Profile
Senior Civil Structural/Technical Engineer B.Sc., M.Sc., PMP, FIDIC,BIM with 15 years experience structural analysis / design, site technical work, precast work and building material testing and also in tendering and FEED works stages.
Qualifications
Master’s Degree in Strength of Material in Civil Engineering, Egypt (2004).
Bachelor of Civil Engineering (AAST-Egypt) (2000), V. Good (G.P.A. 3.34).
Skills & Strengths
• Efficient Management and Leadership ability.
• Expertise with latest tools and methodologies of professional construction and execution.
• Outstanding coordination between stake holders.
• Expert in various Civil Eng. software packages in structural analysis / design and with enough experience in project management tools.
• BIM methodologies cost modeling.
• Excellent Time Management to finish the work scheduled on Time.
IT Skills
• SAP2000, SAFE, Etabs, MIDAS, Prokon, and specific spreadsheet, also Primavera tools, BIM methodology packages as D-Profiler and Revit.
Senior Civil Structural/Technical Engineer B.Sc., M.Sc., PMP, FIDIC,BIM with 15 years experience structural analysis / design, site technical work, precast work and building material testing and also in tendering and FEED works stages.
Career Summary
Arabtec Saudi Arabia-Jeddah
Sr. Technical Engineer
Dec., 2009 – Till Date
Project: EPC of Lamar Towers (2B+G+70 stories).
Responsibilities:
Construction stage:
• Reviewing all structure design works in the project as per BS8110/ACI codes and their correspondences.
• Production for all workshop drawings, and managing staff of about 12 Engineers and draughtsman in the department, plus about 20 total staff for external subcontractors.
• Coordination between architectural, structural and MEP design and issuing RFI for design discrepancies.
• Technical coordination with nominated subcontractors for all their structural requirement and embedded items.
• Field assistance and technical supervision of all structural site activities.
Tender / FEED Stage:
• Studying tender documents and preparing necessary forms as project brief, GO/NO GO Form for the top management to decide.
• Preparing the responsibility matrix for all project stake holders including Arabtec team in KSA or U.A.E or with its subsidiaries and others like Consultants in case of Design/Build projects.
• Preparing required project site facilities, offices, temporary logistics for staff and labors.
• Planning for project Construction methodology.
• Preparing expected site organization chart and staff program as per project/client requirements on monthly basis.
• Preparing Manpower histogram on monthly basis.
• Preparing Plant/Machinery/Vehicles requirements during construction as per preliminary program of work prepared by the planer.
• Preparing Quality plan of deliverables as per Arabtec/Client standards.
• Preparing HSE plan based on project type and location level of hazards.
• Coordination between bidding stage stake holders for their project technical requirements and site instructions.
• Contract conditions review.
• Raising necessary RFI to consultant/client in the relevant above subjects.
• Checking samples and materials to be used in the project.
• Reviewing all deliverables from all stake holders then compile and pack them for tender submission on time.
• Negotiation with client post to tender stage.
Sultan Group for Investments -Dubai
Project Engineer /Client Representative In-charge
Jan., 2009 – Dec., 2009.
Project: Al-Memzar Tower (1B+G+3P+18 stories) EPC of in-house project
Responsibilities:
Monitoring and following up the construction process and method of statement for each venue.
Solving all design/construction issues related to the project.
Management of the daily coordination related to the project.
Controlling material approval and procurement process.
Following up technical assessments for claims and variations (Time and cost).
Verify quantities of executed work in invoices comparing with the monthly progress estimate for payment to the contractor.
Identifying the best construction implementation method including solutions and materials.
Representing SULTAN GROUP in Site Progress meetings, Coordination technical meetings and Program review meetings with consultants, contractors, sub contractors and governmental agencies to facilitate the construction progress and solve any conflicts.
Supervising, inspecting and reviewing the implemented works to ensure compliance with the project specification and general requirements within the most economical ways.
Monitoring and reviewing the construction program and maintain periodic accurate reporting to management (monthly & weekly progress analysis/schedules, invoices, and status reports).
Ensure compliance with contract requirements.
Arif & Bintoak Consultant Office – Dubai
Senior Structure Engineer /Coordinator
June, 2008 – Jan., 2009.
Project: Various High-rise buildings and Golf complex
Responsibilities:
Structure analysis and design of concrete and steel structures.
Manage approvals of analysis and design calculations from DM engineers.
Supervise construction works on site according to the approved drawings, method statements & specifications and within the specified budget & time schedule.
Give all support needed for subcontractors in accordance to their contract.
Peer review of designs and monitor construction to comply with client requirements.
Direct responsibility for the design stage.
Involved in Value engineering related to design criteria, and structural system selection for buildings.
Barajeel Consultant Office -Dubai
Senior Structure Engineer
April, 2007 – May, 2008
Project: Various High-rise buildings.
Responsibilities:
Developing conceptual design.
Producing design drawings, specifications and reports.
Preparing designs and managing the preparation by others of drawings for scheme, feasibility and detailed design packages,
Undertaking site visits for surveys and inspections
Coordinating drawings and designs.
Al Hamad Group (D.C.E) – Concrete Technology – Jebel Ali-Dubai
Production Engineer/Manager In-charge
Jan., 2006 – April, 2007
Project: Various High-rise buildings/Villas Precast claddings.
Responsibilities:
Responsible for planning, production of precast products, co-ordination with design and Q.C. department and reporting to the General Manager.
Supervising precast produced elements to comply with the shop drawings issued from design section.
Follow up site work during erection phases.
Join meetings with clients, sub contractors and main contractors to solve problems at site.
Qena Cement Factory, EGYPT
Technical Support Engineer
Aug., 2002 – Dec., 2005
Responsibilities:
Responsible for technical support and Quality control of the product in Egypt.
Supervising product with contractors for the quality of concrete and cement technical tests successful (compressive strength and slump test).
Follow up of undertaking laboratory tests and submission to consultant and contractor.
Certified for Physical and Mechanical testing of all Cements types.
Horse Construction Company, EGYPT
Site Engineer: Responsible for construction of water treatment plant project & reporting to the project manager.
April, 2002 – Aug., 2002
Wisers Consultant Office, EGYPT
Design Engineer :Responsible for design of RC/Steel works in resorts in sharm AL Sheikh.
Sep. 2000- Feb., 2002
Certifications & Courses
(BIM) Building Information Modeling- Cost Modeling on D-Profiler software-USA.
(PMP) Project Management Professional course-KSA.
Primavera Project Management (American University in Cairo)-Egypt.
Physical, Mechanical and chemical test Analysis for Cement course in the Housing & Building National Research Centre – Egypt.
“Methods of disputes resolution and the impact of implantation of “FIDIC” terms & conditions” course in Contractor’s Association-Dubai.
“Causes of project delays and disputes in Civil engineering projects and method of avoiding them ” course in Contractor’s Association-Dubai.
“Methods of handing over the project on time” course in Contractor’s Association-Dubai.
Certified unlimited high rise buildings Engineer