Profile
I am energetic, enthusiastic, flexible & honest, with good communication skills, knowledgeable and well experienced in multi-discipline positions to Oil and Gas industry installations particularly with LNGs, Refineries & GOSPs, in Project/Construction Management & Supervision, Quality Assurance/Quality Control, Quantity Survey & Engineering, implementing NEC, NFPA, IEEE, IEC, ASTM. API, NEMA, ANSI and other relevant industry standards. Having been engaged and exposed to team work, I acquired knowledge in Civil, Mechanical, and Sanitary works. Proven capability in organization & man-management, capacity to work not only in a team, but has also achieved success in solo jobs. Self-confident & with a sense of fairness, possess the ability to motivate others by example. Looking to further my career, with good employers who utilize existing skills and offer the opportunity to learn new ones in order to develop with the company in particular and the industry in general.
Qualification as QA/QC personnel with Saudi ARAMCO, EXXON MOBIL/Esso Highlands Limited /QATARGAS & Other Industrial Projects):
I Exxon Mobil/ESSO Highlands Limited
Commissioned June 2012 as PMT QA Inspector – E & I
EPC3-PNG LNG Project
Port Moresby, Papua New Guinea
II SAUDI ARAMCO Project Inspection Division (SAPID), Central & Western Region (C & WR) PID
Approved January 2011 – QA Inspection Engineer – Electrical
King Abdullah Petroleum Studies and Research Center (KAPSARC) Project – Riyadh, KSA
III Fujairah Asia Power Company (FAPCO) United Arab Emirates
Commissioned November 2009 as Commissioning Inspector E & I
for ALSTOM Power/SIDEM/OTV (FAPCO F2 Expansion Project)
IV Exxon Mobil/Qatar Liquefied Gas Company Limited (Qatargas)
Commissioned June 2006 as PMT QA Inspector – E & I
for Qatargas II LNG Expansion Project
V Saudi ARAMCO Personnel reference file: SAP # 70003507
1. Approved Sept. 18, 2004 as Electrical Inspector for Saudi Aramco WR/JR/PID – Rabigh Refinery Control System Replacement
2. Approved May 18, 2002 as Electrical Inspector for Saudi Aramco SAPID – Haradh Arabian Light Crude Increment (HALCI GOSP II)
3. Approved July 11, 1999 as Electrical Inspector for Saudi Aramco Abqaiq Plants; Upgrade of Firewater Utilities & Control System
VI Other Industrial Projects:
1. Approved 18 Dec. 2003 as QA/QC Electrical & Instrumentation Inspector for MARAFIQ – Power and Water Utility Company for Yanbu
Power Plant Expansion (Installation of Boiler & Turbine Unit # 4)
Royal Commission for Jubail & Yanbu, General Directorate for Infrastructure Projects
2. Commissioned June 2004 as QA/QC Engineer for Installation of New Vacuum Degasser & Water Treatment Plant, SABIC/HADEED/Saudi Iron & Steel Company Expansion Project, General Directorate for Infrastructure Projects, Royal Commission for Jubail & Yanbu
3. Commissioned 21 February 2001 as Electrical Inspector for ALSTOM Power/Saudi Electric Company for Shoaiba Steam Power Plant Project,
Shoaiba, South Jeddah
4. Assigned as Electrical Field Supervisor/Quantity Surveyor for various projects.
Seminars attended:
1. Saudi Aramco e-Learning
Topic Driving Improvement Refresher Course (Passed: 92%)
2. Dubai Health Centre
Topic Confined Space Entry
3. Qatar Liquefied Gas Company (Qatargas)
Topic: Defensive Driving
4. Qatar Liquefied Gas Company (Qatargas)
Topic: H2S Gas and Breathing Apparatus Training
5. Chiyoda Technip Joint Venture (CTJV)
Topic: Confined Space Entry
6. Saudi Aramco, Jeddah Refinery Loss Prevention
Topic: Permit Receiver Course (Passed)
7. Saudi Aramco
Haradh Light Crude Increment- Haradh GOSP 2 Project
Topic: Site Quality Assurance Assessment
8. IIEE – Institute of Integrated Electrical Engineers
S.A. W.R. Chapter – Jeddah, Saudi Arabia
Topic: Microsoft Windows Operating System
Education
Primary & Intermediate Education – Pagudpud Community School San Fernando City, La Union
Secondary Education – La Union National High School San Fernando City, La Union
Collegiate – Feati University, Manila Bachelor of Science in Electrical Engineering
Other Skills:
1) Considerable knowledge in Civil, Sanitary & Mechanical installations.
