Relevant Qualifications & Education
• Attending Post Graduation in Construction Engineering and Management at Malaysia University of Science and Technology (Mar’2014) in Malaysia.
• Graduated in BSc. Civil Engineering from IUBAT in December’2001 from Bangladesh.
Profile
Competent Engineer with more than 12 yrs of striking experience to exertion in multi-million dollars construction project.
Able to manage, execute and control the construction activities efficiently which follows Project schedule and budget.
Strong leadership qualities, able to analyze and solve problems.
Highly inquisitive, creative and resourceful; Goal oriented.
Enthusiastic and committed to maintain quality, safety and efficiency.
AREAS OF EFFECTIVENESS :
Construction : Impressive experience of managing, controlling, executing and supervising civil, structural & Infrastructure construction activities in area of Petrochemical, Oil & Gas plant, Pre-Engineered Metal building as well as in Substations, Earth preparation and infrastructure development.
Quality Control: Well educated with Project Quality plan, Inspection Test plan and procedure. Approve by ARAMCO, SEC & SABIC.
Career Summary
PROJECTS WITH ROYAL COMMISSION (RC): INFRASTRUCTURE
I.
Project : Muthrafia site development (Stage-02).
Main Contractor : AL OSAIS CONTRACTING Co.Ltd.
Scope of work : Subcontract Agreement consist the execution of Primary Infrastructure such as Earth movement, Build Roads, Culvert, Sewer system, Storm drainage system, Potable water distribution, Irrigation, street lightings, Power and Communication duct banks.
Subcontractor : AL OSAIS MCM Co.Ltd.
Position : Civil Superintendent
Responsibility : Coordinate and supervise all site construction activities and supervise all field personnel to achieve completion of the project on schedule, within budget, with quality workmanship that conforms to original plans and specifications.
Period : April’2011 to March’2012.
PROJECTS WITH SAUDI ELECTRICITY COMPANY (SEC): SUBSTATION & POWER PLANT
I.
Project : 115/13.8KV Substation at GHORNATAH & NCDC.
Main Contractor : AL OSAIS CONTRACTING Co.Ltd.
Scope of work : Subcontract Agreement comprises the execution of civil works, Build roads, Perimeter Fence, Power and Communication Duct Banks and Site development activities.
Subcontractor : AL OSAIS MCM Co.Ltd.
Position : Construction In charge.
Responsibility : Develops project objectives by reviewing project proposal and plans; conferring with management. Determine project schedule by studying project plan and specifications. Contribute to team effort by accomplishing related results as needed.
Period : Feb’2009 to March’2011.
II.
Project : Qurayyah CCGT power plant site development.
Scope of Work : The scope includes marl capping along with the extensive backfill area approximately 1.38 Km2 and in 2.00 m depth.
Position : Civil QA/QC Supervisor.
Company : Al-OSAIS MCM Co.Ltd.
Period : Mar’2007 to Jul’2007.
III.
Project : Pre-Engineered Metal Buildings at BERRI and NARIYAH.
Scope of Work : The Scope identifies to build two Pre-Engineered Metal building with interior finishes.
Position : QA/QC Supervisor.
Company : Al-OSAIS MCM Co.Ltd.
Period : Jun’2004 to May’2005.
PROJECTS WITH SAUDI ARABIAN OIL COMPANY (ARAMCO): OIL & GAS
I.
Project : Waste water system & tank seals upgrade at Qatif, Dhahran & Hassa.
Scope of Work : The Scope of Work identifies to upgrade the existing sanitary wastewater and oily water systems in Dharan, Qatif LPG Bulk and Hasa Plant. The upgrades to the sanitary wastewater system include new collection systems, lift station, facultative/evaporation ponds. The upgrades to the oily water systems include new collection systems refurbishment and lining of the existing oily water pond. Construct the new ground flare to smokeless type.
Position : Construction In charge.
Company : Al-OSAIS MCM Co.Ltd.
Period : Aug’2007 to Jan’2009.
II.
Project : Intrusion Detection Assessment System.
Scope of Work : The Scope includes the IDAS building with necessary support utilities, around 20km SSD perimeter fence and Prefabricated 08 shelters.
Position : Construction In charge.
Company : Al-OSAIS MCM Co.Ltd.
Period : Nov’ 2005 to Feb’2007.
III .
Project : Khursaniyah Program Site Preparation.
Scope of Work : Scope of Work identifies to cut and fill more than 1.2million m3 with 60cm marl cap, to build the proposed plant primary facilities like Roads, underground utilities, duct bank, cable laying etc.
Position : Site Engineer.
Company : Al-OSAIS MCM Co.Ltd.
Period : Jun’2005 to Oct’2005.
PROJECTS WITH SAUDI BASIC INDUSTRIES CORPORATION (SABIC): PETROCHEMICAL
I.
Project : Saudi Arabian Fertilizer Co. – Ammonia-IV Expansion.
Scope of Work : More than 64,000 m3 of massive concrete structures and installation of steel structures as well as build the plant facilities.
Position : Civil Engineer.
Company : GAMA AL MOSHEGAH ARABIA Ltd.
Period : Oct’ 2003 to May ‘2004.
II.
Project : Petrokemya Polyethylene Project.
Main Contractor : Saudi Toyo Engineering and Construction.
Scope of Work : Approximately 60,000 m3 of concrete structures which include Finishing building, Silo, Reactor, Product ware House and installation of steel structures; build the plant roads, substation, fire proofing and etc.
Position : QA/QC Civil Engineer.
Subcontractor : GAMA AL MOSHEGAH ARABIA Ltd.
Period : Oct’2002 to Sep’2003.