procedure Specification (WPS) for client requirement; conducts site investigation and also carry out non- destructive testing such as UT, RT, PT and MT as per job contact, codes and specifications are carried out.

 Extensive ultrasonic inspection of different weld joint, cladding inspection, forging, plate lamination and thickness gauging. Conducts Radiographic inspection to different pipe and vessel testing using Ir. 192 , x-ray and film interpretation for magnetic particle testing using yoke and prod and penetrant testing using water washable and solvent removable process.

 Conducts holiday testing on storage tank as per film thickness on procedure requirement, stringing, trace-ability and bending inspection.

 Monitors procedure and welder qualification. Responsible for the inspection of Pre-welding and Post-welding and visual inspection of welding.

 Executes all NDT according to Code (API 1104), ASME B31.1, AMSE B31.3, AWS D1.1, and ASME VIII div.1. Responsible in the Coat Wrapping inspection with Holiday Detector.

 Inspection of Grit-blasting and Heat Shrink Sleeve on welded joints, Peal Test of Sleeve, Trenching, Holiday Test, Lowering and Backfilling according to client’s specifications and prepares weld map.

 Inspection of Hydro testing and leak testing. In-charge in preparing reports, documentation and packaging. Collates all reports and document for final inspection.

VISUAL INSPECTOR
NATIONAL PIPE CO., LTD.
SUMITOMO HEAVY INDUSTRY, Al Khobar, K.S.A.

April 20, 2001 – April 18, 2002

Duties and Responsibilities:

 Performs visual and dimensional inspection of the correct weld size, weld appearance of pipe, base metal, ovality and the required bevel angle, squareness, straightness of pipe in conformity to the code and drawing requirements. Calibrates measuring instruments, equipments and other activities affecting the quality of a product; establishes judgment standard for visual and dimensional inspection. In-charge in preparing reports and available for record.

 Carry out NON-DESTRACTIVE TESTING such as Magnetic Particle testing (MT), Penetrant testing (PT), Ultrasonic testing (UT).

AUTO ELECTRICIAN
NISSAN WORLD CARS, INC., Cabanatuan City, Nueva Ecija, Philippines

June 1992 – October 1995

Duties and Responsibilities:

 Assigned to engine overhauling during disassemble apply inspection some parts to ensure no damage and assemble ensure bolt torque apply are correct as per company requirements rewiring electrical harness of cars, trucks checking all switches are properly functioning and installs air conditioning to all types of vehicles including fabrication of tubes, fittings and repair starter motor, alternator (IC Regulator to conventional regulator)and wiper motor, engine tune –up expert in trouble shooting.

 

 