Education and Training
Institution, City & Country |
Fields of study or training |
Degree, diploma and certificates obtained |
Date |
HOCHTIEF ViCon QATAR W.L.L |
Model Based Quantity Take-Off and Building Information System |
Training certificate |
2010 |
BUREAU VERITAS Cairo – Egypt |
Internal Auditing according to ISO-9001:2000 |
Training certificate |
2002 |
INCO SOFT Co. Cairo – Egypt |
Project management Using “MS PROJECT” |
Training certificate |
1998 |
Faculty of Engineering Cairo University -Egypt |
Environmental Engineering |
Diploma degree |
1991 |
MIS Inc. Cairo – Egypt |
Computer Programming Using “BASIC language” |
Training certificate |
1986-1987 |
Faculty of Engineering Cairo University -Egypt |
Civil Engineering |
Bachelor degree |
1982 |
Computer skills
– MS Office Programs (EXCEL, WORD, POWER POINT)
– AutoCAD
– Adobe Photoshop
Languages
– Arabic (mother tongue)
– English (very good)
Years of Experience
– 29 years
Personal Record
Profession
Performs quantity take-offs of assigned jobs and develops the Job Budget based on approved-for-construction drawings.
Preparing, checking Measurement Sheets and Bending Lists.
Negotiating, agreeing final quantities with consultant.
Prepare the interim payments, final accounts and issuing certificates.
Prepare a bill of quantities listing the individual components required to construct the project.
Complete the Quantities take off process according to company standards.
Revising, and/or re-estimating the variation costs claimed by subcontractors/ contractors for either star rate that were not included in the BOQ or different types and of amendments requested by the Consultant/ Client.
Preparing cost estimations for the project and alternative design solutions.
Exercise effective quality control and quantity control to see that the specifications laid down are strictly adhered to and that the progress is commensurate with the time schedule.
Internal Auditor
Attempting to assess that the quality management system under audit meet the specified requirements and that the company complies with the requirements specified in the audit criteria.
Applying full control on works in site by directing and monitoring:
– Execution of works and its progress.
– Labor welfare and materials validation.
– Measurement of works and preparing sub contractor’s bills.
Employer name & address:
Qatar for Project ManagementNile Corniche Project – 1189 Corniche El Nile Street – Cairo – Egypt |
|||||
Functional title:
– Senior Q.S engineer |
Dates of employment:
From October – 2009 To nowadays |
||||
Project name:
– Nile Cornice Project. |
Budget:
Contract value: US$ 620 million |
||||
Project description: (High-Rise Buildings)
The Nile Corniche Project involves construction of an L shaped South Tower and a North Tower. The project is comprised of a sophisticated mix of luxury apartments, hotel rooms and suites, and a private penthouse. All these units will be situated on a seven storey, above ground podium that houses the hotel’s front and back operations, lobbies, QDE offices and support services functions, and a four‐level parking garage below.
