CV, UAE based Electrical Engineer

Unavailable
Serial No: 17239
Skills keywords: autocad and microstation, planning and execution, testing and commissioning
Current location:  Abu Dhabi, United Arab Emirates - View on map
Nationality: Filipino
Spoken languages: english

Qualifications

CENTRAL PHILIPPINE UNIVERSITY
1992 – 1997
Bachelor of Science in Electrical Engineering

Accredited Level III by the Philippine Accrediting Association of Schools, Colleges and Universities (PAASCU) and Commission on Higher Education (CHED).

Career Summary

Electrical Engineer
HABTOOR LEIGHTON GROUP (HLG), Offshore
Abu Dhabi, United Arab Emirates
2014 – Present

Zakum Development Company (ZADCO), Upper Zakum 750K Project, North Island.

 Temporary camp facility administrator – installation, operation and maintenance of Sea Water Reverse Osmosis Plant, Sewage Treatment Plant and Camp Power and Auxiliary Systems.

 Factory Acceptance Test/Inspection of Temporary Harbor House, SWRO and STP and observed operation, to ensure conformance to design, control philosophy and equipment specifications.

 Preparation of Material Take Off, installation and testing of Cathodic Protection Systems for permanent utility plants foundations.

 Development of Job Safety Analysis and Method Statements for Work Permits.

 Preparation of progress reports and employed miscellaneous software to establish statistical data, periodical graphs, charts and trends.

SPECIALIZED INDUSTRIAL SERVICES COMPANY (SISCO) Support Services Department
Jubail, Saudi Arabia
2009 – 2013

Supplied as:

Pre-Commissioning Supervisor
SNAMPROGETTI SAUDI ARABIA LTD.
January 2012 – Present

Saudi Aramco Manifa Core Hydrocarbon Facilities Project.

 Supervision of inspection, testing, pre-commissioning of MV and LV Motors with their associated MCC’s, LCS and communication.

 Preparation, troubleshooting and modification of motor control circuits, relays (GE MM300, SEL-710)

and logic prior to Integrated Site Acceptance Tests and Solo Run.

 Coordination, reporting and documentation of equipment inspection and test results, work progress and schedule.

 Requisition of materials and replacement parts of equipment required subject for repair and modification.

Electrical Engineer
PETROFAC SAUDI ARABIA LTD.
June 2011 – December 2012

Karan Utilities & Co-generation Project – A Saudi Aramco Karan Gas Expansion Program.

 Coordination for the completion of construction activities in assigned systems to ensure the readiness of systems for release for turn-over to the client or for start-up.

 Monitors subcontractor’s performance to ensure conformance to project quality, safety, security, and specification requirements.

 Close Liaison with project QA/QC department and ensuring that all works carried out are in compliance with project QA/QC standards.

 Preparation of progress reports and employed miscellaneous software to establish statistical data, periodical graphs and charts.

 Installation, testing and pre-commissioning of medium voltage motor/motor controller (water well), lighting, power and grounding systems in pipeline block valve stations.

 Installation, testing and pre-commissioning of Cathodic Protection System for pipeline (40”, 47 km).

 Pole erection, dressing, stringing and service connection of 3-kilometer, 13.8 kV overhead power line.

 Preparation of MTO, installation details, shop drawings, interconnection diagrams and cable schdule.

 Preparation of marked up drawings and as-built (using AutoCad, MicroStation).

 Cable pulling (150,000 meters in three months) and service connection of field equipment.

 Saudi Aramco certified Permit Receiver (cold, hot, confined space and gas release).

Electrical Engineer
YUKSEL INSAAT, SAUDIA
Sept. 2009 – June 2011

SWCC Eastern Province Water Transmission System Phase II. A 120-kM pipeline project with twelve BlendingStations and a pumping station with a capacity of 500,000 m3 per day.

 Installation to pre-commissioning of Transformers, MV/LV Switchgears, Motors and Motor Starters; Lighting, Power, Auxiliary and Grounding/Lightning Arrester Systems.

 Material Take Off, Estimates and Panel Drawings/Specifications for Lighting, Small Power, Cathodic

Protection (CP) and HVAC Systems.

 Preparation of Cable Lists/Schedule and directly supervised the cabling for systems (PACU, CP, Fire

Fighting, Lighting and Small Power) not covered by sub-contractors.

 Installation, monitoring and pre-commissioning of Cathodic Protection for pipeline, tanks and station piping.

 Preparation of Drawing Revision Notices (DRN), Field Design Changes (FDC) and As-built drawings (using

AutoCAD).

 Inspection of completed installations and observed operation, to ensure conformance to design and

equipment specifications and compliance with operational and safety standards.

 Coordination to various disciplines for any conflict in the field, and construction QC to resolve any outstanding issues.

 Site walk-through/inspections to review the work for conformance with the design drawings, applicable codes/standards and company policies/procedures.

