Relevant Qualifications
DEGREE IN CIVIL ENGINEERING
Languages
ITALIAN, ENGLISH (SPOKEN & WRITTEN)
FRENCH,RUSSIAN (SPOKEN ONLY)
Career Experience
Sep 1983 -Dec 1986
With EDILIZIA MESSAPICA (BRINDISI) as Deputy Site Manager / Quantity Surveyor in the construction of Civil Buildings in ITALY ( approx. value 7 million US $ ).
Jan 1987- Jun 1987:
With ENTERPRISE (VIAREGGIO) as Deputy Site Manager in the construction of a Residential Complex in Gharyan LIBYA ( approx. Value 25 million US $ )
Jul 1987 – Dec 1990
With S.AP.IND. (ROME) as Site Manager in the following Projects :
Jan 1989 – Jul 1989
IN ITALY : -Fiat factory Cassino (FR), University of Salerno, Buitoni Factory Sansepolcro (AR), US Navy Naples, Capodichino Airport Naples, Iveco Factory Brescia., Scott Sud Factory Alanno (PE), Marzotto Factory Valdagno (VI), Cameo Factory Desenzano D/G (BS).
July 1987 – Sept 1988
IN RUSSIA : Tannery Factory Cogolo – Rjazan
( Contract value 250 million US $ )Sub-Contract CODEST – Italy
Sept 1988 – Dec 1988 & Dec 1990 – Jan 1990
IN ETHIOPIA : Awassa Textile Factory , Arba Minch Textile Factory.
Sub-Contract TPL – Italy
August 1989 – Dec 1989
With ZSCHOKKE (Geneva) – DRAGADOS (Madrid) : Water Supply Project Ain Tolba – Oran (135 Km) in ALGERIA .
Jan 1990 – Dec 1991
With ENTERPRISE (VIAREGGIO) , Sirte Administrative Complex in LIBYA ( Contract value 200 million US $ ).
Apr 1991 To Aug 2006
STIRLING INTERNATIONAL CIVIL ENGINEERING LTD. – IMPRESA ING. FORTUNATO FEDERICI GROUP
Apr 1991 – Nov 1991
In UGANDA , as Assistant Project Manager / Quantity Surveyor in the construction of Arua regional Hospital. Contract Value USD 6 million.
Dec 1991 – Apr 1993
In TANZANIA , as Assistant Project Manager / Quantity Surveyor in the construction of Tanzam Highway Rehabilitation, Project section 5 Igawa-Igurusi (58 km long, width 10.7 m involving the following major activities, 50,000 m3 of earthworks, 54,000 m3 of crushed stone base and 100,000 tons of Asphalt Binder and Asphalt Wearing Course). Contract Value USD 13m
May 1993 -Sept 1994:
In KENYA , as Project Manager in the Strengthening of St.Austins-Kabete Road & in the construction of Rironi-Mai Mahiu Road Rehabilitation Project (27 km of road involving the following major activities 34,000 m3 of DBM, 60,000 m2 of surface dressing, 8,000 m3 of asphalt binder and asphalt wearing course). Contract value USD 10 million.
Oct 1994 – Dec 1997
In UGANDA , as Project Manager in the Rehabilitation of Iganga-Mbale Road ( 96 Km of road involving the following major works; 200,000 m3 of earthworks, 150,000 m3 of lime stabilised subbase, 150,000 m3 of crushed stone base, 1,700,000 m2 of double seal surface dressing, a 32 m span bridge, gabions and lined drains). Contract Value USD 21 million.
Dec 1997– Feb 2002
IN UGANDA AS PROJECT DIRECTOR in the following Projects :
Rehabilitation of Kampala – Jinja Road Section II ( 48 km with Crushed Stone Base , Binder Course , Wearing Coursem Double Surface Dressing. ( contract Value 7 million US $ )
Rehabilitation of Road and Bridges in Uganda Package B ( Approx. Value 2 million US $ )
South West Region Feeder Roads ( Approx. Value 2 million US $ )
Ishasha – Katunguru Road Phase I , II ,& III ( World Food Programme )
Rehabilitation of Kampala-Jinja Road Section I (24 km of road involving works on section 1 a 24 km stretch with lime stabilised shoulders and double seal surface dressing). Contract value USD 1 million
Paving Works Uganda National Stadium ( running tracks , internal roads , etc.)
Sub-Contract COMPLANT – China Ref. Mr. Chen
First Urban Project – Periodic Road Maintenance of Streets in Kampala
Ntungamo-Kagamba-Rukungiri Road
Construction of Access roads for Nambole National Stadium ( Parking areas and road network within stadium involving the following major activities, 25,000 m3 of crushed stone base and 4,000 m3 of asphalt wearing course, 5,000 m3 of lime stabilised natural gravel base, 50,000 m2 of double surface dressing, street lighting, landscaping and grassing). Contract Value USD 4 million.
