CV, Senior Project Coordinator

Available
Serial No: 42655
Skills keywords: civil construction, civil engineer, construction management, project coordinator, project engineer
Current location:  Saudi Arabia - View on map
Nationality: syrian
Spoken languages: Arabic, english, german

Qualifications

• B.Sc in Civil Engineering (2008) from Al-Baath University, Homs – Syria
Structural Engineering Department.

• Primavera Project Planner Course (2008) – Syrians Council of Engineers.

• Etabs Course (2008) – Syrians Council of Engineers.

 

 

Experience Overview

• Eight years of experience in the construction works of buildings and infrastructure projects.

• Five years of experience in the engineering management of mega projects.

 

Senior Project Coordinator (August 2013 – Present)
Project Coordinator (September 2011 – July 2013)
PMDC Project Management and Development Consultants Company – Jeddah/Riyadh – KSA

Job Description:

– Quality, Budget and time control.

– Following up site works progress and quality.

– Review and update time schedules.

– Preparing RFP for consultants and contractors.

– Preparing tender evaluation analysis for bidder proposals.

– Preparing and review consultant and contractor contracts.

– Preparing monthly reports, dashboards, risk register and presentations for Client.

– Auditing invoices and variation orders.

– Review and coordinate drawings for all engineering trades.

– Coordinating with authorities having jurisdiction to obtain permits.

Key Projects:

• Dallah Medical Complex – Design & Construction Stage (November 2014 – Present):
Dallah Medical Complex Project in Riyadh – Saudi Arabia. The total built-up area is around 200,000 m2

Project components:

– Hospital 300 Beds.

– 200 Clinics.

– Hotel.

– Housing.

– Hardscape, landscape and underground utilities.

 

• Equestrian Club Jeddah Waterfront – Design Stage (August 2013 – October 2014):
Equestrian Club Jeddah Waterfront in Jeddah – Saudi Arabia. Developing Jeddah City

Waterfront and providing a modern world class destination and a vibrant place to visit, live, work and invest, host a wide range of social events.

The project land is 150,000 m2 onshore and 182,000 m2 reclamation area. The overall site area is 332,000 m2.  The built-up area is 157,059 m2

Project Components:

– Cluster 1 & 3 retail and F&B area (G+2).

– Cluster 2 Botanical Gardens.

– Cluster 4 Hotels (G+3).

– Basement parking

– Dancing fountain – total area 9,000 m2

– Promenade – total length 3.6 km.

– Ferris Wheel – 60 m diameter.

– Aquarium – total area 3,200 m2

– Hardscape, landscape and underground utilities.

 

• Jeddah Waterfront and Falasteen Street Development – Design & Construction Stage
(September 2011 – July 2013):

Developing Jeddah Waterfront Project in Jeddah – Saudi Arabia, includes demolition, earthworks and underground utilities, asphalt works, public toilets, kiosks, finishing works (hardscape and landscape).

Project Components:

– North Corniche – total length 3.3 KM.

– Middle Corniche – total length 2.5 KM.

– Falasteen Street – total length 1.2 KM.

– Prince Abdulmajeed Roundabout at Middle Corniche.

 

Site Engineer (January 2010 – August 2011):
Al-Madani Engineering Office, Hama – Syria

Job Description:

– Structural studies and executing site construction works (design and build contracts) for several projects in Hama – Syria.

Key Projects:

• Structural studies and construction works (turnkey) for two residential buildings (G+4) – design and build contract.

• Structural studies and construction works for detergent materials factory – design and build contract.

• Structural studies for nine residential buildings (G+3 & G+4).

• Structural studies for five villas.

• Structural studies for three factories trusses.

Site Engineer/Client Representative (August 2008 – December 2009):

Al-Zahraa College, Muscat – Sultanate of Oman

Job Description:

– Following up site progress works.

– Quality, Budget and time control.

– Coordination meeting on daily basis with the consultant and the contractors.

– Auditing Contractor invoices.

– Coordinating with authorities having jurisdiction to obtain permits.

– Preparing daily reports, monthly reports and presentations for Alzahraa College Board members.

Key Projects:

• Al-Zahra College Project (August 2008 – December 2009)

Al-Zahra College Project is an academic complex in Muscat – Sultanate of Oman. The total built-up area is 45,000 m2

Project Components:

– Academic building.

– Administration building.

– Service building.

– Hardscape, landscape and underground utilities.

• Students Housing of Al-Zahraa College:

– Maintenance and renovation works of the existing housing building.

– Preparing plans for future extension.

 

Languages

1- Arabic: Mother tongue

2- English: Excellent.

3- German: Good

 

IT Skills

1. Primavera Project Planner; Projects Management Software.

2. Etabs; Construction and earthquakes study software.

3. Safe;. Construction study software.

4. Sap;. Construction study software.

5. AutoCad

6. Adobe Photoshop.

7. All applications of MS Office.