|
|||||
Description of duties:
Senior Quantity Surveyor and responsible for cost reporting and payments to the Contractors/Vendors – Studying, Analysing “Shop drawings” and reviewing project and tender documents, BOQ of the Project and carrying out cost estimates for alternative design solutions – Performs quantity take-off of assigned jobs both Structural and architectural “Formwork, concrete, Reinforcement & finishes etc.” and developing measurements sheets and bending lists. – Agreeing measured quantities with the contractor engineers. – Revising, and/or re-estimating the variation costs claimed by subcontractors/ contractors and issuing variation notes and variation orders. – Preparing monthly Interim Payments for the project and issuing Payment Certificates, including on site and off site quantity verification and confirmation. – Checking materials on and off site quantities and verify delivery and acceptance from the clients representative for payment approval. – Processing and managing all financial issues related to the payment procedure “Taxes, Social Security Contribution…etc.” – Extracting from Payments and preparing all the required information to issue the Follow up reports “Monthly Cost Report and the Forecast Report…etc.” – Providing advice to client on commercial and contractual matters also prepare financial and commercial reports. – Working with Building Information Models to improve productivity and cost savings through verification of quantities, monitoring progress and obtaining traceable and more precise quantities and areas. |
|||||
Employer name & address:
Consolidated Contractors Int’l Company /ORASCOM “joint venture”Golden Pyramids Plaza Project – Naser City – Cairo – Egypt |
|||||
Functional title:
– Senior QS engineer |
Dates of employment:
From October – 2003 To October 2009 |
||||
Project name:
– Golden Pyramids Plaza Project |
Budget:
Contract value: US$ 750 million |
||||
Project description: (High-Rise Buildings)
A large scale tourist urban development project established on 115,000 m2 area on which a total of 78,470 m2 is to be constructed. Composed of the following: – Three “five stars” Hotels “4 towers” – Residential and commercial apartment buildings “7 towers” – Furnished apartment buildings “2 towers” – Commercial center “13 buildings” – Central chiller plant, Substation, Parking areas… etc. For the Two phases project the scope of work includes general construction, procurement of all materials, equipments installation, electrical, instrumentation etc. |
|||||
Description of duties:
For the whole tender items which is divided into two packages – Studying, analyzing and reviewing project documents “As built” structural and architectural drawings, finishing schedules, technical specifications and BOQ of the Project. – Performs quantity take-offs of assigned jobs Structural and architectural “Formwork, concrete, Reinforcement & finishes etc.” and developing measurements sheets and bending lists. – Provides exercises to summarize cost and quantity differences between the Job Estimate and the Job Budget related to quantities, cost and total amounts of the project to the Planning and Cost Control Manager. – Agreeing measured quantities with the consultant engineers. – Provides feedback to the arbitration manager. – Preparing monthly Interim payments for the project. |
|||||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
|
Functional title:
– Technical office engineer – Internal Auditor |
Dates of employment:
From October – 2002 To October 2003 |
Description of duties:
Technical office Supervisor: – Examine and reviewing construction plans, working drawings and quantity bills. – Measuring works and reviewing measurements. – Checking and reviewing interim and final payments. – Work as an assistant to the chief of supervision sector. Internal Auditor: – Participates in planning and preparing for internal audits. – Gather and analyzes evidence to determine extending to which audit criteria are fulfilled. – Perform audits and report its results. |
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
||
Functional title:
– Supervisor engineer |
Dates of employment:
From August – 2002 To October – 2002 |
|
Project name:
– Furniture of ministry of finance’s Towers |
Budget:
L.E 10.00 million |
|
Project description:
Manufacturing and furnishing office units including desks, chairs, filing cabinets, meeting tables,…etc. for 16 floors each floor consists mainly of three head offices , two offices for secretaries, one hall for senior staff , two hall for junior staff and two halls for clerks. |
||
Description of duties:
Exercise quality control on the work to ensure that: – All materials used in the works are in accordance with the specifications. – Detailed specifications are prepared and strictly adhered to. – Working drawings are preparation and comprehensive leaving no place for ambiguity. – The work approval in all stages. – Stores continuous monitoring incorporated with the work to allow the different materials inspections to be done on time. |
||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
||
Functional title:
– Supervisor engineer (Technical office dept.) |
Dates of employment:
From Noveber-1995 To August-2002 |
