CV, QC Mechanical And Piping Inspector, Oil And Gas

Available
Serial No: 48209
Skills keywords: qa/qc inspector, qc engineer, mechanical engineer
Current location:  Calabarzon, Philippines - View on map
Nationality: filipino
Spoken languages: english, Filipino

PROFESSIONAL EXPERIENCE

TECHNIP thru BUREAU VERITAS PHILIPPINES
Yamal LNG Project Fabrication Module
AG & P YARD, BAUAN BATANGAS, PHILIPPINES
April 09 2015 to December 15

QC PIPING INSPECTOR

Duties and Responsibilities:

 Witness and inspection both fabrication and site activities ensuring that project specifications are built to requirements.

 Conduct daily inspection, monitoring and surveillance activities both fabrication and site which involves safety, piping activities, material and equipment preservation, proper implementation of approved welding procedures and specification is being carried out to jobsite.

 Conduct daily inspection for lay out and cutting, fit-up, material inspection, dimensional, spool release activities prior to painting.

 Coordinate to NDT subcontractor regarding RT joint, MT/PT joint, UT joint and PWHT joint. Witness hardness test execution, positive material inspection, penetrant test and magnetic particle inspection.

 Review and conduct line check inspection to ensure it comply both Engineering and Quality requirements, prepare punch list, punch list clearing on test package issued to subcontractor prior to release for testing.

 Witness and inspection hydro testing and pneumatic test inspection to ensure that all requirements are meet the project specification standards.

 Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements.

 Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements. Conduct final inspection for system mechanical completion certificate (SMCC) for system completeness and prepare punch list for those did not comply with company requirement and final verification upon correction for final approval.

JAPAN GAS CORPORATION (JGC)THRU VELOSI CERTIFICATION, QATAR
RAS GAS BARZAN PROJECT , RFAS LAFFAN, QATAR
September 20, 2014 to December 30, 2014

PMC SUPERVISOR (INSPECTOR)

Duties and Responsibilities:

 Prepare permit as per method of statement and to complete all the signatories and all the necessary document need prior to start the work. Conducts daily Toolbox meetings (15 crews) or pre-task safety induction with co-supervisors and subordinates for discussion of Safety procedures and Methods on how to complete the daily tasks safely and more efficiently.

 Responsible in planning and execution of pre-commissioning and commissioning activity as per Method statement and Company requirements for each sub system. (Air blowing, Water flushing, manual cleaning, Vacuum and Borescope inspection). Ensure that all tasks are followed and performed according to Company/Client Policies and ensuring all SHES guidelines are followed.

 Responsible for the preparation of required documents before commencing pre-commissioning/ commissioning activity for each sub systems assigned, such as Method statement, Job Safety Analysis, (MSDS) Material Safety Data Sheet, Site Instructions0

 Prepares manpower lineup to fulfill the pre-commissioning/commissioning activity in right schedule, Coordinates with the other Departments / Agencies to resolve Interface problems.

 Check System completion thru line checking based on (AFC) approved for construction drawings such as Isometrics & P&ID of each Test Package, check latest drawing revision.

 Witness and supervises the Installation of Flow orifice, Restriction orifice, Strainers, Sampling Probe Analyzer and Final Box up of Equipment, checks required specification based on System Drawings and manufacturer data sheet with QC/QA and Company Inspector.

 Responsible in Piping re-instatement, installation of Control valves (PV, FV, SDV, BDV), Check valves, Thermowell, Rupture disc, Manual valves, TG, PG, PSV and PRV. Checks alignment, flow direction and high pressure side after pre-commissioning activity.

 Supervises punch clearing for each sub system, checks for (DMCC) Dynamic Mechanical Completion Certificate for preparation of Commissioning activities.

 Responsible in planning and execution of Commissioning activities such as System Leak Test, Integrity Tightness Test (HPLT), Air freeing and System drying, Nitrogen purging, Chemical cleaning, Degreasing, In Service test, Mechanical Test Run for pumps, blowers, pin fans, mixers.)

