Qualifications
D. E. Chemical Engineering
Board of Technical Education, Government of India
Passed with first class in 1996.
Member of Indian Institute of Chemical Engineers
(Membership Number: LM-45509)
Career Summary
1) Company: Qatargas Operating Company Ltd, Doha Qatar
Period: Oct 2014 till present
Designation: Process Specialist
Projects Handled: Presently working on:
• Zekreet Project, Doha Qatar
Gasoline (75000 BPSD) Processing Facility
Preparation of Scope of Work for Licensor Bid
2) Company: Foster Wheeler International Corporation, Thailand
Period: April 2013 to May 2014
Designation: Sr. PMC Process Engineer
Projects Handled: Worked as Sr. PMC Process Engineer at home office (FW Thailand) for following units:
• Nghi Son Refinery and Petrochemical (NSRP), Vietnam
Overall Capacity: 200000 BPSD
Naptha & Aromatics Complex:
Naphtha Hydrotreater
Isomerization(PENEX)
CCR
Xylene Fractionation
Parex
Isomer
Tatoray
Sulfolane
Benzene & Toluene Fractionation
Responsible for Review & Comment of following Process Deliverables received from EPC Contractor’s:
PFD, H&MB, UFD, P&ID, Design Basis
Design Philosophies: Isolation, Emergency Isolation, Overpressure Protection, Flare & Venting, Design Condition, P&ID Preparation etc.
Process Equipment Datasheet
Process Instrument Datasheet
Relief & Blowdown Summary
Utility & Catalyst – Chemical Summary
Equipment List
Plot Plan
• Star Petroleum Refining Public Co. Ltd (SPRC), Thailand
Preparation of P&ID Systemization work (including revamp project scope and turnaround scope markups).
Prepared P&ID Systemization Guidelines, procedures and reports.
3) Company: Technip, Abu Dhabi
Period: August 2012 to November 2012
Designation: Sr. Process Engineer
Projects Handled: Worked on the following project:
ADCO – Rumaitha North East CO2 Injection Project , Abu Dhabi
FEED Package preparation for CO2 Injection System (Package 3)
Updation of Process Description
Preparation of PFD, UFD, P&ID, Line Schedule, Tie-in Schedule & Isolation Philosophy. Process Input to Equipment List, Equipment Datasheet for Closed Drain Pump Closed Drain Drum
Markup of HAZOP nodes and participation in HAZOP
Preparation of PFS/PEFS Comment Resolution Sheet with reasons
Co-ordination & Inputs to downstream disciplines i.e. Piping, Mechanical Static, and Rotary, Electrical etc.
Participated in meetings with Client at various stages during FEED.
4) Company: QATAR KENTZ W.L.L, Doha , Qatar
Period: December 2009 to July 2012
Designation: Senior Process Engineer
Projects Handled: Worked on following proposals,
• ExxonMobil – Point Thomson CPF, Alaska
Design of 10,000 bbl/d Oil Production and Reinjection of 10200 psig gas to Injection Well.
Deputed to Singapore for 4 months to carry out Transition Engineering for the CPF (Central Processing Facilities) and associated Utilities.
HAZOP and HAZID study carried out.
Design of separators, Stabilizer and Injection Compressor’s.
Oil is transported to battery limits of plant and Tie-in to existing transport line. PW is treated and re-injected. Gas is also re-injected back to wells. Modularized equipment design to suit climatic conditions of Alaska. Design of all utility packages i.e. IA, N2, Diesel, FW, PW etc.
• Dijla Petroleum Company, Syria
Design of Khurbet East Field Central Processing Facilities (38000 BOPD)
The CPF project scope includes all design aspects associated with the development of a 38000 bbl/day Crude oil CPF, associated Crude Oil Export Line and re-routing of existing flow lines. Design of Inlet manifold, Test & Inlet Separator, Crude oil treater, Crude oil & Produced water storage tanks and associated utilities design. Responsible for making all process deliverables for proposal i.e. PFD, UFD, P&ID, Cause and Effect, Utility Summary, Instrument and Equipment Datasheet etc.
Storage and distribution of all associated Utilities for CPF
Instrument Air System, Fresh / Utility / Potable / DM Water Storage & Distribution System, Fire Water System, Fuel Gas
system, Fuel Gas Treatment Package, Process Flare, LP Tank Flare, Closed Drain & Open Drain, Diesel Storage and distribution system & 5 MW Power Generation using Reciprocating Gas Engines.
• ZADCO Produced Water Treatment Plant, Abu Dhabi
Worked as, Lead Process Engineer for this proposal, which consist of two Trains of 12,100BPD of Treated Produced Water. Treatment Package include design, procurement and construction of all equipments, technology to remove solids and dissolved H2S from inlet FEED Produced water.
Proposal scope also includes supply and design of utilities for new plant from existing utility headers.
• Nimr-G Development and Karim West Water Flood Project, PDO Oman
Worked as, Lead Process Engineer for this proposal, which consist of design, procurement and construction of new FWKO tank, MSV’s, CPI Separators and IGF vessels to cater increased produced water from additional wells from Nimr-G field.
5) Company: Petrofac Engineering India Ltd, Mumbai
Period: January 2009 to December 2009
Designation: Senior Process Engineer
Projects Handled: Worked on following project
• EL MERK CPF , Algeria
Design of Central Processing Facilities (99,000 BOPD)
Worked as Sr. Process Engineer and responsible for the oil section of the project. Work experience includes the process deliverables, interdisciplinary communication and clarification meetings with client for oil section of the project. Task includes finalization of P&ID’s, preparation of cause & effect diagram & preparation of safety valve datasheet etc.
Attended the P&ID clarification and design review meetings with client in Sharjah head office. Participated and represented the oil section in Hazop meeting in Sharjah head office. Prepared all the node markups, basic schemes for ready reference and given description of the node before start up of detailed analysis. Completed all the Hazop actions and issued the documents/drawings to client.
6) Company: TOYO ENGINEERING INDIA LTD, Mumbai
Period: 1997 to 2008
Designation: Senior Process Engineer
Projects Handled: Joined as Trainee Engineer in 1996.
Worked on various International projects such as Middle East, Brazil etc.
• Shell Eastern Petrochemical Company, Singapore
Ethylene Cracker Unit
Detail Engineering
Worked on the methaniser, ethaniser, propaniser and debutanizer section of the project. Responsible for the detailed engineering activities of the project. Also work includes interdisciplinary
Communication and communication with ABB Singapore and Netherland offices.
Worked on design and detailed engineering activities of ethylene storage tank of the same plant.
• Abu Dhabi National Oil Refining Company, Abu Dhabi
Flare Gas Recovery Project
Detail Engineering
• Propylene Recovery Unit, Vietnam
Sour Water Stripper Unit, Vietnam
Deputed to Japan (8 Months) for preparation of basic engineering package.
• Bharat Petroleum Corporation Ltd, Mumbai
Lube Oil Base Stock (LOBS Unit)
Detail Engineering
• JUEG, Saudi Arabia
Ethylene Oxide & Ethylene Glycol
Deputed to Japan (3 Months) for preparation of Precommissioning Manual.
• Gas Separation Plant-5, PTT Thailand
Ethane Treatment Unit
Deputed to Japan (3 Months) for preparation of basic engineering package.
• Petrobras Refinery, Brazil
Delayed Coking Unit
Detailed Engineering