CV, QA, QC Mechanical Engineer With Power And Oil And Gas Experience

Available
Serial No: 33846
Skills keywords: inspector, mechanical engineer, piping, project, QAQC
Current location:  Romania - View on map
Nationality: Romanian
Spoken languages: english, romanian

Education, Licences & Certification

Oil & Gas University from Ploiesti, Romania
Bsc. Mechanical Engineering

High School : CCF Fetesti, Romania – Electronic Section.

Training courses: PTW (permit to work), STA (safety task analysis), CSE (confined space entry), LOTO (lockout and tag out), Fall protection with PFD in Kazakhstan.

Training courses: Confine Space, Fire Extinguisher, H2S, Hazards Identification, Heat Stress, Radiation Safety Work at Height Permit to Work with SNAMPROGETTI SPA ITALY in UAE.

Training courses: Presentation of EIRA QM System and ISO/IEC 17020 Standard, Surveillance on Site, AQ01 for Inspectors site, RCC-M Training for Surveillance Personnel on Construction Site with AREVA in Finland.

Authorization certificate EIRA Mechanical Inspector Level 1

Qualification certificate (Inspector)

Certificate of training to EN ISO 17020 standard

Certificate of training to EIRA Quality System

 

Career Summary

I have 15 years domestic and international experience as a mechanical supervisor, piping inspector, project coordinator, 12 years in Nuclear Power Plant and 3 years in Oil & Gases in different countries like Romania, Kazakhstan, U.A.E., Saudi Arabia, Libya, Finland, Slovakia.

April 2015 – present
NPP OLKILUOTO 3 NUCLEAR POWER PLANT, FINLAND ( AREVA )
QA/QC Piping Inspector

Maintain discerning and constructive relations with the sub-contractors and to serve as link with Engineering, Purchasing, Project units, the Inspector being one of the most present representatives of Areva to the sub-contractor.

Communicate directly to relevant partners (Purchasing, Engineering, Project, Quality…) all essential information related to the quality of the realization and to the performances of the sub-contractor (notably in the case of difficulties considered likely to impact directly the schedule).

Review and approve the follow-up documents.

Participate in the kick-off meeting and, for quality aspect, verify the prerequisites to the launching of operations (coherence and independence of the organization, content of the applicable documents, validity and field of qualifications, control equipments and resource of the sub-contractors).

Apply the Areva notification points on the follow-up documents, in accordance with the surveillance plans, or check that they include the end customer and Areva notifications defined in the order.

Execute the surveillance actions required by the surveillance plan of an order, with the Surveillance Guides to judge the conformity of the product.

Fill in the Surveillance Guides with results of the surveillance actions, showing and justifying the fulfillment of the scheduled surveillance actions.

Apply on the sub-contractors documents which have been the subject of a surveillance action, the date of surveillance, the visa and the stamp/name of the Inspector. The values measured, which have been the object of a verification by the Inspector, may be identified on the reports of the sub-contractor by the surveillance date, the visa and stamp/name of the Inspector.

Detect and/or record the non-conformance for all contractual criteria that has not been respected (equipment or document), then in the limits of the delegations that are given to the Inspector, request the opening of an Areva non-conformance form (NCR/DR). Collaborate to the treatment of non-conformance with the dedicated unit, taking into account the demands of the customer and of Safety Authorities. Confirm the closure of the Areva non-conformance.

Issue the Areva Observation Notice for all inappropriate actions and/or for all results imperfectly controlled by the sub-contractor to reach the conformity demonstration/assessment.

Review the Erection Completion Certificates with the verification of the End of Erection Reports.

January 2014 – September 2014
MOCHOVCE 3&4 NUCLEAR POWER PLANT (ENEL INGEGNERIA E RICERCA S.P.A SLOVAK BRANCH)
QA/QC Mechanical Inspector / Supervisor

Supervise mechanical works, plant parts and equipment erection.

Site surveillance.

Verify and update on a regular basis the actual progress of works against the project time schedule, notify the management in case of delay and suggest possible recovery actions.

Check with Coordinator QA/QC and Project Engineer that all documents, relevant to the Subcontractors scope of work, have been shared, arranging the correct management of the documentation.

Work with Planner in planning of activities, verifying subcontractor schedule, in tune with the contract procedure, local regulation and Inspection Plan and Testing.