|
Project name:
Construction of MUBARK Police Academy |
Budget:
L.E 1400.00 million |
|
Project description:
A three Phases project: – Phase 1 consists of the construction of 18 buildings for student’s residents, auditorium, classrooms, administration, showground, gateway and restaurant in addition to landscape works, Road network, Infrastructure. – Phase 2 consists of the construction of 15 facilities buildings “bakery, mosque, hospital, storehouses, workshop, laundry, garage…etc. – Phase 3 consists of the construction of dogs training department and the cavalry department including stables, sheds, clinics, soldier’s residents, administration …etc. Most buildings are of skeleton type with slab and beams ceilings on columns and isolated footings. The auditoriums have steel trusses ceilings. |
||
Description of duties:
– Working within a project team acting as a Resident Engineer Deputy and Technical office Engineer. – Responsible for schedule and cost estimation reviews. – Preparing and maintaining complete accurate project records including monthly progress report, monthly status report, correspondence, etc. – Notify inspection staff to perform inspections, testing and surveys. – Analyzing and reviewing construction plans, survey reports, maps, working drawings and specifications. – Recording and checking the progress of the work against the program including regular monthly updating of the program and of the cash flow statements. – Measuring works and recording measurements in measurement books. – Preparing monthly (running) payments and final payments. – To observe and implement all instructions issued by the Engineer. – Overseeing construction of buildings and the facilities road crossing. – Inspects project site to monitor progress and ensure conformance to design specifications and contract conditions. – Directing and approving stages of construction, operations and maintenance activities at project site. – Directs and participates in surveying including layout installations, establishing reference points, grades, elevations to guide construction. – Communication with contractor and subcontractors – Inspection of all materials brought to site by the contractor. |
||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
||
Functional title:
– Supervisor engineer |
Dates of employment:
From July -1994 To October -1995 |
|
Project name:
The Restoration & Repairing of the Academy of Arts buildings |
Budget:
L.E 2.00 million |
|
Project description:
The restoration for the 5 multi floors buildings including: – Repairing of cracks in the concrete elements and brick walls. – Removing and replacing the ruined floors, Plaster, and mosaic stairs. – Repairing, fixing and repainting wooden doors and windows. |
||
Description of duties:
– Investigation, Inspection and surveying of buildings to locate cracks and its condition also any other defects in ceilings, walls, columns…etc. – Specifying type of repair according to the specifications, technical report, contract conditions and other documents. – Reviewing of time schedule and monitoring work progress. – Directs and approving stages of restoration works, repairs and treatments to ensure its conformance to specifications. – Measurement of work and preparation of measurement books, monthly bills and final bills. – Preparing of monthly progress report. |
||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
||
Functional title:
– Supervisor engineer |
Dates of employment:
From September -1994 To March -1995 |
|
Project name:
Installation of additional elevator for the officers Affairs Building – Ministry of Interiors |
Budget:
L.E 0.20 million. |
|
Project description:
– Testing the existing elevator shaft’s ceiling for the expected loads and removing the existing ceiling to raise the ceiling level in addition to preparing the elevator shaft and the machines room for the new elevator. |
||
Description of duties:
– Overseeing and participating in testing the shaft ceiling’s beams. – Inspecting, approving and passing works in stages. – Inspection of all materials brought to site by the contractor. – Preparation of monthly and other bills for the wok done. – Measurement of work and preparation of measurement books. – Preparing of monthly progress report. – Participating in the works of preliminary handing over committee. |
||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
||
Functional title:
– Supervisor engineer |
Dates of employment:
From October -1993 To June -1994 |
|
Project name:
The Restoration, Repairing and raising additional floor for the officers Affairs Building – Ministry of Interiors |
Budget:
L.E 1.00 million |
|
Project description:
Restoration of a 6 floors building and raising an additional floor including: – Repairing of cracks in the concrete elements and brick walls. – Repairing or removing and casting concrete ceilings. – Removing, replacing, fixing ruined floors, plaster, stairs…etc. |
||
Description of duties:
