Academic Qualification
Sep 08 – June 12 B.Sc. Degree in building and construction department– structural Branch
University Of Technology, Iraq- Baghdad
Graduation Project: Design of multi-story building by ETABS for analysis and design of railways Institute of the Ministry of Transport and communications
Certificates:
Certificate of Participation: TOEFL certificate by the Ajman University of Science and Technology – United Arab Emirates Score 510 (ITP) in year 2008.
Certificate of Participation : in the Institute of Mustansiriya of computers in a good degree of AutoCAD certified by the Ministry of Education in Iraq and the Ministry of Foreign Affairs.
Experience Certificate : Certificate of experience as a civil engineer in a distinct work by victorious in Basra from ALDAHFER CO.
Certificate of work : certificate of work from (PEW) Power Engineering World co. sub contract with ( Hyundai Engineering company) in Basra .
Certificate of creativity : certificate of creativity from GRANADA GROUP in IRAQ-NASRYIA Thi QAR university project.
Software Skills:
Microsoft Windows (7) operating systems, Microsoft office2010 (Word, PowerPoint, Excel,). Auto Cad – ETABS
Survey skills:
I have the ability to use level, Theodolite, also I can check the Coordinates of plans by AutoCad
RELEVANT EXPERIENCES:
Trained for 4 years during the study phase in the summer vacation of each year in locations engineering are many, including the Department of mattresses military of the Iraqi Ministry of Defense and the Department of Insurance of Iraq, which owns buildings in the province of Mosul, where you go to the supervision of the engineers with experience in my field to follow the evolution of pregnancy.
Experiences:
1 JULY 2012 – 15 March 2013
I worked as site civil engineer with ALDahfer Engineering co. and Alufuk Turkish co. prime contractors with Hyundai Engineering Company to build up ( Rumaila Gas Turbines Power Plant) with five turbines each one 295Mw.
The site was located in Basra, in south of IRAQ in the Rumaila oil field.
At the beginning of the work was to give a course on occupational safety for all the work of engineers and workers.
Buildings at the station:
• 400 KV GIS BUILDING.
• 132 KV GIS BUILDING.
• 11 KV GIS BUILDING.
• C.C.B – CENTRAL CONTROL BUILDING.
• BACHELOR HOUSE BUILDING.
• ADMINISTRATION BUILDING.
• CANTEEN BUILDING.
• WORKSHOP BUILDING.
• FIRE FIGHTING PUMP HOUSE BUILDING.
• FIRE FIGHTING BUILDING.
• AIR COMPRESSOR BUILDING.
• GAS TURBINE BUILDING.
• PERMANENT SOTRE BUILDING.
• TEMPORARY STORE BUILDING.
• WATER TREATMENT BUILDING.
• MAIN GATE HOUSE BUILDING.
• SECONDARY GATE HOUSE BUILDING.
• LOCAL ELECTRICAL BUILDING.
• CHEMICAL STORAGE TANK SHELTER.
• SEWAGE STORAGE TANK SHELTER.
• GUARD TOWERS.
• CABLE CULVERT.
• CABLE TRENCH.
• PIPING
I have worked on the project since the beginning, where my work start with :
Excavation works after surveying works with surveyors, compacting soil, formwork of
Blinding , Casting concrete, Bitumen coating , Casting screed, Rebar works of
Foundations , Casting concrete, Columns formwork and rebar works, slabs formwork
and rebar works, after the completion of the construction work of structures the
brick works start with plastering walls of partitions In agreement with the engineers
of Mechanics and Electrical , Where sanitary engineer to complete its own works.
Where work on an ongoing basis with all engineers in project until reaching the
finishing works until the delivery of the project to the beneficiary.
My responsibilities at the station:
I was working as an engineer at the plant site for many of the buildings and the work was distributed on us by the site manager , Where the work was initially in the form of a group of engineers to receive the Civil Works.
My job was to give details of the work rebar and carpentry for several buildings such as: Administration building, canteen building, C.C.B building , cable culvert, cable trench, water treatment.
1 April 2013 – 1 October 2014
I worked as Project Manager in IRAQ- NASRYIA THI QAR with Turkish Company ALUFUK INSAAT that contracting with GRANADA GROUP . To build up
(University of Thi Qar).
The project is a twelve buildings, each building consists of two floors, including the university administration , scientific departments for students and theater for theatrical performances , Where the project was handed over to the government within a high specification because the workers were Turkish citizenship because their high accuracy in implementation, especially in the works of finishing.
27october2014 – until now
I am now working as civil engineer with IRAQ GATES company for oil services, In the province of Nasiriyah in Garraf oil field and the contract with the Malaysian company Petronas. My responsibilities ( pipe sleeper, pipe rack, Hp fuel gas compressor, water tanks).