2) Knowledgeable in the operation of Computers (PC) particularly in MSOffice Word & Excel and WINPCS.
3) Fluently speak, read & write the English language.
4) In possession of International Driving License, Saudi (SAG) driving license, Philippine Driving License and PNG Driving License. (I am very good in driving a number of vehicles, defensively of course.)
Career History
April 14, 2014 to date
Construction Manager & Consultant
Consolidated Engineering Services
(Family-Owned Contracting Company)
San Fernando City, La Union, Philippines
Duties:
Manage and ensure that all preparations and work are carried out according to contract specifications, planned program and standard construction methods.
Ensures that all manpower, equipment and materials required to execute the work are available and quality procedures and safety practices are implemented.
Coordinates and supports engineering and commercial sections.
Acts as a Consultant and advisor to Santa Catalina Builders, (a sister company) and other self-constructing residential owners.
Nov. 26, 2011 – 26 Mar. 2014
PMT QA Inspector – E & I
Applus Velosi Australia/EXXON MOBIL/Esso Highlands Limited
EPC3-PNG LNG Project
Port Moresby, Papua New Guinea
Duties:
As Client Representative, I review Contractors’ Design and IFC drawings against Project Specifications, Engineering Standards and Drawings.
Constant review of Project Quality Plan, Installation & Test Plan including but not limited to installation methods against actual installation.
Coordinate all Inspection matters to E & I QC Inspectors.
Review of Material Technical Submittals, Inspector-in-charge of all electrical and instrumentation works at Utilities & Common Process Areas including HV/MV/LV/FO Cables & Motors installation, MCC Testing & Termination of Cables at SF6 Gas Insulated 115Kv (GIS) Switchgear at Main Substation SS96-1, Utility Area Substation SS96-2, Central Control Center building CCC B-201, CCC Substation SS97, Administration Building B101, Admin Substation SS99-1, Camp & Security Substation SS99-2, Security Building B-105 including 5 Gatehouses, Maintenance Warehouse B111, Chemical Storage Warehouse B113, General Warehouse B112, Street lighting system, Perimeter Fence Security, Alarm and Intrusion Detection System, all buildings and Electrical equipment & materials approval for the project.
Attend to Request For Inspection (RFI) and conducts pro-active inspections and surveillance of contractors’ activities including witnessing of High Potential & other electrical tests & transformer testing. Advise and assist construction & QC personnel of acceptable installation norms. Participate in MCC walk-downs.
Jan. 4, 2011 to Feb. 16, 2012
QA Inspection Engineer
PID/PIS Team Leader
Applus Velosi / SAUDI ARAMCO PID – C & WR SAPID
King Abdullah Petroleum Studies and Research Center (KAPSARC) Project – Riyadh, KSA
Duties:
As Client (Saudi Aramco) Representative, I review Design and IFC drawings against Project Specifications Saudi Aramco Engineering Standards and Mandatory Drawings.
Constant review of Project Quality Plan, Installation & Test Plan and Project Specifications including but not limited to installation methods against actual installation. Coordinate all Inspection matters to E & I Inspectors.
Review of Materials Technical Submittals, QC Personnel Technical Submittal, Interview Contractors’ QC Inspection Candidates and in charge of all electrical and instrumentation works and materials approval for the project.
Attend to Request For Inspection (RFI) and conducts pro-active inspections and surveillance of contractors’ activities.
Advise construction & QC personnel of acceptable installation norms. Attend weekly coordination meeting with Project Inspection Section (PIS). Initiate Non Conformance Report (NCR) for violation of any provision of Engineering Standards, Procedures and Project Specifications.
