Significant Achievements: |
||||||||||||||||||
|
|
||||||||||||||||||
|
|
May 2013 – Date | |||||||||||||||||
|
|
preparation of shutdown/startup procedures for Karan Gas Field and follow-up implementation of these procedures with field service operations. | |||||||||||||||||
|
|
Detailed procedures shutdown, depressurizing, N2 Purging, securing the producing gas wells & dismantling flow lines for safe Rig approach. | |||||||||||||||||
|
|
Safe commissioning & start-up procedures after Rig move. | |||||||||||||||||
|
|
Issue detailed Isola0tion Procedures for Karan Gas Field equipments & during T&I including job safety analysis (JSA) & Risk assessment. | |||||||||||||||||
|
|
Follow up daily field activities during normal operation and troubleshoot any arise operation problems. | |||||||||||||||||
|
|
Follow up with producing division to ensure Safe Startup & Shutdown for the high pressure gas producing wells. | |||||||||||||||||
|
|
Follow up implementation of Karan Gas wells X-Mass tree valves integrity test | |||||||||||||||||
|
|
Review and updating KARAN field Operation instruction manual (OIM) . | |||||||||||||||||
|
|
Supervise the test & inspection (T&I) activities for 3 wellhead platforms at Karan field. | |||||||||||||||||
|
|
Attend hock-up, commissioning & start up of new wellhead platforms within the field. | |||||||||||||||||
|
|
July 2007 – May 2013 | |||||||||||||||||
|
|
Area authority for Ras Budran Oil/gas field (RWE- Egypt), supervise the offshore activities at the WHP Clusters & Tie in Platform. | |||||||||||||||||
|
|
Supervise GOSP Operations, Gas Compression Plant, Storage & Loading Facilities thru SBM /or Land loading lines. | |||||||||||||||||
|
|
updating operation procedures for Ras Budran field production facilities. | |||||||||||||||||
|
|
Prepared significant aspect & impact and risk assessment for the Field On/Offshore Facilities.
|
|||||||||||||||||
|
Areas of Expertise: |
||||||||||||||||||
|
Offshore Operations ( high pressure sour Gas wells). Gas conditioning and compression plants. Water injection plant operation. Waste water treatment Plant. Work permit process control. Hazard identification & Risk assessment. Operation of Oil /Gas wells including natural flow, Gas lift & ESP system |
|
Operation of Oil/Gas Gathering System, including Pipelines Integrity by Scraping Operation (Cleaning, V-Jet & ILI) and Chemical Injection Operation (CI, BCI, MEG &KHI) GOSP operation (separators, heat exchangers, heaters, Desalting Vessels) Storage & loading facilities thru SBM /and land pipeline. commissioning and start up Procedures of new equipments/plants
|
||||||||||||||||
|
Carrier Development |
||||||||||||||||||
|
May 2013 -Date |
SAUDI ARAMCO (Contract Base): KARAN Gas Field as Offshore Operation Engineer in Northern Area Operation Engineering Unit ( NAOEU ). |
|||||||||||||||||
|
|
|
|||||||||||||||||
|
|
|
|||||||||||||||||
|
|
|
|||||||||||||||||
|
|
|
|||||||||||||||||
|
|
|
|||||||||||||||||
|
2006-2013 |
Suez Oil Company (SUCO) a joint venture between E.G.P.C (Egypt) & RWE DEA (Germany) |
|||||||||||||||||
|
|
Oil & Gas Senior Operation Engineer : |
|||||||||||||||||
|
|
Responsibilities: |
|||||||||||||||||
|
|
Responsible for Onshore Processing Facilities / Offshore Production Platforms as follow: |
|||||||||||||||||
|
|
|
Operation of Gas conditioning and compression plant, Water injection plant, Oil / Gas separation and oil dehydration |
||||||||||||||||
|
|
|
Responsible for storage area (floating roof tanks) & Loading Facilities thru SBM / or Land Pipelines. |
||||||||||||||||
|
|
|
Good Experience and knowledge for Natural Flow, SRP, ESP & Gas Lift Wells. |
||||||||||||||||
|
|
|
Commissioning and preparation of operating procedures of new plants and equipment. |
||||||||||||||||
|
|
|
Preparation and implementation of field planned shutdown. |
||||||||||||||||
|
|
|
Preparation of production division budgets (capex/opex). | ||||||||||||||||
|
|
|
Identifying the hazard and specifying precaution to be taken before, during and after all tasks covered by work permits and supplementary isolation certificates. |
||||||||||||||||
|
|
|
Study modifications required to the existing production facilities | ||||||||||||||||
|
|
|
Ensure that all company employees and contractors adhere to company HSE regulations during their activities. |
||||||||||||||||
|
2004-2006 |
Shift Process Engineer “Elamriya Oil Refining Co.” (APRCO):
(APRCO) is a leading Company in Oil Refining Field, Based in Alex, Egypt. The Company Divided into Several Plants, I worked in the (Linear Alkyl Benzene Production Plant) as shift process Engineer for 2 years. |
|||||||||||||||||
|
Qualifications : |
||||||||||||||||||
|
|
B. Sc. – 2001 of Chemical & Oil Refining Engineering, Suez Canal University. |
|
||||||||||||||||
|
Personal Details: |
|
14th of December 1976. |
||||||||||||||||
|
|
Date of Birth |
14th of December 1976. |
||||||||||||||||
|
|
Marital Status |
Married |
||||||||||||||||
|
|
Driving License |
Yes |
||||||||||||||||
|
|
Military Status |
Completed |
||||||||||||||||
|
Language: |
|
Mother tongue |
||||||||||||||||
|
|
Arabic |
Mother language. |
||||||||||||||||
|
|
English |
Very Good command in speaking & writing |
||||||||||||||||
|
Training / Professional Development |
||||||||||||||||||
Course Title |
Sponsor |
Period |
|||||||||||||||||
STOP (Safety Training and observation program) |
EDC |
3 Days |
|||||||||||||||||
OSHA General industry |
GESCO Group |
5 days |
|||||||||||||||||
Gas Processing & Handling |
OGS Group |
5 days |
|||||||||||||||||
Surface production facilities |
GESCO Group |
4 days |
|||||||||||||||||
Accident/Incident Investigation |
SUCO OFFICE |
3 days |
|||||||||||||||||
Survival and lifesaving equipment |
Arab Academy For Science, Technology & Maritime Transport |
5 days |
|||||||||||||||||
Report Technical Writing |
Miser Petroleum |
5 days |
|||||||||||||||||
Production Problem Solving |
OGS COMPANY |
5 days |
|||||||||||||||||
Heat exchangers design and selection, |
ENPPI |
5 days |
|||||||||||||||||
Water Injection Technology |
OGS Group |
5 days |
|||||||||||||||||
Dehydration and Desalting |
OGS Group |
5 days |
|||||||||||||||||
H2S training course |
AL KEBAR CENTER (AL KHOBAR-KSA) |
|
|||||||||||||||||
HUWET training course |
AL KEBAR CENTER (AL KHOBAR-KSA) |
|
|||||||||||||||||