 Addressed Technical Queries from sub-contractors.

 Cleared Punch Lists as scheduled with limited number manpower and skills.

 Passed the panel interview and examination of SWCC for Authorized Person.

CONSOLIDATED CONTRACTORS COMPANY (CCC)
Ras Laffan, Qatar
2007 – 2009
Electrical Engineer

Qatargas Expansion II (QGX II) Project. An LNG plant having a capacity of 7.8 million tons per year, with Chiyoda-Technip Joint Venture (CTJV) as the main contractor.

 Installation of Lighting, Power, Heat Trace, Cathodic Protection and Grounding Systems in Process Area. Works includes, but not limited to: Cable Trays, Fixtures, Devices, Panels, Cabling, Termination and Testing. Area includes, but not limited to: ITR’s, VFD’s, Sub stations, Main Pipe racks, Sub Pipe racks, Columns, Vessels, Compressor Shelters

 Cabling, termination, service connection and other works related to the following panels prior to commissioning : Medium Voltage Switchboards, Low Voltage Distribution Panel, Skirt Heating Panel, HVAC Panel, HVAC Control Panel, Transformer Cabinet, UPS Power Distribution Panel, Lighting Panel, UPS AC 120V-60KVA Panel, DC Charger Panel, CCTV Cabinet, Telecom Cabinet, PA/GA Cabinet.

 Coordination to various disciplines for any conflict in the field, and construction QC to resolve any outstanding issues.

 Preparation of progress reports and employed miscellaneous software to establish statistical data, periodical graphs and charts.

 Site walk-through/inspections to review the work for conformance with the design drawings, applicable codes/standards and company policies/procedures.

 Planning and execution of construction work in the field.

SOLUTIONS GROUP INTERNATIONAL
Makati City, Philippines
2006 – 2007
Electrical Engineer

 Preparation and review of technical drawings, specifications of electrical systems, layouts to ensure that installation and operations conform to standards and customer requirements.

 Oversee project production efforts to assure projects will be completed satisfactorily, on time and within budget.

 Modification of plans and layout if conflicts are anticipated in the plan.

 Material documentation, writing reports and giving presentations.

 Design of power, lighting and auxiliary systems for various projects.

 Supervision of roughing and installation of power, lighting and auxiliary systems.

 Drafting of electrical plans using AutoCAD.

 Researched for prospective projects local and abroad.

PROPOSED DELA CALZADA BUILDING
Digos City, Philippines
2005 – 2006
Project Engineer

 Design and drafting of plan of power, lighting and auxiliary systems.

 Supervision of roughing and installation of power, lighting and auxiliary systems.

 Rectification works that were not in accordance with the Philippine Electrical Code.

FERRO STEEL, INCORPORATED
Davao City, Philippines
2004 – 2005
Maintenance Engineer

 Supervision of cabling, termination and other works related to the following panels prior to service: Wye-Delta Start up Motor Control Cabinet, Series Resistance Start up Motor Control, PLC Control Panel, Overhead Crane Motor Control Panel.

 Preparation of maintenance schedules.

 Troubleshooting of PLC’s input/output devices, motors, motor control and supplies.

 Daily Preventive Maintenance in substation, power panels and controls.

NAKAYAMA TECHNOLOGY CORPORATION
Digos City, Philippines
2003 – 2004
Designer

 Edited graphic images of commercial buildings/residential houses and changed their attributes according to order specifications.

 Estimated number of panels, studs, runners and accessories in an order specification.

 Software used: AutoCAD 2000 and MicroStation.

AL GIHAZ COMPANY LIMITED
Riyadh, Saudi Arabia
1999 – 2001
Subcontractor of Saudi Electric Company (SEC formerly SCECO) for Transmission and Distribution Lines (overhead and underground) and Substation Projects.
Site Engineer

 Roughing, installation, cabling and service connection of Substation Transformers, Pole- mounted Transformers, Switchgears, Distribution Panels

 Erection, dressing and stringing of overhead transmission/distribution lines.

 Studied and wrote proposals answering vital field problems.

 Evaluation of daily progress reports and employed miscellaneous software to establish statistical data, periodical graphs and charts.

 Authored the first incentive program for the Southern Region, thereby, increasing the area productivity by a significant Lgure.

JFS ENGINEERING SERVICES
Davao City, Philippines
1997 – 1999
Site Supervisor

Marco Polo Hotel Project. A 24-Story, Four-Star Hotel.

 Roughing and installation of lighting, power, and auxiliary systems. Works include but not limited to: Substation Transformer, Switchgear, Main Distribution Panels, Transfer Switches, Feeder/Sub feeder Conductors and conduits, Motor control Panel, Motors, Generators, PABX, PA, CATV, CCTV.

 Took charge of Sub contractors.

 

 

 






popup-img