Education and Qualifications
B.E in Mechanical Engineering (2008)
NACE Coating Inspector Level – 2: Cert. No. 27278
CSWIP 3.1 Welding Inspector Level – 2: Cert. No. 58599
Experience
QA-QC Engineer (Subcontracts, Site) ( May 2012 to October 2014)
AL REYAMI STEEL, DUBAI, UAE
Structural Steel Engineering
Company involved in design, fabrication, erection of structural steelwork for oil and gas, petrochemical, power and water, commercial and industrial sectors in the middle east
• Preparing quality control documentation as per project requirement.
• Review of Inspection test plan prior to start of project
• Raw Material Inspection and ensuring traceability as per project requirement.
• Preparing WPS/PQR
• Review of coating manufacturers certificate and products
• Coordinating and monitoring the execution of survey/torquing activities at site
• Preparing of site work method statements
• Conducting Welder qualification tests
• Conducting periodic internal audits
• On field welding and coating inspection and surveillance
• Ensuring all welding processes are adhering to the approved WPS
• Ensuring that all welding personnel on a project are qualified as per that project’s requirements.
• Carrying out the final visual inspection & reviewing of NDT test reports.
• Inspection of material surface preparation as per coating specification
• Ensuring pot life, sweat-in time and blasting to coating application start times are as per specification
• Monitoring QC inspectors involved in line checking, regarding completion of weld summary sheets, NDT requirement, mark-up drawings, and as-built drawings as per project requirement.
• Subcontractor/Vendor inspection and co-ordination
• Co-ordination with internal and external auditors
• Work in liaison with third-party / client quality personnel
Major Projects
KAFD MEGA ROOF PROJECT – STEEL, RIYADH (SITE) (Client- Permasteelisa Gartner / RIC)
AL AIN – HAZZA BIN ZAYED STADIUM (SITE) (Client-Bam International /EC Harris /Aafaq)
Quality Control Engineer (March 2009- April 2012)
CLEVELAND BRIDGE ENGINEERING M.E, DUBAI
Structural Steel Engineering
• Review of Inspection test plan prior to start of project
• Raw Material Inspection and ensuring traceability as per project requirement.
• Co-ordinate day to day activities and combined line check with QC inspector.
• Inspection of welding consumables and equipment monitoring.
• Review of coating manufacturers certificate and products
• Coordinating a quality control team as per project requirement
• On field welding and coating inspection and surveillance
• Ensuring all welding processes are adhering to the approved WPS
• Ensuring that all welding personnel on a project are qualified as per that project’s requirements.
• Co-ordination of NDT, PWHT and other testing activities with the relevant approved personnel.
• Carrying out the final visual inspection & reviewing of NDT test reports.
• Witnessing & Reviewing the PWHT tests and reports.
• Inspection of material surface preparation as per coating specification
• Ensuring pot life, sweat-in time and blasting to coating application start times are as per specification
• Ensuring personnel involved in production/quality activities are qualified/certified/approved by client
• Monitoring QC inspectors involved in line checking, regarding completion of weld summary sheets, NDT requirement, mark-up drawings, and as-built drawings as per project requirement.
• Ensuring instruments used in production/quality control are approved and in calibrated state and maintaining calibration register.
• Providing information to production personnel about project procedures and acceptability criteria
• Co-ordination with internal and external auditors and client representatives
Technical Engineer (production, assembly and shipping) (Sep 2008- Nov 2008)
INTERMOBILI S.R.L, ITALY
Consumer Durables
• Coordinating of day to day production activity with the production manager and work supervisors
• Ensuring the daily work plan is executed with all priorities
• Control and record of raw material required to meet daily/weekly/monthly production targets
• Management of inventory
• Establishment of a storage plan to ensure smooth logistic activities
• Ensuring that all materials in the logistic request are prioritized in production as per the planned delivery requirement
• Ensuring all logistics documents are in place
• Updating inventory in real time
• Issue of production/procurement requests in case of forecast of shortage
• Visiting suppliers for update on newer raw materials and machinery and submitting report to management team for review