Qualifications & Education
• Federal University of Technology, Akure (FUTA) Ondo State.
B.Eng in Agricultural Engineering (Second Class, Upper Division)……………………… [2009]
• Federal Government College Ogbomoso, Oyo State.
Senior Secondary School Certificate Examination (SSCE)………………………………. [2002]
• Bols International Nursery and Primary School Ipaja, Lagos State.
First School Leaving Certificate or Testimonial ………………….………………………. [1996]
Career Summary
• A & P Foods Limited (HAANSBRO)
Mechanical Engineer (Confectionery)
2013 To Date
-Supervision & Operation of Industrial Machines (Automated Wrapping & Cutting line machines)
-Supervision of production line.
-Ensuring workplace safety and appropriate PPE’s are used in production line operations.
-Repair and maintenance of all mechanical faults in machines
• Bren Williams Nigeria Limited
Project Engineer (Mechanical
)2012-2013
-Design, fabrication and welding of vessels and structures.
-Installation of industrial machines.
-Ensuring all works & materials are in accordance with QA/QC program and project specification
-Inspection and verification of mechanical fittings and materials.
-Supervision of mechanical fabrication and welding of pipes.
-Installation of pressure valves and centrifugal pumps.
-Interpretation of Piping and Instrumentation diagrams (P & ID).
-Supervision of projects work on site
• Arcnet Technologies Limited
Assistant Design Engineer
2011-2012
-Drafting and Interpretation of Mechanical Drawings
• N.Y.S.C Programme 2011
-Discharge Certificate
• Wayne West Africa Limited
Trainee Maintenance Engineer
2010-2011
-Repair of electric motors
-Repair and maintenance of pumps (dispensers) & diesel engines
PROJECT WORK
• Project Engineer responsible for the installation of Gas Plant at Sil Chemical Limited ………[2013]
• Fabrication & Installation of Silos for the production of detergents at Eko Supreme Nigeria Limited
• Project Engineer responsible for the installation of stainless pipes from the Azo raw material plant to the Savoury factory at Unilever Nigeria Plc.…….….…………………………………..….…..[2012-2013]
• Installation of Boiler Plant at PZ Wilmar Nigeria Limited.……..…………….….….…….[2012-2013]
• Installation of pipes on pipe bridge at PZ Wilmar Nigeria Limited…………………..,…….[2012-2013]
• Fabrication and welding of the piping from the pump house to the tank farm at PZ Wilmar Nigeria Limited….…………………………………………………………………………….…….[2011-2013]
• Physical, Chemical and Engineering properties of termite mound soils relevant to the design of soil engaging equipments ………………………….…………………………………….…..…. [2009]
• Design and Fabrication of a centrifugal separator ……….….…………………….…………[2007]