Enter Contractors’ Violations to Log Book or QMIS & close-out the same upon verification of satisfactory rectification of the violation
2 Feb. 2010 to Jan. 2, 2011
Construction Manager & Consultant
Consolidated Engineering Services
(Family-Owned Contracting Company)
San Fernando City, La Union, Philippines
Duties:
Manages and ensures that all preparations and work are carried out according to contract specifications, planned program and standard construction methods.
Ensures that all manpower, equipments and materials required to execute the work are available and quality procedures and safety practices are implemented. Coordinates and supports engineering and commercial sections.
Acts as a Consultant and advisor to Santa Catalina Builders, (a sister company) and other self-constructing residential owners.
25 November 2009 to 31 Jan. 2010
Commissioning Inspector – Electrical & Instrumentation
SPIE Oil & Gas Services
Middle East LLC
P. O Box 4899 Al Gaith Tower
Abu Dhabi, United Arab Emirates
(On a 3 months Service Visa only) SPIE OGS/ALSTOM/SIDEM/OTV
Steam Power Plant Project
Client: Fujairah Asia Power Company (FAPCO)
Fujairah, United Arab Emirates
Duties:
Testing and Commissioning.
Inspection and monitoring of pre-commissioning & commissioning of electrical & instrumentation installations, particularly in the Desalination Plant’s SF6 Gas Insulated (GIS) Switchgear & Transformers at Electrical Building 7620 and Electrical Building 7020, CO2 Building System Pumps and MCC Switchgear, Pumping Area 7600 Pump Motors and Gravity Filter System Pumps and MOVs and MCC Switchgear & Marshalling Cabinet and Seawater Intake Control Room, Pumps and MCC System.
Conducts inspection to all sub-contractors installation activities, including Hi-Pot cable tests, OTDR tests to Fiber Optic cables and LV power and control cable tests, Switchgears, MCCs, Marshalling Cabinets, Transformers and Bus Ducts to general area and Desalination Plant’s Electrical Building 7620 and Electrical Building 7020, CO2 Building System Pumps and MCC Switchgear, Pumping Area 7600 Pump Motors and Gravity Filter System Pumps and MOVs and MCC Switchgear & Marshalling Cabinet and Seawater Intake Control Room, Pumps and MCC System, monitoring and surveillance of activities and advising construction of the standard and acceptable installation norms.
Punch listing of installation discrepancies and monitoring rectifications. Closing out of TOP punch lists and helps out in construction supervision when free from primary duties.
26 June 2006 to 31 May 2009
Electrical & Instrumentation Inspector
PROJECT MANAGEMENT TEAM (PMT)
EXXON MOBIL / QATAR LIQUEFIED GAS COMPANY LTD
QGXII QATARGAS Expansion Project (The world’s largest hydrocarbon project for the decade)
Ras Laffan Industrial City, Ras Laffan, Estate of Qatar
Duties:
Review of Design and IFC drawings.
Constant review of Project Quality Plan, Installation & Test Plan and Project Specifications against actual installation.
Inspector in charge of Cooling Water area Substation # SS-2903, Instrument Technical Room (control building) # ITR-58 for Seawater Cooling Area Train 4 & 5, Freshwater Cooling Area Train 4 & 5 and Sulfur Recovery Units Substation # SS-2403 & Instrument Technical Room ITR-52 and Sulfur Recovery Unit Train 4 & 5.
Inspection, monitoring and surveillance of installations and testing of High Voltage & Low Voltage cables motors and equipments, including control, HVAC system, UPS system, Fiber Optic cable system, Telecommunications, (PAGA) Public Address and Gas Alarm system.