Coordinate and control the delivery of construction material to site and highlight criticalities and shortcomings.

Check possible damages of supplies and verify that the supplies are complete.

Work with Discipline Coordinator, managing and supervising acceptance tests.

Ensure that all special activities, welding, thermical treatment, etc, have been identified and verify that relevant personnel are skilled.

July 2010 – December 2013
NPP OLKILUOTO 3 NUCLEAR POWER PLANT, FINLAND ( AREVA )
QA/QC Piping Inspector

Piping inspection, site surveillance, pressure test, punch list and reinstatement on site.

Compiling of QA/QC documentations.

Prepare QA/QC documentation prior to handover system to client.

Ensure that piping being installed as per approved P&ID’s and specifications.

Independently generating various ITP’s for equipment and structural works / Piping Hydro test Packs, etc and getting it approved from Client.

Field inspection of all structural and all equipments installation works (assembly, alignment, etc.), piping works (hydro test, etc).

Keeping record of all quality documents relevant to mechanical and piping works (alignment record, piping test pack record, etc.).

July 2009 – March 2010
LCM OILFIELD SERVICES LIBYAN BRANCH (Teeji Engineering) Tripoli, Libya
Project Coordinator

Interacts on-site with architects, engineers and Sub- contractors regarding project execution phases, coordination, evaluation activities and other project concerns.

Follow up construction project stages and Sub Contractors site performance to ensure the project meets construction guidelines and conforms to standards and specifications.

Hold regular meetings with relevant subcontractors to develop coordinated shop drawings, clarifications, details and works sequence.

Oversees work of contractors to ensure work meets contract specifications and has been implemented into the final shop drawings.

Coordinates project clarifications and details with Consultants for approval.

Maintains records of ongoing construction for as-built references, RFI approval and as – build verification.

Makes drawings adjustments and redesign decisions to resolve problems or conflicts and advise PM for change orders regarding it.

Attends construction weekly meetings with Consultant.

Coordination between architectural, civil, electrical and mechanical shop drawings.

Responsible for supervision of Structural & Architectural shop drawings preparation, co-ordination and submission for approval

Follow-up all Sub-contractors scope of works (Electro-mechanical and finishing works) and Work with sub-contractors, Consultants and staff to resolve construction issues; ensure compliance with contract documents.

February 2009 – May 2009
NUCLEAR POWER PLANT C.N.E. CERNAVODA Unit 2, Romania
Mechanical supervisor

DEPARTMENT: CONSTRUCTION

Supervising piping works to be performed by construction contractor and insure the compliance with established construction schedule and project requirements.

Coordinating and supervising piping prefabrication/erection, steel structures erection, equipment erection activities, carried out by local and international contractors.

Supervising and inspection of level quality performance of construction contractors.

Responsible for Finalising Piping/Steel Structures/Equipment Handover Certification.

Review the adequancy of punch list.Monitor final completion of work.

May 2008 – January 2009
TECHNIP Spa ITALY – YANSAB OILFIELD PLANT
PROJECT- YANBU- SAUDI ARABIA
Mechanical supervisor

DEPARTMENT: CONSTRUCTION

Coordinating and supervising piping prefabrication/erection, steel structures erection, equipment erection activities, carried out by local and international contractors.

Supervising and inspection of level quality performance of construction contractors.

Arrange and coordinate final punch list activities.

Review engineering documentation issued for construction.

Ensure Materials are delivered in time to meet schedule.

Ensure Installations conform to Project Codes and Standards.

Raise technical queries where necessary.

Arrange and coordinate hydraulic and /or pneumatic tests according to Project Specification.

Raise Technical Queries where necessary.

Progress reporting.

Attend Progress meetings.

Liaise with Site Management on issue Mechanical Completion Certificate.

Responsible for Finalising Piping/Steel Structures/Equipment Handover Certification.

Review the adequacy of punch list. Monitor final completion of work.

September 2007 –March 2008
SNAMPROGETTI SPA ITALY – RUWAIS 3RD NGL TRAIN PROJECT– U.A.E.
Mechanical supervisor

DEPARTMENT: CONSTRUCTION

I was employer for SNAMPROGETTI Company (main contractor) and I worked for Gasco Company (beneficiary).

-piping jobs: erection, reinstatement, alignment.

-supervision of installation underground and aboveground pipes GRP and GRE, CS and SS (all diameter) related to cooling water and fire water system.