Construction of Kampala-Entebbe Road section 2 (5 km of road 20 m wide involving the following major activities, 84,000 m3 of earthworks, 24,000m3 of crushed stone base, double surface dressing 88,000 m2 and drainage 1,200 m). Contract Value USD 5 million. FEDERICI – SKANSKA JOINT VENTURE Ref. Mr. J. Simmonds
– Improvements of Kyambogo Training Centre – Ministry of Works Kampala
– Emergency repairs to Jinja Town Roads
– Resealing of Mukono-Kayunga and Bukoloto Njeru Roads
– Katwe Road Improvement Works
– Construction of Selected Bridges inUganda
– Emergency Repairs to Kibuye-Busega Road
– Emergency Repairs to Busega-Masaka Road
– Routine Mechanised Maintenance of Kisoro-Ikumba Road & Kalengere By-Pass
– Access road and parking area Parliament Building. Sub-Contract SKANSKA
March 2002 – Dec 2002
In TANZANIA as Project Manager: RUFIJI BRIDGE AND ITS FLOOD PLAIN CROSSINGS
Construction of a Main Bridge of 970 m length ,4 minor bridges of 30-90 m length, 13.5 km of newly built-up road . Approx Contract Value 31 million US $
Jan 2003 – May 2003
In GUINEA (Conakry) with ASTALDI as Contract Manager :
Construction of Kankan – Djelibakoro Road. Approx. Contract Value 36 million US$
June 2003 – Aug 2006
In JORDAN as Project Manager :
Construction of Dead Sea Parkway SubProject. ( 11.6 Km of newly built-up road involving the following major work; 2,800,000 m3 of earthworks, 150,000 m3 of crushed stone base, 2 bridges 45m height 90-120 m length , 13 retaining walls up to 16 m height). Approx. Contract Value 22 million US$
Sept 2006 – Sept 2011
In NIGERIA with IMPRESIT BAKOLORI Plc ( IMPREGILO Group):
Project Manager and as from July 2009 Ag. MANAGING DIRECTOR:
– Construction of Chouchi Irrigation Project -Approx. Contract Value 50 mil US$
– Rehabilitation of Agaie-Katcha-Baro Road in Niger State – Approx 12 mil US$
– Rehabilitation of Ikorodu-Shagamu Road in Lagos State – Approx 24 mil US$
Sept 2011 – Nov 2011
In SAUDI ARABIA with ARRIYADH DEVELOPMENT AUTHORITY
Resident Engineer
Development of Eastern Part of King Abdullah Road Project – Riyadh
“The scope of the project deals with the development of an 8km stretch of King Abdullah Road through the improvement of the road layout and traffic management. This scope includes transforming King Abdullah Road into a “free way” and creating an underpass and 4 U-turn bridges in order to relieve the traffic at the intersections. Additionally, a provision for the future Light Rail Transit (LRT) is to be constructed in the middle of the free way, not to mention the improvement of the landscaping scheme of King Abdullah Road to create landmarks and enhance the landing of the shops.”
Sept 2011 – July 2012
In NIGERIA with IMPRESIT BAKOLORI Plc ( IMPREGILO Group):
MANAGING DIRECTOR
KEY DUTIES AND RESPONSIBILITIES
•Lead and directed the engineering department on all construction field operations management planned, programmed, designed, controlled, coordinated and organized the development of heavy civil engineering works, transportation, utility, roads, pavement, bridge, infrastructure, rehabilitation, industrial and prestigious project.
•Turned key management and monitored construction projects activities, and directed operating strategies and systems. Provided technical consultation advice, safety environmental system and supervised the performance based on the contract requirements and client satisfaction.
•Developed and staffed field operations. Recognized for unprecedented performance in the leadership of advanced technology programs. Improved analysis procedures, quality, cost control and originated the civil engineering contracts division on all aspects.
•Shared organizational objectives on all engineering operational, contracts, procedural and critical decisions. I proved the growth margin, which met organizational profit goals.
•Strengthened liaising and coordinated with external individuals, clients, consultants, staff and municipal officials at senior levels, while providing timely and quality service.
From August 2012
In TANZANIA as Project Manager:
RUFIJI BRIDGE AND ITS FLOOD PLAIN CROSSINGS
Construction of a Main Bridge of 970 m length ,4 minor bridges of 30-90 m length, 13.5 km of newly built-up road . Approx Contract Value 31 million US $
Project financed by Millenium Challenge Corporation – U.S.(MCC)
Employer Millenium Challenge Account – Tanzania (MCA-T)