Career History
January 2013 Exxon Neftegas – Chayvo – Sakhalin Is. Russia – SD Coordinator – Kentz / Dovre
October 2014 • Shutdown Planning and execution for all Onshore Production and Processing Facilities.
• Start Up & Operations Support – work with National Operations Group
• 260,000 BPD Oil / 800-mmscf/d Gas; Produced Water Injection; Gas Injection; Frame 5
Turbine Driven Centrifugal Compressors (Inj. and Sales gas); GE Frame 6 Turbine
Generators; De-Salter Units; Centrifugal & Screw (VRU); TEG and EG Dehydration.
• Shutdown Planning and execution for the Well Site 4 Gas Injection; 1 Disposal; 21 Oil Wells
Chemical Injection; Test Separator and Blow Down vessels
• PSSR walk downs, Commissioning and Start Up Support for Well Site expansions
October 2011 Sonatrack – Skikda Algeria – New LNG Plant – Operations Supervisor
December 2012 • Operations Shift Supervisor
• Pre-Commission / Commissioning Supervisor (Utilities and Off Site’s)
• Troubleshoot & Start Up for Utilities and continued Train & Frac Commissioning Activities
• Pre-commissioning & Operational Procedure Writing
• Utilities & Off-Sites Commissioning Superintendent Stand In
May 2009 DowCorning – Zhangjiagang, China – Siloxane Facility – Construction,
February 2011 Commissioning and Start Up Engineer – KBR / SEII
• Development, Planning and Supervising of the 10 Distillation Towers Tray Installations
• Lead Joint Walk Downs & appointed Punch Killing Coordinator for Construction Teams
• Commission and Start up of the Distillation Process Systems & Procedure Writing
• Commissioning Coordinator and Start up of Phoenix Reactor & Process Systems
• Start up and Engineering design modifications for Hoffer Hydrogen compressors
• Troubleshoot expert for site refrigeration systems
July 2008 OXY – Mukhaizna Oman Heavy Oil Project – Start Up Lead Operations Tech.
February 2009 • DCS and Process Troubleshooting Support; DCS Operators Competency Assessments
• Water Evaporation Trains Commissioning and Start Up Support
• Aid in the Development of the Operations Assessment Program
• Start Up & Shutdown Procedure editing
Sept. 2007 Qatar Gas – QGII LNG Project Expansion – Ras-Laffan, Qatar – Lead OJT – LA
June 2008 Recruitment
• On Job Training Instructor for Inlet Reception
• Developed Assessment Guidelines for Operations, Mechanical, Electrical & Instrument
Technicians for Competency Assurance Program
• Conducted Operator Procedural Assessments and Gap Analysis
• Appointed Lead OJT – All disciplines of QG II & Refinery – 35 OJT Staff
Sept. 2006 Exxon Neftegas – Sakhalin Island Russia – Ops Technician / Specialist (Dovre)
May 2007 • Commissioning, Start Up & Operations Support on DCS & Process
• On Job Training and Mentoring of Nationals
• 250,000 BPD Oil / 800-mmscf/d Gas; Produced Water Injection; Gas Injection; Frame 5
Turbine Driven Centrifugal Compressors; GE Frame 6 Turbine Generators; UV Water
Treatment; Fire Water Deluge Systems. JT for NGL Separation; De-Salter Units c/w Treated
Water Wash; Centrifugal & Screw Compressors for Vapour Recovery; TEG and EG Dehy.
Sept. 2005 PetroChina – Sumatra Indonesia – Betara Gas & Liquids – Operations Specialist
July 2006 • Commissioning, Start Up & Operations On Job Training and Mentoring
• Training Nationals on DCS, PLC & Process
• Start Up and Operating Procedure Writing
• aMDEA Amine System; Turbo Expander; Mole Sieve; Co2 Removal Membranes & Oxydizers; 23,000 BPD Inlet & Expander Liquid Production; 240 mmscf/d Inlet; Turbine Power Generation; Turbine Driven Centrifugal Compressors
2003 – 2005 Airborne Energy Solutions – Remote Operations Lead – Helicopter Assisted Operations
• DCS & SCADA Panel Operator; MDEA & Glycol Dehydration Plants & Pigging Operations
• Commissioning & Start-up of the Duke Tooga Facilities Amine Unit
• Remote fly in Sour Oil and Gas Wells, CSG Gas Driven Pump Jacks
2001 – 2003 Apache Canada – Zama & Hamburg Chinchaga Sour Gas Facility Operations- (Remote)
• Commission, Start up & Operations Lead of 6 x 130 mmscf/d Amine Sweetening Plants
• Constructed DCS Graphics for Process Monitoring & Operations Training
• Lead DCS Panel Operator – Hamburg Sour Gas Facility
• Refrigeration; Acid Gas Injection; Clause Sulphur Plant, Fractionation, Stabilization &
Pressure Bullet Storage
1997 – 2001 Westcoast Gas Services Inc. – DCS Lead Operator / Safety Coordinator – (Remote)
• Construction, Commissioning, Start-up and Operations Lead of the Gas and Liquids Facility
• Undertook Budgeting and Purchasing of Plant Tools and Safety Equipment
• Development of Emergency Response, Environmental & Personnel Training Plans
• DCS Set Up Configuration and Constructed Graphics for Start-up & Training
• Refrigeration, Fractionation, Stabilization; High Pressure Storage and Loading Facilities
• Saturn T-1300 (900 kW) Solar Turbine Power Generators
• Centaur 40-T4500 Solar Turbine Sales Compressors
1990 – 1997 Chevron Canada Resources – Medicine Lodge Sour Gas Facility – Process Operator
1989 – 1990 AMOCO – Granada Facility – Contract Operations and Maintenance
Suncor Inc. – Rosevear Sour Gas Facility – Contract Operations
1982 – 1988 Suncor Inc. – Rosevear Sour Gas Facility – Contract Operations
Suncor Inc. – Killam & Malmo New Norway Facilities – Operations and Maintenance
Suncor Inc. – Fort MacMurray Oil Sands Refinery – Extraction Plant
• Emergency Response & Preparedness Planning • St. John’s First Aid & CPR
• Emergency Medical Responder (Past) • Confined Space Rescue
• Transportation Dangerous Goods Handling • Radiation Safety & Awareness
• Automated External Defibrillator (AED Heart Starter) • Oil & Gas Fire Fighting • W.H.M.I.S. • Asbestosis • H2S Alive • Desert Driving • Incident Command System Training (100, 200 & 300) • Russian Driver Training (PKT)
• Russian (RTN) Training
EDUCATION
• Parkland Composite High School, Alberta Diploma Attained 1979 – 1982
• Power Engineering Certificate (4th Class) Certification 1991 – 1992