CV, Maintenance Engineer Seeking Work Globally

Available
Serial No: 48393
Skills keywords: mechanical maintenance engineer, production engineer, site engineer
Current location:  Abu Dhabi, United Arab Emirates - View on map
Nationality: Indian
Spoken languages: english

EDUCATION

PG Diploma in Oil and Gas Piping Designing

March 2013
ASTS, Kochi, Kerala, India

Bachelor of Mechanical Engineering
August 2012
Karunya university, Coimbatore, Tamil Nadu, India

 

EMPLOYMENT HISTORY

April 2014 – Current
Plant Engineer – Oil Based Mud Cuttings Treatment Plant
Emdad LLC (Abu Dhabi, UAE)

Working at Thermal Desorption Unit on ADCO project in Habshan. Performing the duties of operation, production and maintenance of the plant. Experiencing OBM quality control analysis and documentation along with the productivity of the project.

Duties and Responsibilities

Perform the various lab procedures to ensure the quality of product water and treated water.

Attending all process safety reviews as necessary and making sure that all agreed recommendations are adhered to.

Participating in incident investigations.

Preparing plant layout, equipment list, and capital cost estimate and operating cost estimate.

Achieve the production targets in a view of quality and cost.

Performing various laboratory tests like Retort Kit, TPH, TDS, ORP, SDI and PH etc.

Supervision any breakdown of plant.

Plant data collection and summary of production calculations.

Communication with Manager regarding of all departments of Plant in the shift.

Monitoring the plant behavior.

Design and plan layout of equipment for installation of new plants and also modification of the existing plant.

Maintaining all documents.

Maintains all operational record.

Shutdown and startup Procedure of the plant.

Working with team to resolve the problem of running plant.

May 2012-May 2013
Site Engineer – Ship Building & Repair Department
Cochin Shipyard Ltd (Jacob’s Marine) (Kerala, India)

Reading the production drawings and inspecting accordingly.

Welding inspection.

Painting of prefabricated panels and piping spools.

Maintaining a record of daily inspection reports and documentation.

Ensure safe environmental practices.

Monitoring progress throughout the construction process and comparing this with the projected schedule of work.

Interacting with Yard personnel to solve site problems.

Inspection of hull.

 

FINAL YEAR PROJECT

Hybrid Two Wheeler:  Frame Model Designing and implementation of a Hybrid Two Wheeler Frame Model .which combine an Internal combustion engine and electric motor.






popup-img