CV, Senior HVAC Mechanical Engineer, Construction Looking Globally

Available
Serial No: 18557
Skills keywords: 
Current location:  İstanbul, Turkey - View on map
Nationality: TURKISH
Spoken languages: english, russian, Turkish

Qualifications

NewPort International University / Bachelor of Science in Engineering – Mechanical Engineering

Istanbul University / Engineering Faculty – Mechanical Engineering (Undergraduate/Lateral transfer to NPU)

Key Skills

o Design Coordination, Consultancy, Quality / Quantity of Installation, Start-Up, Commissioning, Operation and Maintenance of Temporary Acceptance Issues

o EPC (Engineering Procurement Construction) Management

o FEED (Front End Engineering Design) Management

o Heating, Ventilating, Air Conditioning (HVAC) Works

o Heat (Energy) Recovery Systems

o Individual / Central Boiler Plant (Heating Center) Installations

o Piping and Instrumentation Systems

o Thermal Insulation / Cladding Works of Heating-Cooling Systems

o Natural Gas Transmission and Distribution Systems

o Central Cooling Systems

o Compressed Air Systems

o Fuel Reserve / Fuel Filling Systems

o Fire Extingushing Systems

o Oil and Gas Industry (MEP / HVAC) Specific Applications

o Equipment Assembly / Erecting Works

o System Modification of Existing Mechanical Systems, Renovation

o Testing, Comissioning & Handover Documentation

o Intelligence Building Monitoring (Automatic Control) Systems

o Structural / Infrastructural Sanitary Systems (Water Supply, Water Filtering, Potable Water, Domestic Hot Water, Plumbing, Sewage Water, Storm Water Drainage, Wastewater Treatment, Sanitary Fixtures Installation etc.)

Career Summary

Project: DICC Dakar International Congress Center (Francophonie) in Dakar
Employer: Summa Construction Company / Organisation Internationale de la Francophonie (OIF)
Position: MEP Manager of DICC (Francophonie),  Project Related / Reported Superior: Project Manager / Technical Coordinator

Managed Co-workers (Staff / Manpower): 18 / 214

Project Size: 104’000’000 USD

Location: Dakar / Senegal, Istanbul / Turkey

Date: December 2013 – October 2014 (Handed over)

Responsibilities: MEP Project Management of Design & Build (Turnkey) System Installation for a Fast-track (Multifunctional) Congress Building.

Project: Hilton 5 Stars Hotel Construction and Business Development Works in Minsk for 2014 World Ice-hokey Championship
Employer: Akort Construction Company / Flagship Business Development Company
Position: Mechanical Group Manager of Belarus Projects,  Related / Reported Superior: Project Coordinator

Managed Co-workers (Staff / Manpower): 12 / 136

Project Size: 59’000’000 USD

Location: Istanbul / Turkey, Minsk / Belarus

Date: August 2012 – July 2013 (Project has been suspended by the reason of financial / contractual issues)

Responsibilities: Project Management and Consultancy of Design & Build Mechanical and Electro-Mechanical (MEP) System Installation for 5 Stars Hilton Hotel Chains.

Project: Oil & Gas Industry Power Plant Project, Phase II – TR3 Etap in Kashagan
Employer: Mechanical Subcontractor of GATE (Gama-Tekfen J.V.)
Position: HVAC Manager, Related / Reported Superior: Project Manager / Istanbul Headquarters

Managed Co-workers (Staff / Manpower): 24 / 263

Project Size: 284’000’000 USD

Location: Istanbul / Turkey, Atyrau / Kazakhstan

Date: June 2011 – January 2012

Responsibilities: Oil & Gas Mechanical (HVAC) Turnkey System Installation in Power Plant Construction.

Design, Installation, Start-Up, Commissioning, Operating and Maintenance of Temporary Acceptance Issues.

Project: Nissa 5 Stars Hotel Reconstruction in Ashgabat
Employer: Mechanical Subcontractor Group of POLIMEKS Construction / Turkmen Ministry of Interior
Position: Mechanical Project Manager, Related / Reported Superior: Construcion Project Manager

Managed Co-workers (Staff / Manpower): 10 / 116

Project Size: 75’000’000 USD

Location: Istanbul / Turkey, Ashgabat / Turkmenistan

Date: 2009 – 2010

Responsibilities: Mechanical Turnkey System Installation in 5 Stars Hotel Reconstruction. Installation, Start-Up, Operating and Maintenance of Temporary Acceptance Issues

Project: General Motors Automobile Assembly Plant in St.Petersburg
Employer: ENKA Construction / General Motors
Position: Assistant Construction Project Manager / Electro-Mechanical Group Chief, Related / Reported Superior: Project Manager / Project Coordinator

Managed Co-workers (Staff / Manpower): 28 / 255

Project Size: 195’000’000 USD

Location: St.Petersburg / Russia, Enka Istanbul Headquarters

Date: 2007 – 2009

Responsibilities: Project Management and Installation Works of Design & Build Mechanical and Electro-Mechanical (MEP) Turnkey System Installation in Plant Construction.

Design, Installation, QA/QC, Contract Management, Start-Up, Commissioning, Operating and Maintenance of Temporary Acceptance Issues.

Project: Chitila Logistic Park Complex in Bucharest
Employer: Synergy-MET Engineering Company
Position: Electro-Mechanical Project Manager, Related / Reported Superior: Board of Management

Managed Co-workers (Staff / Manpower): 10 / 90

Project Size: 55’000’000 USD

Location: Bucharest / Romania

Date: 2007 (Resigned by myself after trial period)

Responsibilities: Project Management of Design & Build Mechanical and Electro-Mechanical (MEP) Turnkey System Installation in Commercial Construction.