Taking over of inspection and surveillance activities in other areas during leave of absence of colleagues & helps out in other areas when free from primary duties, such as installation of 130Kv SF6 Gas Insulated (GIS Switchgear at Main Substation SS-2901, Utility Area Substation SS-2902, Instrument Technical Room ITR-55, Process Train 4 Substation SS-2401, Substation SS-2402, Variable Frequency Drive buildings VFD-2401, VFD-2402 & VFD-2403, Instrument Technical Room ITR 51A, Instrument Technical Room ITR-51B, Process Train 5 Substation SS- 2501, Substation SS-2502, Variable Frequency Drive buildings VFD-2501, VFD-2502 & VFD-2503, Instrument Technical Room ITR 53A, Instrument Technical Room ITR-53B, Qatar Petroleum (QP) Gas Line back-up area. Sulfur Storage Area Substation # 2008 and Instrument Technical Room ITR-63, Inlet Facility Area Substation SS-2001, Effluent Area and Slug Catcher Area. Conducts inspection, monitoring and surveillance of all contractors installation activities, including Hi-Pot cable tests, OTDR tests to Fiber Optic cables and LV power and control cable tests, Switchgears, (GIS or otherwise) MCCs, Transformers and Bus Ducts, various Controls, SCADA panels, Transmitters and Gauges, Analyzer Houses and Sheds, Cathodic Protection System, Lightning & Earth Protection System installation, materials quality control and surveillance and monitoring of materials storage procedures.
In charge in the preparation and issuance of (NCR) Non-Conformance Reports and (CAR) Corrective Action Request for electrical and instrumentation to the contractors.
Conducts and records SMCC electrical system punch to area of responsibility including Process Train 4 & 5, Sulfur Recovery Unit Train 4 & 5, Common Sulfur area, Off Site and Off Plot, Utility area, Cooling Water area, Inlet Facility, Effluent area and Slug Catcher area.
Advise construction on the acceptable installation norms. Coordinate with construction the Pre-Mechanical Completion Certificate (PMCC) issuance Inspection and
26 June 2006 to 31 May 2009
QGXII Expansion Project
Punch listing of installation discrepancies, surveillance & monitoring of rectification activities and confirm clearance of such discrepancies with MAP Owner if construction group completed and done satisfactorily as per requirement of drawings and project specifications.
Review marked-up construction drawings prior to incorporation to as-built drawings.
06 May 2006 to 25 June 2006
QA/QC Engineer
QA/QC Department, Head Office (Jeddah)
Carlo Gavazzi Arabia Co. Ltd.
P. O. Box 15291, Jeddah 21444 K. S. A.
Duties:
Develop & prepare Project Quality Plan and ITP for newly awarded Projects.
Support & help-out in the resolution of quality issues at project sites.
01 Nov. 2004 to 04 May 2006
QA/QC Electrical Inspector
Rabigh Refinery Control System Maintenance & Upgrade
B. I. -10-03787, Contract # 6600011261, Rabigh, K. S. A.
Client: Saudi (ARAMCO) Arabian Oil Company
Duties:
Preparation & submittal of (ITP) Installation & Test Plan.
Conducts daily internal and (RFI) final inspection of completed site works & materials particularly in the installation of Uninterruptible Power Supply (UPS) System at Control Buildings: Central Control Room-PIB 1, Process Plant Control Room-PIB 2 & Tank Farm Control Room-PIB 3 and Substations #: 2, 3, 5, 6, 8.1, 8.3, 8.4, 9.1, 9.2, 9.3, 10.1, 10.2, 10.4, HV/LV Power & Control cabling, Cable testing, terminations & tray system, Motor Operated Valves (MOV), Radar Tank Gauging System (RTG), Interposing Relay Panels (IRP), SCADA panels and make sure that these conform to Contract Specifications and Standards.
Raise alerts for material damages and or installation discrepancies.
Prepares Checklists for Inspection.
Prepare Test Packages for testing of electrical wires & cables including communications and fiber optic cable system.
Advise construction of the (Aramco Standard) acceptable installation norms.
Prepares (RFI) Request for Inspection and coordinates with Project Management Team (SAPMT) and Project Inspection Unit (PIU) on quality and ongoing site activities.
07 June 2004 to 21 Sept. 2004
QA/QC Engineer
Royal Commission for Jubail & Yanbu
General Directorate for Infrastructure Projects
Saudi Iron & Steel Company Expansion Project
Installation of New Vacuum Degasser & Water Treatment Plant
07 June 2004 to 21 Sept. 2004
Carlo Gavazzi Arabia Co. Ltd.
Client: SABIC/HADEED/Saudi Iron & Steel Company, Danieli Automation
Duties:
Preparation & Submittal of Project Quality Plan (PQP/QCP) and Installation and Test Plan (ITP).