-supervise the preparation on the testing, of pipe lines on pipe-racks.

-usage of project data and work with other disciplines as required.

-writing and reviewing of mechanical specifications.

-cooperation with contractors (CCIC, Arhirodon, CBI).

-read and interpret, technical drawings, schematics, and computer-generated reports.

-work with other departments for operating problem resolutions in the assigned area and transfer engineering skills and technology.

-provide routine support of refinery mechanical systems and field equipment, while supporting the long-term improvement of mechanical facilities.

-identify tie – in points within existing facilities, specify the requirements for the safe execution of the tie-in.

-familiar with Permit to work system and able to raise permits for the task and close the permit to work on completion of the assigned task.

-prior to start of works, to check the Suppliers material and technical documentation delivery schedule

( ASME-Section II ).

March 2007 – August 2007
SICIM SPA ITALY – PFD-TCO, SGP SULPHUR PLANT , TENGIZ -KAZAKHSTAN
Piping supervisor

DEPARTMENT: CONSTRUCTION

Coordinate and being responsible with piping works in SGP plant for TengizChevroil.

– responsible for the work progress, meeting the specified quality requirements for the works assigned according to the Project schedule

Responsible with preparing STA’s (safety task awareness) that our client requirements

– maintain a permanent contact with PFD and TCO piping department in order to know all client requirements in plant for the pipe line activities

– organizing all toolbox talks every morning in compliance with local and internal regulations for all crews.

– direct surveillance of the contractors personnel regarding the work technologies and interface problems

– preparing and approving the necessary bill of materials in order to perform efficient work as per the Project schedule (piping and supports prefabrication)

– reporting area of work and specific activities in weekly and monthly reports

– verifying the work packages from technical point of view

– pressure test supervision

-monitories permanent all activities and correct all unsafe acts during day activities.

– mounting pipes from 2’’ to 80” on different structural pipe-racks and confined spaces.

-supervise the preparation on testing of pipes in the field( ASME-SECTION II, ASTM- Standard E194, ANSI- Standard B16.5)

-issuing of “AS BUILD’ documentation for piping system with contractors Technical Quality Department Support

– preparing all work permits in compliance with client requirements

Team leader for 40 employees from different nationalities.

March 2005- March 2007
NUCLEAR POWER PLANT C.N.E. CERNAVODA Unit 2, Romania
Pre-commissioning and Commissioning Engineer

DEPARTMENT: COMMISSIONING

– Organizing, assigning and supervising pre-commissioning activities, performed by contractor,

– Review and update pre-commissioning plan accordingly with QA&QC system and client standards,

– Developing and preparation of pre-commissioning systems and detailed procedures for flushing, blowing, chemical cleaning/pickling of process lines of compressors, leak test, etc. accordingly with client standards and comments submitted to review, comments and approval to Comm. Manager and client organization,

-Reinstatement procedure for systems,

– Develop and prepare inspection and test reports for pre-commissioning activities and forwarding to Comm. Manager and QA&QC Manager for review, comments, approval and integration in QA&QC plan for pre-commissioning and commissioning,

– Planning and scheduling of activities in collaboration with construction contractor designated personnel, estimation of manpower, equipments and materials necessary for each activity and forwarding to management for approval and to construction contractor,

– Reviewing and checking of materials, chemicals inventory for pre-commissioning activities and spare parts from equipment suppliers and vendors,

– Assure technical assistance for commissioning and start-up of units on request of client operation group.

April 2000- March 2005
NUCLEAR POWER PLANT C.N.E. CERNAVODA Unit 2, Romania
Mechanical Coder engineer

DEPARTMENT: MATERIAL CONTROL

-Bringing up to date and introduction in CMMS (CANDU Materials Management System) database, the buying demands, bill of materials, material reports,

-Maintain of database: bill of materials, received invoices, material issue account.

-Direct surveillance of the contractors personnel regarding the working technologies, establishing the necessary materials for the work to be performed regarding the work progress, verifying the work packages from technical point of view.

 

Software Experience

-AutoCAD

-MS Office, Access, Word, Excel, Outlook

-WMS – Work Management System

-MEL – Master Equipment List

-TRAK – CANDU Document Control Soft

-CMMS – CANDU Materials Management System

 

Driving license: European B category.

 






popup-img