ualifications
B.E., Instrumentation & Control Engineering
University of Madras, Tamilnadu
June 1996 – May 2000
Career Summary
Selection, FEED study, detailed design and follow-on engineering and then closeout
Bachelor of Engineering degree in Instrumentation and Control Engineering
Fifteen Years (15) of real-time experience in handling OFFSHORE / ONSHORE Oil & Gas plant, Refinery and Petrochemical industries Instrumentation, automation and F&G Detailed design engineering, Construction and Commissioning.
Proven Results in various Engineering Projects and preparing documents and detailed design drawings based on international standards Shell DEP’s, PETRONAS PTS, ISA, IEEE, IEC, EN ISO, API, NORSOK, NFPA 72, BS Standards, etc.
Interacts with other department disciplines / organizations, high quality, cost effective designs and reports in a timely manner.
Engineering practice for project concept
Position: Lead Design Engineer – Instrumentation
CEGELEC Oil & GAS subsidiary of VINCI Energies, France ABU DHABI, UAE
Client: Gasco – Abudhabi Gas Industries, Abudhabi.
(Cegelec – Sep’13 to Presents Project based contract job)
Role:
– Lead the Department (GASCO Prosafe PLC Up gradation and PST implementation project).
– Preparing with Engineering deliverables and Detailed Design Engineering drawings
– Co-ordination with system vendor.
– Preparing Specifications, Datasheets, Technical Bid Evaluation, Requisitions, Drawings, Etc…
– Procurement and Construction supports.
– QA/QC, Etc
Position: Senior Control & Automation Design Engineer (Lead)
MMC/SPIE OIL & GAS SERVICES MALAYSIA, MIRI, SARAWAK,
Client: SHELL Malaysia Exploration and Production & PETRONAS CARIGALI MALAYSIA.
(SPIE / MMC – Jan’12 to June 2013 1 year Contract Job and extend 7 more months)
Role:
– Working as Sr. Control & Automation Engineer (Lead the department)
– Preparing estimations (Man-hours) based on client requirements.
– HAZOP participation and implementations.
– Various SHELL / PETRONAS CARIGALI offshore (drilling, well head, production) platforms E11, F6, F23, F13, D35 & D18, BCOT, MLNG, BARAM, Etc implementations & Modifications.
– Preparing Scope of Work ( HUC, DCS, F&G, GPA), I/O List, LLM (Long Lead Materials) Specs
– Detailed Design Drawings ( Schedule, Installation, Termination, cable/tray routing, block diagram, signal diagram, loop diagram, name plate, etc)
Position: Senior Instrumentation Engineer
PETROFAC ENGINEERING SERVICES INDIA PVT LTD, Chennai
Client: SHELL IRAQ PETROLEUM DEVELOPMENT B.V.
(Petrofac – Apr’11 to Dec’11 Project based contract job)
Role:
• Senior Engineer Instrumentation – Completion
• Involving with early production facilities, Majnoon, Southern Iraq
• Preparing Instrumentation and F&G Pre-Commissioning and Commissioning, Plant start-up Procedure.
Position: Senior Instrumentation Engineer
TEKNICA UK LTD and SIRTE OIL COMPANY, Libya
EPC: ILF German & Punj Lloyd Delhi, India
(SOC – Apr’ 2009 to Apr’ 2011 Long time Contract job, due to inter country issue I left the job)
Role:
• Sr. Instrumentation – PMC role with clients
• 34” Gas Transmission pipeline and Melita compression facilities project instrumentation & automation Design and Detailed Engineering co-ordination with ILF German company
• ABB(Italy) automation hardware and DCS FLD checking & approval
• ESD cause and effect matrix chart preparation
• Hazards & SIL Classifications and applications checking
• Field Instruments & valves Material verifications and approvals
• QA/QC inspections
Position: Asst. Manager in E & I Design Team.