Supervise Inspectors’ conduct of daily monitoring & inspection of materials & site activities particularly in the installation, termination of Power, Control, Instrumentation works, preparation of Tests & Loop Packages, Supervise Pre-Commissioning of Electrical & Instrumentation works.
Advise Construction Group of the acceptable installation norms in order to avoid or minimize punch points. Coordinate with client’s Representatives or Inspectors.
Raise alerts for material damages and or installation discrepancies. Prepare QA/QC submittals and final close-out documentations.
18 Dec. 2003 to 06 June 2004
QA/QC Electrical/Instrumentation Inspector
Royal Commission for Jubail & Yanbu
General Directorate for Infrastructure Projects
Power and Water Utility Company for Yanbu
MARAFIQ Power Plant Expansion
Installation of Boiler & Turbine Unit # 4
Client: ENEL Power/ANSALDO Consortium
Duties:
Conducts daily internal inspection of site works, particularly with the installation of 115Kv SF6 Gas Insulated Switchgears, Transformers, MCCs, Power & Control Cabling & tray system, Main & Auxiliary Transformers, Distribution & Sub-distribution Panels, Lighting & Sockets.
Prepares Test Packages for Hi-Potential Tests and other required Cable testing. Witness Calibration of various Instruments, Pressure Testing of piping/tubing.
Monitors & conducts daily Internal Inspection of the Instrumentation installation.
Prepares Request for Inspection (RFI), and coordinates with client’s Representatives or Inspectors.
Advise Construction Group of the acceptable installation norms in order to minimize punch points.
15 Sept. 2003 to 16 Dec. 2003
QA/QC Instrumentation Inspector at
United Sugar Refinery Expansion Project
(Expansion of Unit 21, 22 & 23)
Jeddah Islamic Sea Port, Jeddah, K.S.A.
Client: United Sugar Company
Duties:
Conducts daily internal inspection of site works & materials, and make sure that these conform to Plant Specifications and Standards.
Raise alerts for material damages and or installation discrepancies.
Prepare Test Packages for required cable testing. Witness Calibration of various Instruments, Pressure Testing of Piping/Tubing. Conducts daily Internal Inspection of Instrument and Piping/Tubing installation. Supervise Pre-Commissioning & Testing.
Prepares Request for Inspection (RFI) and coordinates with client’s Consultants & Inspectors.
21 July 2003 to 14 Sept. 2003
QA/QC Engineer (Electrical/Instrumentation)
Shoaiba Steam Power Plant Project – Shoaiba, South Jeddah
Client: ASEA BROWN BOVERI (ABB)-ALSTOM Power / Saudi Electric Company (SEC-WR) Western Region
Duties:
Preparation of QA/QC Closeout Documentation for Final Submittal to client.
27 April 2003 to 20 July 2003
QA/QC Instrumentation Inspector at
United Sugar Refinery Expansion Project
(Expansion of Unit 15 & 16)
Jeddah Islamic Sea Port, Jeddah, K.S.A.
Client: United Sugar Company
Duties:
Conducts daily internal inspection of site works & materials, and make sure that these conform to Plant Specifications and Standards.
Raise alerts for material damages and or installation discrepancies.
Prepare Test Packages for required cable testing.
Witness Calibration of various Instruments, Pressure Testing of Piping/Tubing.
Conducts daily Internal Inspection of Instrument and Piping/Tubing installation. Supervise Pre-Commissioning & Testing.
Prepares Request for Inspection (RFI) and coordinates with client’s Consultants & Inspectors.
27 Sept. 2002 to 24 Apr. 2003
QA/QC Electrical & Instrumentation Inspector at
Haradh Arabian Light Crude Increment-II
Haradh Gas & Oil Separation Plant (GOSP)-2 Project,
Haradh, K.S.A.
Client: Saudi (ARAMCO) Arabian Oil Company
Duties:
Conducts daily internal inspection of site works & materials particularly in the installation of 115 KV Transformers & Switchgears, MCCs, Power & Control cabling, terminations & tray system, Firewater motor control system, Fire Protection & Alarm System, Compressor, Degasser, Motor Operated Valves, Local Control Stations, Intrusion Detection & Alarm System (IDAS), Cathodic Protection System, Remote Control System, Chemical Dosing Control System, and make sure that these conform to Contract Specifications and Standards.