 

Project: Bunge Vegetable Oil Plant in Varonezh / Russia

Employer: Beta TEK Construction / Bunge

Position: Bunge Mechanical Manager / Mechanical Works Coordinator

Related / Reported Superior: Construction Project Manager

Managed Co-workers (Staff / Manpower): 14 / 110

Project Size: 100’000’000 USD

Location: Istanbul / Turkey, Moscow (Head Office), Varonezh / Russia

Date: 2006 (Resigned by myself after trial period)

Responsibilities: Project Management / Coordination of Design & Build Mechanical Turnkey System Installation in Industrial Construction.

Design, Installation, Start-Up, Operating and Maintenance of Temporary Acceptance Issues.

 

Project: Global I Shopping & Entertainment Center in Yaroslavl / Russia

Employer: Renaissance Construction (EnergoStroy Group)

Position: Electro-Mechanical Project Manager

Related / Reported Superior: Technical Coordinator

Managed Co-workers (Staff / Manpower): 26 / 224

Project Size: 154’000’000 USD

Location: St.Petersburg, Yaroslavl / Russia

Date: 2005 – 2006

Responsibilities: Project Management of Design & Build Mechanical and Electro-Mechanical (MEP) Turnkey System Installation in Commercial Building Construction.

 

Project: Various Residental Projects in Turkey and Kazakhstan

Employer: ProMek Engineering Ltd. Company

Position: Mechanical Chief Engineer

Related / Reported Superior: Coordinator

Managed Co-workers (Staff / Manpower): 7-8 / 100+

Project Size: Various

Location: Istanbul / Turkey, Astana / Kazakhstan

Date: 2004 – 2005

Responsibilities: Mechanical Turnkey System Installation in Residential Building Construction.

 

Project: 3 Blocks 600 Shops Shopping Malls Construction in Duzce / Turkey

Employer: FORM Group of Companies (Mechanical Subcontractor of BOROVA Construction)

Position: Chief Mechanical Engineer

Related / Reported Superior: Project Manager / Technical Coordinator

Managed Co-workers (Staff / Manpower): 8 / 85

Project Size: 20’000’000 USD

Location: Duzce / Turkey

Date: 2003 – 2004

Responsibilities: Mechanical Turnkey System Installation in Commercial Building Construction. Installation, Start-Up, Operating and Maintenance of Temporary Acceptance Issues.

Project: 14 Storeys Luxerious Residential Buildings of Turkmen Oil & Gas Ministery, 1st and 2nd Phases
Employer: FORM Group of Companies (Mechanical Subcontractor of ERKU Construction)
Position: Mechanical Project Engineer / System Supervisor, Related / Reported Superior: Project Coordinator

Managed Co-workers (Staff / Manpower): 10 / 95

Project Size: 12’000’000 USD

Location: Ashgabat / Turkmenistan

Date: 2000 – 2003

Responsibilities: Vertical & Horizontal Types Water Source Heat Pump (WSHP) Application for 2 pcs. High Rise Residential Buildings.

Project: National Museum of Kazakhstan in Capital Astana / Kazakhstan
Employer: FORM Group of Companies (Mechanical Subcontractor of OKAN-ISOT Construction)
Position: Assistant MEP Electro-Mechanical Project Manager, Related / Reported Superior: Project Manager / Technical Coordinator

Managed Co-workers (Staff / Manpower): 11 / 135

Project Size: 25’000’000 USD

Location: Astana / Kazakhstan

Date: 1999 – 2000

Responsibilities: Project Management of Mechanical Turnkey System Installation in a Museum Construction.

Project: ISR Plaza (ISR Commercial Complex) in Baku
Employer: FORM Group of Companies (Mechanical Subcontractor of TML-BOROVA J.V.)
Position: Assistant Electro-Mechanical Project Manager / HVAC Engineer, Related / Reported Superior: Project Manager

Managed Co-workers (Staff / Manpower): 9 / 75

Project Size: 18’000’000 USD

Location: Baku / Azerbaijan

Date: 1997 – 1998

Responsibilities: Project Management of Mechanical and Electro-Mechanical (MEP) Turnkey System Installation in a Multifunctional Commercial Building Construction.

Consultancy, Installation, Start-Up, Operating and Maintenance of Temporary Acceptance Issues.

Project: MOSTBANK Headquarters Building in Moscow
Employer: FORM Group of Companies (Mechanical Subcontractor of MIR-GURIS J.V.)
Position: Assistant Electro-Mechanical Project Manager / HVAC Engineer. Related / Reported Superior: Project Manager

Managed Co-workers (Staff / Manpower): 8 / 70

Project Size: 16’000’000 USD

Location: Moscow / Russia

Date: 1996 – 1997

Responsibilities: Project Management of Mechanical and Electro-Mechanical (MEP) Turnkey System Installation in a Multifunctional Commercial Building Construction.

Project: TEKFEN / MIS SUT Milk Processing Plant, Yogurt Fermentation / Incubation Chambers in Istanbul / Turkey
Employer: FORM Group of Companies (Mechanical Subcontractor of TEKFEN / MIS SUT)
Position: Mechanical (HVAC) Engineer (Project Representative), Related / Reported Superior: Project Coordinator

Managed Co-workers (Staff / Manpower): 4 / 24

Project Size: 10’000’000 USD

Location: Istanbul / Turkey

Date: 1996

Responsibilities: Design & Build Mechanical and Electro-Mechanical (MEP) Turnkey System Installation in Plant (Industrial) Construction.

 

 