Relevant Qualifications
Bachelor of Engineering in Mechanical Engineering (Visvesaraiah Technological University, India
In March 2006
Certificate for Risk Mitigation & Project Safety Plan 2010 by IACET.
Courses in ISO: 9001 Quality Management System, Cost Management through budgets & PACE (Level 1).
Certificate for Procurement planning by project management Institute.
Certificate for Excavation and Trenching safety, IACET.
Certified for welding, cutting and brazing for Construction.
Undergone Industrial training in Diesel Power plant & KMML (Titanium dioxide pigment plant).
Profile
An Engineering graduate having 9 years of experience in Construction of Hospital project, Pump Stations, fountains, Generator plant, chiller plant, Water Treatment plant, Automatic waste collection system & Infrastructure works (Water, sewage, storm, Fire Fighting, Chilled water & Water mist Fire system)
Installation, Testing & Commissioning of HVAC, Plumbing (Chilled water, Sewage, Drainage & Vent) & Fire Fighting system of High rise buildings & Utility plant.
Abu Dhabi Municipality (UAE) approved Electro-Mechanical Engineer.
Skills in AutoCAD, Ms Office and very good Computer knowledge.
Certified in RT, UT, PT&MPT (American Society for Non-destructive Testing-Level II).
Preparation of P&ID diagram for Mechanical works.
Career Summary
Activity 1
Period June 2011 – Continuing
Company: Hydro Engineering Consultant.
Designation: Mechanical Engineer
Project1:Central utility complex & utility tunnel-The Holy Haram Expansion Makah
Project2: Makah Holy Mosque Hospital (30 storey Building)
Client: Ministry of KSA
Duties and Responsibilities:
Chiller Plant
Installation of Chiller units (York Titan) Capacity (32 Nos. x 5000 Ton= 1, 60,000 Ton), Cooling tower 32 Nos. (GEA Polaces), Condenser water pump (ITT Bell & Gossett) AFV, Balancing valve, Four way valve, Cooling tower filtration unit (Veolia), Self-cleaning strainer, Dosing system, Air separator (Vessel), Expansion tanks (Amtrol), Primary water pump (315.5 /s @ 180 kpa), Secondary chilled water pump, Overhead crane(50 Ton), Black steel pipes welded (Dia 1400) for chilled water return & supply.
Material takeoff for the construction of the mechanical work of the project.
Checking the shop drawing with Design drawing, if any correction needed as per the site condition, informing the technical department.
Making Site Construction Report (SCR) to consultant as per the site condition changes in the drawing.
Responsible for QC inspection and consultant inspection.
Co-coordinating with Civil, Electrical departments & Sub-contractors for co-ordination of work.
Maintain the log for shop drawing, IR, Material submittal for follow up.
Preparing the weekly Mechanical installation status & civil work status.
Generator plant:
Installation of diesel generator (16 Nos. 4.4 MV) Make – Caterpillar, Radiator (GEA), Daily fuel tank 5000 liter (16 Nos.) Fuel overflow tank – 5000L (2 Nos.), underground fuel tank each 100,000 liters (5 Nos.) Fuel transfer pumps (Ewon USA), overhead crane (10 Ton).
Installation of cooling system, Compressed air starting system, Fuel supply & drain system, Lube oil supply & drain system, Combustion air, Exhaust air & breather unit system piping’s.
Water Treatment Plant:
Installation of hydro disc filter system for polishing of treated sewage effluent water.
Installation of backwash pump, online analyzer, chlorine analyzer, chlorine dosing system, stabilized bromine dosing system, chemical pumps, turbid meter etc.
Central waste handling plant:
Installation of blower pumps, waste cyclone, dust cyclone, waste compactor, overhead crane (10 ton), and monorail crane (1.6 Ton), carbon steel pipes.
Reviewing the drawings, submittals& discussing the technical issues to Mari matic, Finland.
Utility Tunnel :( From CUC to AL- HARAM) – 1.3km
Installation of different size of pipes supports & Ventilation jet fans on every 200meters.
Activity 2.
PeriodFeb 2009 – April 2011)
Company: Parsons International LTD, UAE
Designation: Electro-Mechanical Engineer
Project: Corniche -Infrastructure & Associated works.
Client: Abu Dhabi Municipality.
Duties and Responsibilities:
Inspecting the installation of pumps(Grundfos, ITT lowara),Valves(Econosto), penstock, odour control unit, screen filter, pressure vessel, basket strainer, flexible joint, over head crane, Ac units, flow meters etc in pumping station.
Supervising the MS pipe galvanizing and VJ coupling installation.
Checking and Approving GIR, day work, material submittals, shop drawing, As-built drawing, cost estimates and work orders.
Inspecting the installation of submersible pumps, float valve, float switch, filtration system, level sensor, auto back wash valve etc. in the water features.
Review the method statement of mechanical works.
Inspecting the material storage in the site & ensure it is stored as per the contract recommendations.
Checking the hydraulic calculations of pumps.
Inspecting the installation of fire pumps as per the NFPA rule.
Preparing monthly QA/QC progress report & safety reports and submitting to the client.
Activity 3.
Period July-2007 – January-2009)
Company: Wade Adams Contracting LLC, UAE
Designation: Mechanical Engineer
Project – 1: P-100 Mirdif Gate East Roads & Infrastructure
Consultant: M/S. Cansult Maunsell
Client: M/S.Dubai Properties
Project – 2: Midriff Interchange
Consultant: M/S. Africon-Al Burg joint venture
Client: M/S. Road Transport Authority
Project – 3: The Lagoons
Consultant: M/S. Parsons International Ltd
Client: M/S. Sama Dubai
Project – 4: The Palm Jebel Ali – Crescent E
Consultant: M/S. Hyder consulting
Client: M/S. Nakheel
Duties and Responsibilities:
Construction, Installation, testing & commissioning of Potable Water, Irrigation Water, Sewerage and Fire Fighting Pumping Station.
Installation and commissioning of plant equipments, machineries and MEP Works such as HVAC System installation, plumbing of the pumping station facilities.
Site Management and supervision of the Construction Site.
Responsible for the consultant and client’s inspection and acceptance of the construction activities.
Materials take off for the construction of Irrigation, Fire Fighting, Sewage Pumping Stations, Networks & related mechanical works of the projects.
Sourcing & pricing of materials takeoff from the contract drawings within the limit of BOQ. Major Equipments are Vertical Turbine Pumps, Submersible Pumps, Jockey Pumps, Split Casing Pumps, Fire Fighting Pumps, Mechanical Valves, Hydraulic/Control valves, Filters, Instrumentations, Pressure vessel, Strainers, dosing system, HVAC Equipments etc.
Price, delivery and payment terms & condition negotiations with the suppliers / manufacturers.
Techno-economical evaluation of the materials to be procured.
Preparation & follow up the materials delivery schedule.
Responsible for the preparation of shop drawing, as-built drawings, material submittals, getting approvals from the consultants etc.
Reporting to Project Manager & Company Manager.
Water network line and chamber work.
Activity 4.
Period May 2006 – May 2007
Company: – The Kerala Ceramics LTD, India
Designation: Mechanical Maintenance Engineer.
Duties and Responsibilities:
Site supervision of civil work in biogas plant and submitting report
Maintenance of different types of pumps and motors.
Preparing mechanical drawings for fabrication work and pipeline work.
Operation and Maintenance of hydraulic Press in the plant.
Site supervision of mining area and submitting report.
Estimation, Costing and Tendering of work.