Raise alerts for material damages and or installation discrepancies. Prepares Checklists for Inspection, Test Packages for D.C. Sheath (Hi-Pot) Test, Earth Test, Loop Test and other required testing for Electrical & Instrumentation works.
Advise construction of the (Aramco Standard) acceptable installation norms. Prepares (RFI) Request for Inspection and coordinates with (SAPMT) Project Management Team and (UPIU) Project Inspection Unit.
Feb. 2001 to 25 Sept. 2002
QA/QC Electrical Inspector at
Shoaiba Steam Power Plant Project
Shoaiba, South Jeddah
Client: ALSTOM Power-ASEA BROWN BOVERI (ABB)/ Saudi Electric Company (SEC-WR) Western Region
Duties:
Conducts daily internal inspection of site works & materials, particularly with the installation of 4 units 360MW Steam Fired Turbine Generators, MCC, 150Kv SF6 Gas Insulated (GIS) Switchgears, Power & Control cabling & Tray system, Main & Auxiliary Transformers, Distribution & Sub-distribution Panels, Lighting & Sockets, Telecommunications, Master Clock, Public Address and Security Systems & Materials delivered, and make sure that these conform to Contract Specifications and Standards.
Advise construction of the acceptable installation norms. Prepares Request for Inspection (RFI), and coordinates with AP Inspectors & Consultants or Owner’s representatives.
Prepares QA/QC submittals and documentations.
Assists in the preparation of Technical Queries (T. Q.), requests for Field Design Change, and drawing of As-Built documents when free from primary duties.
13 June 1999 to 11 Dec. 2000
QA/QC Electrical Inspector assigned at Abqaiq Gas Plants
Abdullah H. Shuwayer (AHS)
Trading & Contracting Company
P.O. Box 5115, Dammam 31422 K. S. A.
Job # 9612 – Upgrading of Firewater and Drainage System to Abqaiq Gas Plants.
Client: Saudi (ARAMCO) Arabian Oil Company
Duties:
Conducts daily internal inspection of site works & materials, and make sure that these conform to Contract Specifications and Standards. Prepare Checklists for Inspections.
Prepare Test Packages for D. C. Sheath Test, Hi-Pot Test, Earth Test and other required testing for Electrical works.
Advise construction of the acceptable installation norms.
Prepares (RFI) Request for Inspection and coordinates with (SAPIU) client’s Inspectors & (PMT) Project Management Team. Prepares QA/QC submittals and closeout documentations.
15 Mar. 1999 to 12 June 1999
Assigned as Estimator at Engineering Department, Head Office.
Duties:
Do estimate / take-off / re-measurement of work and materials for Commercial & Technical Proposals of Bid Packages to future & ongoing projects, e.g., civil, mechanical, & electrical works.
20 Oct. 1997 to Mar.1999
Quantity Surveyor assigned to AHS Yanbu Commercial Department, at the following projects:
1) Job # 9603 – Ibn Rushd PTA & Aromatics Plant
Client: BECHTEL / Ibn Rushd / Royal Commission – Yanbu, K. S. A.
2) Job # 9606- Construction of Substation 4D & Miscellaneous Civil Works
20 Oct. 1997 to Mar.1999
Abdullah H. Shuwayer (AHS)
Client: BECHTEL / Ibn Rushd / Royal Commission – Yanbu, K. S. A
3) Job # 9608 – Installation of Power Plant Switchgear & Cables
Client: BECHTEL / Ibn Rushd / Royal Commission – Yanbu, K. S. A.
Duties:
Prepares daily Site reports & Performance Analysis, prepare & submit Change Order proposals, monitor, quantify and record progress, measure subcontractors’ accomplishments & prepares payment certificates.
Initiates draft letter or correspondence to clients or subcontractors pertaining to commercial matters, for the Project Manager’s approval & signature, and acting in place of field supervisors going on-leave.
Represents company in Bid meetings and submittal of Commercial and Technical Proposals.
