CV, Pakistan Based Lead EHS Engineer, Manager

Available
Serial No: 17908
Skills keywords: 
Current location:  Pakistan - View on map
Nationality: Pakistani
Spoken languages: english, Hindi, punjabi, Urdu

Qualifications

EHS 2009 Robert Gordon University UK
 M.Sc in Oil and Gas Engineering [Ist Division]

2007 Manchester College of Professional Studies UK
 Post Graduate Diploma in Business Management [Ist Division]

2000–04 University of Engineering & Technology Lahore, Pakistan
 B.Sc Chemical Engineering [Ist Division]

2013 IGC UK
 NEBOSH

2012 UK
 OHSHAS
 Level II Emergency First Aid Training at workplace UK

Career Summary

Well versed ISO 9001, 14001 or 18001 standards with field experience in EHS, planning & QAQC; i have managed & supervised various Energy Sector projects through which I developed a confident, structured, planned approach to meeting project EHS objectives & deadlines. I have also conducted training sessions for supervisors and technicians.

LEAD EHS
AEPL-GE International,Inc Pakistan
(2012 to till date)

Working as Corporate EHS Manager responsible for the design, implementation, communication and coordination of all environmental, health, and safety programs for the company. This position will develop and provide technical and administrative direction on all EHS decisions, which bear critical importance to overall company objectives, operations, and profitability. Following are detailed responsibilities including:-

Waste management and disposal to meet GE compliance and the local regulations

Responsible for the design, implementation and control of site EHS objective, policies and guidelines.

Implementation of GE One GE Safety Outage plan especially designed for critical activities during outage

Ensure that all applicable EHS procedures, policies and plans and implemented and followed at all levels.

Oversee the site safety policy and ensure that all of the safety events, violations and environmental impacts are recorded and addressed in accordance to the respective policies.

Prepare and manage risk assesments, JSA, lift plans, permits and hazard hunts

Coordinate with client and management to achieve desired safety srandars

Planning and conducting site inspection, audits and surveys

Conduct site walkdowns, preparea & submit reports to client on daily, weekly and monthly basis.

Implement ISO 14001, 18001, 9001.

Investigation of accident, incidence, near miss and LTA and suggest remedial measures to avoid its reoccurrence.

Conduct and supervise EHS trainings.

Lead emergency response team.

And;

Prepare, manage and supervise all documentations related to Project pre-mobilization phase and Project mobilization phase activities such as initial site inspection, emergency contacts, equipment specific LOTO (lockout tagout) procedures, EHS orientation for employees and contractors, job safety analysis & risk assessments, safety meetings, hours tracking, LOTO clearance forms, weekly inspections, daily toolbox talks, reporting of accident/incident, injury, spill or other EHS event; safety correction action, Equipment inspections (annual crane inspection, daily crane inspection, overhead crane daily inspection, overhead crane monthly inspection, aerial platform inspection, come-along and chain-fall monthly inspection, fall protection equipment monthly inspection, daily forklift inspections, monthly rigging inspection); lift permits, hot work permits, confined space permits, audits and regulatory inspections.

Project de-mobilization phase activities such as final site & TNP (tools & plants) inspections, housekeeping, commissioning, start up, performance testing and site handing over to customer. Daily, weekly and monthly walkdowns, reporting & monitoring.

EHS Projects Completed

Following are some important projects where I performed duties as EHS lead & peoject lead as well with GE. Apart from office working on all company related multi projects locally & internationally following are some completed projects list;

1. Uch power major Inspection 2012

2. Sapphire Major inspection 2013

3. Saif power major inspection 2013

4. Bhikki Major Inspection Package 5 Up-gradation 2013

5. Halmore forced major inspection 2013

6. Uch power Combustion inspection 2013

7. HGPI + Package 4 upgradation Balloki- 2013

8. HGPI + Package 4 upgradation SAIF-Dec- 2013

9. HGPI + Package 5 upgradation Sapphire feb-2014

10. Guddu power major Inspection March-2014

11. Dakhni gas field major inspection Aug-2014

12. Uch power Combustion Inspection+Forced Outage Oct-2014..

EHS
ENGINEER
April 2010–March 2012 AEPL-GE International,Inc Pakistan

HSE management on construction & installation of 747 MW Guddu Power Plant

HSE management on construction & installation of 60 MW Kalerkahar Power Plant

April 2010 March 12 Value of project US $ 590 million.

Project consist of 2 9FA GE gas turbine+ 1 steam turbine + 2 HRSG

Piping works, civil construction

Pre-cast beam production and erection at site

Three station building with structural steel framing

Electrical/Power/Traction system works Electro-mechanical works

HSE Management role, rigging study of heavy equipments..

Preparation of HSE Plan in compliance with EHS regulations

Carry out audit/inspection of all sub-contractors regularly

Training of personnel, Carry out accident investigations

Preparation/Review of Risk Assessments and Method Statements

TECHNICAL ENGINEER
SPEC USA, Pakistan
March 2004 – Sep 2006

Prepare technical proposal and planning of all operations related to fabrication & purchase.

 

 

 






popup-img