– Investigation, Inspection and surveying of building to locate cracks and its condition also any other defects in ceilings, walls, columns…etc. – Specifying type of repair according to the specifications, technical report, contract conditions and other documents. – Reviewing of time schedule and monitoring work progress. – Directs, inspecting, and approving stages of restoration works, repairs, treatments and construction to ensure its conformance to specifications. – Measurement of work and preparation of measurement books, monthly bills and final bills. – Preparing of monthly progress report. |
||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
|||
Functional title:
– Supervisor engineer |
Dates of employment:
From February -1991 To December -1993 |
||
Project name:
The construction of Soldier’s residents Building – Ministry of Interiors |
Budget:
L.E 2.40 million |
||
Project description:
Construction of 7 floors, 380 meters area building skeleton type with slab and beams ceilings on columns and pile caps on 18 meters length piles. |
|||
Description of duties:
– Demarcating of structure on the ground. – Inspecting project site to monitor progress and ensure conformance to design specifications and contract conditions. – Inspecting, approving and passing works in stages. – Inspection of all materials brought to site by the contractor. – Preparation of monthly and other bills for the work done. – Measurement of work and preparation of measurement books. – Preparing of monthly progress report. – Participating in the works of preliminary handing over committee. |
|||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
|||
Functional title:
– Supervisor engineer |
Dates of employment:
From March -1991 To August -1991 |
||
Project name:
The construction of electricity and transformer Building – Ministry of Interiors |
Budget:
0.25 million L.E. |
||
Project description:
Construction of one floor, approximate area 120 square meters building skeleton type with slab and beams ceiling on columns and isolated footings. |
|||
Description of duties:
– Demarcating of structure on the ground. – Inspecting project site to monitor progress and ensure conformance to design specifications and contract conditions. – Inspecting, approving and passing works in stages. – Inspection of all materials brought to site by the contractor. – Preparation of monthly and other bills for the work done. – Measurement of work and preparation of measurement books. – Communication with client, contractor and subcontractor. – Preparing of monthly progress report. – Participating in the works of preliminary handing over committee. |
|||
Employer name & address:
ARAB BUREAU for DESIGN and TECHNICAL CONSULTATIONS El Abbasia – Naser City – Cairo – Egypt |
||
Functional title:
– Supervisor engineer |
Dates of employment:
From March -1988 To February -1991 |
|
Project name:
The construction of 3’800 housing unit–Helwan New Community |
Budget:
L.E 30.0 million |
|
Project description:
Construction of two economical housing neighborhoods each of them consists of 32 blocks. Every block consists of 6 to 32 skeleton buildings, three or four floors, slab and beams type ceilings on columns and raft foundation. |
||
Description of duties:
– Demarcating of structure on the ground. – Inspecting project site to monitor progress and ensure conformance to design specifications and contract conditions. – Inspecting, approving and passing works in stages. – Inspection of all materials brought to site by the contractor. – Preparation of monthly and other bills for the wok done. – Measurement of work and preparation of measurement books. – Communication with client, contractor and subcontractor. – Preparing of monthly progress report.
|
||
Employer name & address:
Jamison MacKay and El Hawary consultants group |
||
Functional title:
– Highway & Traffic engineer |
Dates of employment:
From January -1987 To September -1987 |
|
Project name:
Egypt Highway maintenance project |
Budget:
L.E 1.0 million |
|
Project description:
Carrying out road condition surveys and communicating with the roads and bridges authority directorates in order to prepare a road inventory and a data base management system. |
||
Description of duties :
– Working with a consultant team to carry out road condition surveys. – Collecting data about roads condition and maintenance operations from the R.B.A. directorates. – Preparing a road inventory throughout Egypt. – Analyzing the information and participating in the design of a data base management system. |
||
Employer name & address:
Engineering Contractor Co. |
||
Functional title:
– Site engineer |
Dates of employment:
From April -1985 To February -1987 |
|
Project name:
Construction the bridges of El Qalubia & Belbis drains |
Budget:
L.E 0.90 million |
|
Project description:
Construction of 6 reinforced concrete bridges, total spans from 30 to 60 meters long, width about 15 meters, consists of reinforced concrete slab on beams rested on main girders rested on pedestals and precast reinforced concrete piles. |
||
Description of duties:
– Directing and monitoring execution of works according to drawings, design specifications. – Directs construction operations and maintenance activities at project site. – Keeping progress of works. – Checking layout of works and materials of site. – Monitoring labor welfare. – Measuring the works and preparation of subcontractor’s bills. – Keeping inspection book, order book. – Giving completion report. |
||