QATARGAS PMT (VELOSI CERTIFICATION LLC)
QATAR GAS PLATUEA MAINTENANCE PROJECT (EXXONMOBIL), QATAR
09,2013 to June 30, 2014February

MECHANICAL/PIPING INSPECTOR

Duties and Responsibilities:

 Supervise and witness both fabrication and site activities ensuring that project specifications are built to requirements. Conduct inspection for sea water line piping (RTR/GRP) from fit up, bonding, support installation, flange management, bolt torqueing, punch listing, testing and reinstatement.

Review test package (documents and NDTclearance) prior to release for line walk dawn.

Review and conduct final line check inspection to ensure it comply both Engineering and Quality requirements, prepare punch list, punch list clearing on test package issued by contractor prior to release for testing.

Conduct daily monitoring and surveillance activities both fabrication and site which involves safety, material and equipment preservation, proper implementation of approved welding procedures and specification is being carried out to jobsite. Check and monitor welder qualification, consumable storage and handling, issuance and returned record, welding equipment calibration certificate. Record inspection finding in job site, issue inspection report and non-conformance report (NCR).Maintain log for inspection reports and monitor close out of non-conformance reports and ensure all documents pertaining to inspection and quality control in a retrievable manner.

 Inspection and witness Hydrostatic test/Pneumatic testing of process piping, utilities piping based on test boundaries and limitation with in P & ID if matching with isometric drawings. Review and check calibration certificate of all gauges use in hydrostatic test or pneumatic test

 Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements. Conduct final inspection for system mechanical completion certificate (SMCC) for system completeness and prepare punch list for those did not comply with company requirement and final verification upon correction for final approval.

 Witness and Supervise Pre-commissioning and commissioning activities such as flushing/ air blowing, system tightness/leak testing and nitrogen purging of piping systems. Conduct line walk down for system that issued for High pressure leak test (HPLT) for final verification of issued punch list prior for release for testing.

QATARGAS PMT  (VELOSI CERTIFICATION  LLC)
QATAR GAS 3 & 4 LNG PROJECT (SHELL and CONOCOPHILLIPS , QATAR
August 1, 2011 to December 31, 2012

MECHANICAL/PIPING INSPECTOR

Duties and Responsibilities:

 As client supervisor— Supervise and witness fabrication ensuring that project specifications are built to requirements .Review and familiarize drawings, specifications, Procedures, Method of statements, Materials specifications, identifications, Quantities, locations, and documentations, prior to construction executions. Daily monitor the contractor progress, daily execution monitoring, assist in all permit issuance, plant access, and all needed work to facilitate easy construction work.

 Responsible for implementing and setting example for safety excellence during constructon. Conduct a safety walkthrough, as well as safe and unsafe auditing.

 Supervise fabrication and erection of pipe spools and pipe supports according to the latest construction isometric drawing. Coordinate among various construction subcontractor and discipline supervisor for the execution of piping works and verify the availability and adequacy of material. To monitor progress with schedule and updating to construction superintendent.

 Day to day monitoring of permits to works for all construction activities if validated and all concerned signatories are completed prior to start to work. Day to day monitoring and participate on contractor and subcontractor daily tool box to remind safety and all concerns prior to start work

 Witness and Supervise hydrotest preparation to make sure all test limits are followed as per blinding activities insure all that blind installed are followed the correct thick as per project standard. Ensure that P & ID and Isometric drawings are matching, venting location, all removable items are remove, followed the correct gasket rating and bolt requirements.

 Witness and Supervise Pre-commissioning and commissioning activities such as flushing/ air blowing, system tightness/leak testing and nitrogen purging of piping systems. Conduct line walk down for system that issued for High pressure leak test (HPLT) for final verification of issued punch list prior for release for testing.

 Work for start –up as construction supervisor as well piping inspector for piping work activities for operation isolation activities. Ensure proper materials bolt, gasket and proper torque value as per project specification requirement. Supervise and monitor all piping related activities like, strainer cleaning, Filter replacement, PRV and Control valve removal and installation after calibration.

