Profile
Qualifications & Experience
47 years uninterupted experience in Building & civil engineering
SMSTS Site manager safety training scheme
CSCS Construction skills certificate scheme advanced gold card
Full tech building related subjects
First aid at work (3 day course)
Asbestos awareness certificate
Advanced City & Guilds
I am accomplished at setting out works & am a fully qualified Carpenter & joiner
Experience Summary
Companies & Organisations I’ve worked with the following companies & organisations for many years
Albino Builders, Shepton Mallet, Somerset. 2013-2015
Ken Biggs contractors, High Littleton, Somerset. Various dates ongoing.
Atelier 17, Bradford-on-Avon, Wiltshire.
Harper Construction recruitment, Somerset.
Babcock infrastructure. Bristol.
Fabricon Ltd, Leighton Buzzard.
Esso Fuels, Avonmouth, Bristol.
Federal Signals, U.S.A.
Southern Electric, Bristol.
Inveresk GP (Georgia pacific, Scotland)
Work History
2015-Currently ongoing
Site manager on £8m 4 acre site on outskirts of Frome, Somerset, This is a new build project and on completion will be an ink factory relocating from smaller premises.
2014-2015
The Cherrington Farm restoration refurbishment.
A large scale Grade two listed farmhouse with various outbuildings and stables, Approximate project value was £810.000.
The project was made very difficult by the simple fact the property was in a very dilapidated condition and had most of its oak timbers devastated by Death Watch Beetle.
The high standard of work was performed and completed on time by a staff of 20 personnel with myself as Site manager, Together we produced a stunning end result leaving the customer delighted and offering glowing praise.
2013-2014
The Georgian Lodge Hotel, Formally known as the Georgian Wine Lodge, Bradford-on-Avon, Wiltshire.
This was a large scale refurbishment of a former hotel converted into 8 luxury flats and an office, The building is a Grade 2 listed property, A very difficult building that was literally falling apart.
This site was located right in the heart of the town making parking and deliveries very difficult if not impossible, However all staff and myself as Site manager were highly appraised for completing the works on time.
The following projects are contracts that we either organized, supervised, designed and built or played a major role in:
Redcliffe Bay Oil Terminal – deep drainage scheme of one mile
Bristol Airport Silver Zone – departure lounge refurbishment
St Cuthbert’s Paper Mill – 8 year factory rebuild
Bristol Broadmead Shopping Centre – foundations for high mast illumination
Weston-Super-Mare – sea wall defence works
Mendip Hospital – reroofing to mendip view main wing
The Severn Siren System (Design and build, civil engineering)
Hallen Oil Terminal – precarious heavy duty deep drainage works
Royal United Hospital – Demolition of 6 main wards
Royal United Hospital – complete refurbishment of x-ray department
Westland Airport, Yeovil- new roofs to helisheds
Sexeys School, Bruton – fit out new science block
£8m chemical factory new build – Somerset
Bruton High Street r.c. – road retaining works
Avonmouth Oil Terminal – large r.c. foundations for high mast lighting
Bradford On Avon – hotel conversion to 9 luxury flats
Boots Chemist, Warminster – new r.c. stair works and mezzanine
I am a Highly ambitious confident individual with the sole purpose of delivering results in the workplace and that statement can be supported by many successful projects spanning the Length and Width of Great Britain and by Glowing References.