QUALIFICATIONS
B.E (Electronics & Communication Engineering)
From Anna University in 2005
PROFESSIONAL SKILLS
Operating System Windows 2003 Server / 8 Professional
Languages ABAP/4
RDBMS SQL Server 2000.
ERP SAP R/3(4.6C, 4.7EE, ECC5.0, ECC6.0).
Service Now (SNOW)
HP-ALM
PROFESSIONAL EXPERIENCE
SOFTWARE ENGINEERING TEAM LEAD
ACCENTURE SERVICES PVTL LTD., HYDERBAD, INDIA
Feb 2011 to Till Date
SAMPLE PROJECT DETAILS:
Project #3:
Client : UPM Kymmene
Duration : Oct 2012 to Till Date
Environment : SAP R/3 4.7EE and ECC6.0
Role : Team Lead – ABAP Technical Consultant/ Release & Test Manager
Client Description: As the frontrunner of the new forest industry UPM leads the integration of bio and forest industries into a new, sustainable and innovation-driven future. We create value from renewable and recyclable materials.
UPM comprises of three Business Groups: Energy and pulp, Paper, and Engineered materials.
In 2011, UPM’s sales exceed € 10 billion. The Project involves in LE, PP, SD, MM and FI modules of SAP R/3 system. Apart from this, the project involves extensive reporting, user exits and transferring the data of the legacy system into SAP system.
Role & Responsibilities (As Release Manager):
• Supervised a team of up to 30 people in multiple locations to successfully deploy releases into Production across all business areas. Owned release process throughout SDLC.
• Concurrently managed multiple Releases and Changes for all SAP applications.
• Worked with external third party vendors with proper collaboration to meet the client’s requirement and to deploy the releases smoothly across various areas.
• Took responsibility of creating the monthly releases, updating the ALM tool with proper test cases for User acceptance testing and assigning the appropriate concept owners.
• Took responsibility for the deployment of objects for every release, and post the time to time updates to the Business, and finally taken care of release closure post deployment.
Test Management:
• Set up and maintain ALM tool for UAT for each assigned area
• Gathering test cases
• Conducting UAT kick-off meetings
• Reporting testing status daily from ALM
• Coordinate evaluation and user acceptance of release testing
• Prepare and deliver UAT testing status reports from ALM
• Coordinate Scoping meetings with vendors
• 3rd party handover process follow-up & other cooperation with vendors
• Capture user feedback
• Process development
As ABAP Team lead:
This is an implementation project in SAP R/3 ECC6.0 version, where my contribution involves the development activities in areas SD, PP, FI, LE and MM modules. The primary responsibilities included:
Supervised a team of 8 people for technical aspects to successfully deliver the objects with good quality.
As a team lead participated in walkthroughs and been responsible for the build of objects and participated in unit and Integration testing.
Participated in the weekly status meetings with the clients to discuss the status of the releases and also for any improvement actions needed.
Develop Custom Reports
Modify existing Reports
Provide Support to resolve technical issues
Analyze the root cause of the problems and provide better solution.
Prepare Technical Specifications
Work On Performance related issues
Modified/created SAP documents using Smart forms/Sap scripts
Worked On User Exits and BAPI’s
Perform Unit/Performance Testing.
Project #2:
Client : 3M Polaris
Duration : Feb 2012 to September 2012.
Environment : SAP R/3 4.7EE and ECC6.0
Role : Team Member – ABAP Technical Consultant
Client Description: The 3M Company, formerly known as the Minnesota Mining and Manufacturing Company, is a United States multinational conglomerate corporation based in Maplewood, Minnesota, United States. They produce more than 55,000 products, including: adhesives, abrasives, laminates, dental products, electronic materials, medical products, car care products, electronic circuits and optical films. 3M has operations in more than 65 countries – 29 international companies with manufacturing operations and 35 companies with laboratories.
Role & Responsibilities:
This is an implementation project in SAP R/3 4.7EE version, where my contribution involves the development activities in areas SD and MM, PP and FICO modules. The primary responsibilities included:
Develop Custom Reports
Modify existing Reports
Develop ALV Reports
Provide Support to resolve technical issues
Analyze the root cause of the problems and provide better solution.
Prepare Technical Specifications
Work On Performance related issues
Modified/created SAP documents using Smart forms/Sap scripts
Worked On User Exits and BAPI’s
Perform Unit/Performance Testing.
Project #1:
Client : UPM Kymmene
Duration : Feb 2011 to Jan 2012
Environment : SAP R/3 4.7EE and ECC6.0
Role : Team Member – ABAP Technical Consultant
Client Description: As the frontrunner of the new forest industry UPM leads the integration of bio and forest industries into a new, sustainable and innovation-driven future. We create value from renewable and recyclable materials.
UPM comprises of three Business Groups: Energy and pulp, Paper, and Engineered materials.
In 2011, UPM’s sales exceed € 10 billion. The Project involves in LE&PP&SD modules of SAP R/3 system. Apart from this, the project involves extensive reporting, user exits and transferring the data of the legacy system into SAP system.
Role & Responsibilities:
This is an implementation project in SAP R/3 4.7EE version, where my contribution involves the development activities in areas SD and MM modules. The primary responsibilities included:
Develop Custom Reports
Modify existing Reports
Provide Support to resolve technical issues
Analyze the root cause of the problems and provide better solution.
Prepare Technical Specifications
Work On Performance related issues
Modified/created SAP documents using Smart forms/Sap scripts
Worked On User Exits and BAPI’s
Perform Unit/Performance Testing.