1 . 2013– present
KCC(Al Kifah contracting) holding for construction – Dammam – KSA,Jubail
Project : infrastructure and building construction of C 26 ,C27 the project belongs to royal commission and Bechtel (SABACO)
JOB OBJECTIVES
Senior electrical engineer
1- Electrical engineer responsible for the overall design review development, installation and coordination of C26 project in Jubail, including Power and Water Distribution, Sewer, Fire Fighting, Irrigation, lift stations , petrol stations and Communication systems.
2- Prepared buildings and infrastructure interfacing and design coordination reports and developed contract procurement strategies for the infrastructure works to facilitate compatibility with the building works design and construction programs.
3- Communication with authorities and service providers to finalize the service delivery agreements and to manage the construction phase of the services.
4- Design review and approval of Fiber optic networks , low voltage network and meduim voltage networks(12 packing substation 34.5 KV), street lighting and lift stations .
systems including procurement and construction supervision.
6- Act as a point of escalation for any project MEP issues.
7- Coordinate and manage the MEP activities of project’s team
8- Ensure that documentation commitments are fulfilled.
9- Maintain project plans and schedules, and manage change control.
10- Consistent delivery of high quality solutions.
11- Maintain and develop processes that reduce risk.
12- Ensure project delivered within scheduled budget and time.
13- Preparing procurement schedule including long lead items
14- Attende all technical meetings with special system suppliers and erectors
15- preparing monthely reports including projects status
16- Reviewing and issuance of all technical querries with royal commission
17- Attending regular meeting with RC
18- Evaluating all resouces
2010 – 5.2012
Piccini – Italy
Piccini Group is a leading International group in the construction field. Operates in 80 countries, it makes ove 90% of the consolidated turnover in the construction field. The large experience acquired all over the world, ensures that Piccini Group is the ultimate partner, who can also adjust and merge into any country where it operates. www.piccinigroup.com
JOB OBJECTIVES
Senior electrical Engineer
Oyala complex project – Equatorial Guinea
Hilton hotel , African conference centre , 1200 presidential villas and infra and road works
Total cost of the project 460 Million Euro
• Responsible for Supervision and self-execution of all electrical projects in the field of constructions and power supply systems according to the international standards (NEC, BS, IEEE, IEC, EN, DIN, NFPA, TIA, ANSI…)
• Projects in site trouble-shooting, meetings, modifications, financial follow up, reporting, evaluation, FAT, SAT, commissioning and closure.
• Monitor and control expenses related to the work and ensure organizational forecasts and budgets are met for these expenses
• Handle procurement activities relating to contracts and sub contractors in accordance with company procedures and procurement department activities.
• Undertake team briefings and inception activities to ensure all aspects of work are understood by all concerned parties
• Ensure safety standards and procedures are implemented and followed in accordance with contract requirements and company guidelines.
• Undertake QC reporting interaction with other departments of company and clients to assure production schedules and deliveries are met.
• Be responsible and report on the scheduling of man/material movements for all aspects of construction and or maintenance activity.
• Act as liaison with contractors and client managing any
Work interfaces and enhancements to project scope.
• Preparing material status reports for sub contractors
• Preparing design status reports, which highlighting the requirements and enquires of missed data.
• Preparing subcontractor performance reviews.
• Attending site meetings and process with outstanding issues to rectify.
• Assist MEP manger in Monthly reports
• Review electrical drawings and specifications and giving approval for all materials supplied from the sub contractors according to specs.
• developing Inspection and Testing Procedures (ITP) for all electrical systems and equipments (Low tension panels, cabling, diesel, batteries, rectifiers, UPS, lighting, solar systems, earthing and lightning protection, Fire alarm, Intrusion alarm, PA, CCTV, EPBX, queuing system, IP/CCTV, IP/PA, VOIP, IP/Access control, LAN, WLAN, TVOIP, conference hall systems, street lighting , medium tension networks ,diesel generation , low voltage distribution and BMS.
• Managerial skills: time management, project management, working under pressure, good communication skills and ability to meet deadlines.
01.2007 – 2.2010
Dar Al Handasah (Shair and partners) international consultant
Senior electrical engineer
Saudai arabia,Egypt , Ghana
Responsible for Supervision, design review of all electrical project systems in the field of constructions and power supply systems according to the international standards (NEC, BS, IEEE, IEC, EN, NFPA72, TIA, ANSI…)
Job field
Works in complete renovation of Egyptian central bank in Cairo.
The Project belongs to Government and Consisting of 12 floors (high rise building) Project’s MEP lump sum price is 30,000,000 EP. and constructing of Novetel hotel in Ghana, Accra
Electrical inspector of King Abdul-Aziz airport project , manger, KSA,
Job description
• Provide feedback to design engineers on customer problems and needs.
• Recommend design modification to eliminate system malfunction.
• Review (approve/reject) electrical shop drawings ,Material submittals, prequalification’s, documents, RFI, lifting plans, Method statement and work program and implement my comments for the same.
• Monitors and supervises daily the progress and the quality of the works, acts to make deficiencies rectified. Raises NCRs and ensures quality awareness of subcontractors.
• Report to the RE the pending issues, proposals, and progress.
• Reviews services subcontractors ITPs, elec. etc. in coordination with the PQM.
• Review monthly payment and compare it with actual progress and the cost loaded .
• Attend Meetings with Client representative, Design Consultant and authorities.
2003 – 2007
Dabbass enterprise
Site electrical engineer
City star hotel , Cairo
• Install all electrical and mechanical equipments and pump rooms (chillers, CHW pumps, Booster pumps, CCTV, fire alarm, audio-video system, interpretation system, Medium tension switch gear, lightening protection system
• Prepare of material submittals and compliance statements.
• Coordinate between the different trades.
• Prepare of as-built drawings.
• Participate in testing and commissioning.
2001- 2013
Hyundai construction – INT
Site electrical engineer
Vodafone head quarter , 6 October , Cairo
Job description
• Install all electrical and mechanical equipments and pump rooms (chillers, CHW pumps, Booster pumps, CCTV, fire alarm, audio-video system, interpretation system, Medium tension switch gear, lightening protection system
• Prepare of material submittals and compliance statements.
• Coordinate between the different trades.
• Prepare of as-built drawings.
• Participate in testing and commissioning.