WORK EXPERIENCE
12th Nov 2014 – Till Date DBB / BK Gulf Package Manager ELVSystems Dubai, UAE
JOB DESCRIPTION:
- Design Verification of ELV System drawings & Specifications given by the client for the study of construction process, Preparing the RFI’s for technical clarifications in the drawings & Specification
- Sending enquiry & Contacting the Specialist to get the quotations with compliance for the specification and drawings, finalizing the specialist for the systems
- Submitting the Material Submittal, Method Statement & Shop Drawings for approval of consultant / government authorities like Civil Defense, Dubai Police, Du, Etisalat, Nedaa
- Coordinating the Interface / Integration of system with Existing Dubai Mall & Burj Khalifa systems
- Coordinating the connections to the Government authorities Civil Defense, Dubai Police, Du, Etisalat, Nedaa
- Coordinating engineering activities with other systems
- Installation of system as per the Project program, Verify and enforce the correct sequencing of Installation activities
- Providing required documents to commercial team for the billing
- Advising commercial team for the design change & variation
PROJECTS HANDLED:
- The Dubai Mall Fashion Avenue Expansion
- Burj Khalifa At The Top Reception & Tunnel
- Burj Khalifa Annexure Building
- The Dubai Mall Fashion Avenue Car Park
15th Oct 2013 – 10th Nov 2014 Insec Solutions Asst. ProjectManager Chennai, India
JOB DESCRIPTION:
- Coordinate engineering activities for various safety & Security systems
- Ensure efficient coordination of services is done with other building components
- Conduct regular Project meetings with site staff to review, control, assess the progress of all activities
- Maintain adequate levels of material and manpower required for Project activities.
- Report on progress to Management with parallel reporting to Client
- Facilitate Project activities between site engineers, subcontractors, and stores
- Liaise with the Client and Consultant coordinator for activity Clearances
- Ensure accurate communicate between teams for technical processes and tasks
- Enforce the adherence to safety plan by site employees and stores
- Verify and enforce the correct sequencing of Installation activities
- Carry out regular quality assurance practices in coordination and planning tasks
- Check the relevance and accuracy of documentation during inter‑ disciplinary coordination
- Resolve construction-related problems swiftly and appropriately
- Maintain Project activities strictly in line with the projects requirements.
09th Oct 2008 – 12th Oct 2013 ETA Star MEP division Sr. Engineer ELVSystems Doha, Qatar
JOB DESCRIPTION:
- Verification of Architectural, Structural & ELV System drawings given by the client for the study of construction process
- Preparing the RFI’s for technical clarifications in the drawings
- Preparing the shop drawings register as per the architectural plans, single line diagrams, schematic diagrams
- Preparing the drawings submission program as per the construction program
- Studying the material submittals and comparing the specifications for the design of the system
- Conducting meetings with Client/Consultant/Distributor to understand the requirements, work on the building layout detail drawings for ELV systems & developing Schematics & Detail layout drawings
- Submitting RFI’s to consultant for the change in the consultant drawings
- Verifying the drawings for complying the standards of government authorities approval
- Design/assist in implementation of systems with reference to the IFC drawings
- Preparing the shop drawings area / floor wise as per the design
- Provide Architectural, structural, ID and MEP coordination; for all trunk routes, conduit & electrical requirements
- Perform site/system inspection requests for all ELV systems for subject approvals
- Preparing the schematic drawings and single line diagrams with respect to the shop drawings
- Submitting drawings for the approval of the consultant / government authorities
- Liaise with the Client and Consultant coordinator for activity Clearances
- Coordinate engineering activities for various ELV systems
- Installation of system as per the instructions of the system manufacturer
- Verify and enforce the correct sequencing of Installation activities
- Resolve construction-related problems swiftly and appropriately
- Maintain Project activities strictly in line with the projects requirements
- A team Member for getting local authorities approval like Civil Defense Department, Qatar Cool, WOQOD & Municipality for the ELV works
- Testing & Commissioning the installed systems as per the design requirements
- Handing over the commissioned systems to the consultant / client approval
- Preparing the markup drawings by visiting the site for the changes in the shop drawings
- Preparing the as-built drawings with reference to the markup shop drawings with site changes
- Preparing the Operations and maintenance manual
- Finding the changes and submitting for the variation claim
- Submitting drawings & Operations and maintenance manual for the approval of the consultant / Client
- Done As-Built drawings, Operations and maintenance manual
- Preparing the documents for Closed Out And Handing Over the Project
- Giving training to the client and maintenance team
PROJECTS HANDLED:
- Qatar Navigation Tower (B+G+50+2Tech) & Car Park (B+G+5) (QAR 230 mn)
- Jaidha Commercial Development ( 3B+G+M+7) (QAR 270 mn)
- Barwa Commercial Avenue (72 Blocks+11 Towers) (QAR 620 mn)
- Doha Convention Center & Exhibition Hall (2B+G+3) (QAR 530 mn)
- Msheireb Downtown Doha (3B+15 Towers G+ Service Corridor) ( QAR 750 mn)
- Lusail Multipurpose Hall (Stadium) Project (2B+G+7) (QAR 470 mn)
1st Dec 2005 – 20th Aug 2008 Siemens Building Technologies Project Engineer – IBMS Chennai, India
JOB DESCRIPTION:
- Studying the Design drawing for understanding the project
- Studying the material submittals and comparing the specifications for the design of the system
- Preparing the shop drawings area / floor wise as per the design
- Provide Architectural, structural, Interior Design and coordination for all trunk routes, conduit & electrical requirements
- Preparing the schematic drawings and single line diagrams with respect to the shop drawings
- Installation of system as per the instructions of the system manufacturer
- Supervise and monitor the site labor force and the work of subcontractors
- To oversee the efficiency of site activities to meet the agreed program time-frame
- Perform site/system inspection requests for installation approval from consultant
- Solving the immediate problems and giving solutions to the client requirements
- Installation of IBMS Room and Fire Command Centre
- Commissioning of systems as per the client requirements
- Preparing the As-Built drawings, Operations and maintenance manual
- Preparing the documents for Closed Out And Handing Over the Project
- Clearing Snag list & Final inspections and Approvals for project handover
- Submitting As-Built Drawings & Operations and maintenance manual for Consultant / Client approval
PROJECTSHANDLED:
- Cognizant Technology Solutions ( 4 Sites)
- Citi Bank ( 3 Sites)
- ABN Amro Bank (6 Sites)
- Intelenet Global Services
- Khivraj Tech Park
- Branch office – Chennai
02nd Feb 2005 – 30th Nov 2005 SGC Systems Ltd Junior Programmer Kanchipuram, India
- Worked as a team member for the projects in Visual Basic.
- Making forms and windows as per the requirement of the project.
- Collecting the required details about the project.
- Testing the project.
1st Jul 2004 – 10th Jan 2005 Radha Krishna Hospitality Service Trainee Payroll Processing Chennai, India
- Processing the salary and sending pay slips to the employees working in RKHS.
- Giving attendance and Processing the advance and allowances to the offshore employees.
- Giving full and final settlement to the resigning employees.
- Taken care of PF, ESI, insurance and mediclaim for the employees.
INDIVIDUAL QUALITIES
- Worked as the project in charge for handing over the project
- Having good behavior to work with team
- Very perfect in saving the natural resources and not wasting the Manpower, Materials and Money
- Punctual and disciplined
- Hardworking, Target based work and very much particular in achieving it.
- Efficient in Project Management, Team Management, handling Vendors, Subcontractors, Suppliers & Labors