Oil and Gas – EPC for more than 12 consecutive years, preparatory, installation job, supervisory job, site inspection, hand-over to work acceptance, dealing with Sub-contractor, job assessment, priority, finishing to commissioning. From the mobilization stages completion stage, close-outs, punchlist, mechanical completion, Energize related Substations, Buildings. Conversant on codes ACI ASTM, UNIFORM BUILDING Code, ARAMCO, BECHTEL & TECHNIP project standards.

Career Summary

March 2014 – October 2014
COMPANY : TECHNIP
PROJECT : HALOBUTYL – 9409C
CLIENT : KEMYA (SABIC & EXXON MOBILE joint venture)
Al-jubail, KSA

July 2010 – December 2013
COMPANY : TECHNIP Italy
PROJECT : JUBAIL EXPORT REFINERY PROJECT (JERP Package 2A)
CLIENT : Saudi ARAMCO & TOTAL joint venture
Al-jubail, KSA

August 2006 – 30 June 2010
COMPANY : TECHNIP Italy and BECHTEL joint venture
PROJECT : Khursaniyah Gas Plant
CLIENT : Saudi ARAMCO
Al-jubail, KSA

August 2003 – June 2006
COMPANY : TECHNIP Italy
PROJECT : Unleaded Gasoline/Low Sulphur Gas Oil (ULG/LSGO)
CLIENT : TAKREER (ADNOC)
Ruwais, Abu Dhabi UAE

An Expansion project, Unleaded and Low Sulphur Gas Oil (ULG/LSGO) facilities were added and plan to commission early 2006, aimed to increase Gasoline productions & Low Sulphur Gas Oil.

March 2001 – May 2003
COMPANY : TECHNIP Italy
PROJECT : HARADH Gas Plant
CLIENT : Saudi ARAMCO
Haradh, Eastern province, KSA

New Gas Plant, mainly Offsite facilities, Sales Gas Compressor, Switch Gear area, Flare & Burn pit, Patrol road Waste water treatment, ponds, Pre-Engineered buildings, Gas Processing Area, Sulfuric Processing & Switchgear.

Monitored #4 Substations, Main Substation (230KV), CCR, Process Interface Building

1999 – 2000
COMPANY : Saudi Weimer & Tratche – German Co.
PROJECT : NPC Expansion Phase II
CLIENT : National Pipe Company (NPC)
Half-moon beach, Dharhan KSA

An Industrial Pipe fabrication plant with Pre-Engineered Bldg, machine foundations consisting of Edge Milling 3-Bending machine, Hydrostatic Equipment, Expander Machine, machines pipe fabrication.

1998 – 1999
COMPANY : KENRICH
(Kim Development Industries Ltd. Pte.)
PROJECT : Reclamation of Jurong Island
CLIENT : Singapore Government
Pulau Sejarah, Singapore

Roads, bridges, retaining walls. Locally firm, a sub-contractor of Penta Ocean and Sumitomo Corporation.

Located in reclamation island – Pulau Seraya, industrial area related road Expansion project.

1997 – 1998
COMPANY : DCCD Engineering Philippines
PROJECT : ICC – Butelco Building (International Communication Building)
CLIENT : British Company (merge Telecommunication PLDT and Bayantel)
Batangas, Philippnes

1995 – 1997
COMPANY : DCCD Engineering Philippines
PROJECT : CABLE & WIRELESS Expansion I (British Shipping Docks)
CLIENT : British Shipment in Bauan Batangas, Philippines
Shipping Yard & Structural Steel Cat walk, Conc. Piling & Site Development
Batangas, Philippnes

November 1993 – September 1994
COMPANY : PORTRADE Realty Corp.
PROJECT : CAEDO Commercial Center (Shopping Mall, cinemas, stalls & parks)

 

 

 

 

 