22 Jan.1997 to Oct. 1997
Electrical Field Supervisor, assigned to;
1) Job # 9606- Construction of Substation 4D & Miscellaneous Civil Works
Client: BECHTEL / Ibn Rushd / Royal Commission – Yanbu, K. S. A.
2) Job # 9607 – Inst’n of Seawater Cooling System, Piping, Roads & Drainage.
Client: BECHTEL / Ibn Rushd / Royal Commission – Yanbu, K. S. A.
Duties:
Supervision of all electrical installation and testing: including 135Kv SF6 Gas Insulated (GIS) Station Services Switchgear; high to medium to low voltage transformers & switchgears; cable tray system; perimeter, area & street lighting system and lightning protection & grounding system.
Responsible for the Field Design of conduit & cable routing for lighting system & small power supply and implementation of the same upon client’s approval.
June 1996 to Dec. 1996
Electrical Field Supervisor, assigned to
Job # 9602 – United Sugar Refinery-Jeddah: Erection of 2 numbers Grab Unloading Crane, Substation # 2 & 3, Seawater Intake System and 2.8 kilometer Conveyor system.
Client: TPL (TECHNIPETROL) – United Sugar Co. Refinery Project Jeddah
Duties:
Supervision of electrical installation for the above-enumerated scope of work.
Assist in the planning of 3-Week Look-ahead Schedules. Attend weekly coordination meeting with client & different contractors.
May 1995 to June 1996
E & I Supervisor, assigned to
Job # 9451 Haradh (Gas & Oil Separation Plant) GOSP- 1 Project
Client: Saudi (ARAMCO) Arabian Oil Company / BABCOCK-King Wilkinson
May 1995 to June1996
Duties:
Supervision of installation of Switchgears, MCCs, Firewater motor control system, Power & Control tray system & cabling, Compressor, Degasser, Motor Operated Valve Power & Control, Local Control Stations, Cathodic Protection, Remote control System, Chemical Dosing Control System, Hydrogen Generator Control System & Lightning Protection & Grounding System.
Aug. 1983 to May 1995
Construction Manager & Senior Consultant
Consolidated Engineering Services
(Family-Owned Contracting Company)
San Fernando City, La Union, Philippines
Duties:
Manages and ensures that all preparations and work are carried out according to contract specifications, planned program and standard construction methods.
Ensures that all manpower, equipments and materials required to execute the work are available and quality procedures and safety practices are implemented. Coordinates and supports engineering and commercial sections.
Reports to the general manager. Consultant and advisor to Santa Catalina Builders and other self-constructing residential owners.
07 Aug. 1980 to 23 Aug. 1983
Quantity Surveyor-assigned to the following projects:
AMEC – Arabian Mech’l. Eng’g. Co. Ltd.
A division of GEORGE WIMPEY M E & C of Flyover House-London, in partnership with
Alireza Group
P. O. Box 354 Dhahran Airport, K. S. A.
1) Sulfur Handling & Export Facilities at Uthmaniyah, Shedgum & Berri Gas Plants to Jubail Quay
Client: Saudi (ARAMCO) Arabian Oil Company
2) Construction of Foreman, Training & Administration Buildings at Uthmaniyah, Shedgum & Berri Gas Plants
Client: Saudi (ARAMCO) Arabian Oil Company
3) Construction of Site Utilities & Tenement Buildings – Udhailiyah, K.S.A.
Client: Saudi (ARAMCO) Arabian Oil Company
4) Construction of Site Utilities & Tenement Buildings – Abqaiq, K.S.A.
Client: Saudi (ARAMCO) Arabian Oil Company
5) Construction of THV (Truck & Heavy Vehicles) Maintenance Shop-Dhahran
Client: Saudi (ARAMCO) Arabian Oil Company
6) Al-Najim Workshop – Al Khobar
Client: Al-Najim
7) Polybest PVA Plant – Dammam Industrial Estate II
Client: Talento Spa. – Italy
Sports, hobbies & other interests:
Playing basketball, running (jogging), swimming & a martial arts (Tae-kwon-do) enthusiast. I enjoy reading pocketbooks, magazines, daily papers and other good reading materials.