SAMSUNG Heavy Industries Co Ltd, Geoje, South Korea – FLEX LNGP FPSO Project
FPSO Owner – FLEX, Norway
(SHI – Aug’ 08 to Mar’ 09 Contract job)
Worked as a Assistant Manager in E & I Design Team in Project is World first LNG FPSO Project and Shipbuilding design
Role:
• Microstation soft tools for preparing Instruments loop diagram.
• Fire & Gas and ESD cause and effect preparation
• Project SIL classifications Verification and applications
• PSD, Control Logic preparation
• Instrument Cable diagram
Position: Sr. Instrumentation Engineer.
SNAMPROGETTI, Abu Dhabi GAS Industries 3rd NGL Project, Ruwais, UAE
Company : GASCO – Abu Dhabi GAS Industries Company Ltd
Consultant : Foster Wheeler Company, UK
(SNAMPROGETTI – Sept 2007 to Aug 2008 1 year contract job)
Role:
• Detailed engineering (Hook-Up, Tray routing, Tagging, Data sheets)
• Field Instrument Constructions & Modifications
• DCS, ESD and F&G system executions
• Materials Inspection and control panels testing
• Analyzers Installation and Calibrations
• Plant start-up and Commissioning
Position: Instrumentation Engineer.
CCIC, Qatar GAS II LNG Project, QATAR
Client : Qatar GAS
EPC : CTJV – Chiyodha Technip Joint Venture
(CCC – July 2006 to July 2007 1 year contract job)
Role:
• Electrical GIS Sup Station Erection & Commissioning including transformers
• DeltaV Emersson Process Management Automation Co-Ordination
• QA/QC (Inspections of Electrical & Instrumentation jobs)
• Project E &I and Team Management
• Offsite Project Execution and Site modification
• Sub Station GIS Panel erection & commissioning
Position: Instrumentation Engineer (acting Lead).
Mansoura for Resins and Chemicals Industries Co, Egypt
(MRI – Jan 2006 to July 2006 permanent, but personnel reason I left the job)
Role:
• Plant Maintenance and operations
• Field Bus DCS system engineer (DeltaV Emersson Process Management System)
• Analyzer commissioning & maintenance
Position: Instrumentation Engineer consultant.
Praxair India Pvt Ltd, Air Separation Unit, Kashipur, Uttaranchal
Company : India Glycols Limited, Kashipur, Uttaranchal.
(Praxair – July 2005 to Jan 2006 1 year project based contract job)
Role:
• Plant Instrumentations and ACS Engineer
• Plant and Panel Commissioning
• Analyzer commissioning & maintenance
• Calibration In-Charge
VA Tech Wabag Ltd, Common Effluent Treatment Plant at SIPCOT Industrial Growth Centre, Perundurai
Client : Central Leather Research Institute, Chennai
(VA Tech – August 2004 to June 2005)
Role:
• Plant Electrical & Instrumentation Erection
• Calibration & start ups.
• Plant Commissioning
Position: Instrumentation Engineer.
Indian Oil Corporation Limited, Mathura Refinery, Mathura, Uttar Pradesh
Client : Larsen & Toubro Limited
(Galaxy – July 2003 to May 2004 Long time contract job)
Role:
• MSQ Unit (Motor Up gradation) project
• P & I Diagram analysis.
• Constructions
Position: Instrumentation Engineer.
Make Up Gas Compressor Refinery III, Manali
Client : SG Electrical and Instrumentation Private Limited
(Galaxy – July 2001 to February 2003 Long time contract job)
Role:
• Supervising
• Construction and erections
• Calibration checking, etc.
Position: Instrumentation Engineer.
Oil and Natural Gas Corporation Ltd, Kuthalam, Tamil Nadu
Client : ONGC & N.R.Patel & Co, Chennai.
(Galaxy – July 2000 to June 2001 Long time contract job)
Role:
• Supervising
• Constructions and erections with Team.
• Calibration checking.