 Coordinate subcontractor for other activities like, bolt tightening group, scaffolding erection and dismantling, insulation removal and installation, crane arrangement which required before proceeding piping work activities.

 Coordinate with Operation Shift supervisor which job is priority prior to their notification. Arrange work permit after job assessment prior to start work activities. Conduct safety tool box talk to discuss associated hazard within the work activities. Coordinate planner and maintenance supervisor for arranging materials to Warehouse.

QATARGAS PMT (VELOSI CERTIFICATION LLC)
QATAR GAS 3 & 4, LNG PROJECT (SHELL and CONOCOPHILLIPS), QATAR
December 06, 2009 to July 31,2011

MECHANICAL/PIPING INSPECTOR

Duties and Responsibilities:

 Conduct daily monitoring and survillance activities which involves safety, material and equipment preservation, proper implementation of approved welding procedures and specification is being carried out to jobsite. Check and monitor welder qualification, consumable storage and handling, issuance and returned record, welding equipment calibration certificate. Record inspection finding in job site, issue inspection report and non-conformance report (NCR).Maintain log for inspection reports and monitor close out of non-conformance reports and ensure all documents pertaining to inspection and quality control in a retrievable manner.

 Inspection and witness Hydrostatic test/Pneumatic testing of process piping, utilities piping based on test boundaries and limitation with in P & ID if matching with isometric drawings. Review and check calibration certificate of all gauges use in hydrostatic test or pneumatic test

 Review and conduct final line check inspection to ensure it comply both Engineering and Quality requirements, prepare punch list, punch list clearing on test package issued by contractor prior to release for testing. Witness hydro testing and pneumatic test inspection to ensure that all requirements are meet the project specification standards.

 Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements. Conduct final inspection for system mechanical completion certificate (SMCC) for system completeness and prepare punch list for those did not comply with company requirement and final verification upon correction for final approval.

 Witness Pre-commissioning activities such as flushing/ air blowing, system tightness/leak testing and nitrogen purging of piping systems.

QATARGAS PMT (VELOSI CERTIFICATION  LLC)
QATAR GAS II LNG PROJECT (EXXONMOBIL), QATAR
September 19, 2007 to July 31, 2009

PIPING INSPECTOR

Duties and Responsibilities:

 Surveillance and monitoring of daily welding and piping site and fabrication activities of subcontractor to ensure proper compliance of welding procedure specification and piping erection procedure.

Check and review welder qualification if meet welding procedure specification. Check and monitor consumables storage and handling, issuance and return slip of each welder. Check calibration certificate of welding equipment, electrode mill certificate.

Conduct inspection for sea water line piping (RTR/GRP) from fit up, bonding, support installation, flange management, bolt torqueing, punch listing, testing and reinstatement

 Monitor proper welding shelter and proper pre-heating for each welder before start welding due to below zero degree temperature. Conduct daily inspection on material storage to ensure properly protected, and segregated.

Witness all PT and MT joints as well as repair with joints with partial excavation to ensure that defect was properly remove before re-welding.

 Coordinate to NDT subcontractor regarding RT JOINT, MT/PT JOINT, UT JOINT and PWHT JOINT. Review and check test packages prior to hydro testing to check all NDE requirements meet as per project specification. Check and review isometric drawings as test loop requirement and boundaries if matching with welding history sheet.

 

DETAILS OF EARLIER EXPERIENCE CAN BE PROVIDED UPON REQUEST

 

INTERNATIONAL CODES IN STANDARD USE

1.0 ASME B31.1 / B31.3

2.0 ASME Section 1X

3.0 ASME Section V

4.0 ASME Section VIII Div. I

5.0 API 650 / 620

6.0 API 1104

7.0 AWS D1.1

QUALIFICATIONS

B. S. Mechanical Engineering
Golden Gate Colleges (1993 – 1998)

Registered Mechanical Engineer (055342)
Technical Automotive Mechanics (1991-1993)
Pablo Borborn Memorial Institute of Technology

AFFILIATIONS

ASNT LEVEL II (PT, MT, UT, RT)

 

 






popup-img