Profile
I have more than 15 years of experience in the field of Civil Engineering on various projects in Construction of Power Plants (Combined Cycle Power Plant), QA/QC, Documentation (Project Quality Plan, Inspection & Testing Plan etc.) 220KV Switchyard & Switchyard Control Building, Railway Lines, Gold Mining, Testing of Piles Buildings, Making of Progress Reports (Daily, Weekly, Monthly) Earthquake Resistant Buildings, HVAC Systems, Infrastructure Works, Roads (Asphalt) Handling of Sub-Contractors, Irrigation and Water Resource sector, Storm Water System, Bridges, construction Supervision, Estimation, Surveying, Material Testing, Dams, Construction Quality Documentation Audit, Documents Reviewing and practical experience of working in accordance with International con8tract conditions, specifications, Schedule of Rates and Contractor’s bill verifications. Worked on mass concrete pouring reinforcement fixing, concrete testing, brick testing, hydro pressure test of C.I. & G.I. pipes, High pressure testing of Steam lines, earth compaction tests, water proofing etc. Also working as HSE Engineer.
Education & Profession Status
B. Tech (Honors) Civil Engineering Preston University, Islamabad
DIPLOMA OF ASSOCIATE ENGINEER Government College of Technology Rasul
(CIVIL TECHNOLOGY) Mandi Baha ud Din, Punjab, Pakistan
IT Knowledge
Microsoft Office 2010 (MS Word, MS Excel, MS Power Point, MS Excess)
Internet surfing
Career Experience
June, 2015 to Date
Ma’aden Gold and Base Metals. KSA
Working as Civil Engineer at Sukhaybarat & Bulghah Gold Mines located in Madina Al Munawwarah Province
Location Sukhaybarat and Bulghah Gold Mines
April 2014 to March, 2015
Al Mobty Contracting Company, KSA
Worked as a Construction Manager at the construction of Riyadh Empty Container Yard Project at Riyadh (Capacity, 20,000 Containers)
Project Cost: 96 Million Saudi Riyals
Client: Saudi Railway Organization (SRO)
Consultants: Saudi Consolidated Engineering Consultants (SCEC, Khatib & Alalmi)
October 2011 to March 2014
URS Corporation USA.
Working as a Lead Civil Engineer on Uch-2 404 Mega Watt Combined Circle Power Plant (CCPP) Gas Fired Power Project located in Dera Murad Jamali province of Baluchistan.
Total Cost of the Project is US $481 Million.
Client GDF- Suez (UCH-2 Power Plant)
Contractors (EPC Contractors) Hyundai Engineering Ltd. & Descon Engineering Ltd.
Duties included:
As a Lead Civil ENGINEER, Execution, Quantity Surveying,
QA/QC Documentation (Project Quality Plan, Inspection & Testing Plan etc.)
All construction activities like Gas Turbine Generators, Transformers, Heat Recovery Steam Generators, Steam Turbine Generators, Cooling Tower, Raw Water Pond (Capacity 1 Million Cubic Meters), Evaporation Pond, Central Control Room Building, Switch Yard, Switch Yard Control Building, Sub-Stations, Clarifiers for Raw Water & Waste Water, Water Treatment System for Raw Water & Waste Water Treatment System etc.
Audits of Construction Quality Documents. Quality Audit of Housing compound.
Managing all Civil Construction Activities at site.
January 2009 to October 2011
CDMSMITH CONSTRUCTORS INC. (CDM INC.) USA. (Now CDM Smith Inc. USA)
Working as QA/QC Engineer on USAID funded projects in AZAD JAMMU KASHMIR
CLIENT : USAID
CONTRACTOR : CAMP DRESSER MCKEE CONSTRUCTORS INC. (CDM INC.)
WORKED AS : QA/QC Engineer
DUTIES INCLUDED:
1. Reconstruction of Hospitals and Schools in earthquake hit areas.
2. Supervised all construction activities.
3. Checking & Verification of layouts.
4. Verification of bar bending schedules.
5. Performed FDT’s, Testing of coarse & fine aggregates & concrete testing.
6. Verification of interim payment certificates.
7. High quality finishing works.
8. Worked as per ASTM standards & specifications. etc.
9. Followed all the HSE Standards.
May 2007 to January 2009
CONSULTANTS : MANGLA JOINT VENTURE (MJV)
CLIENT : WAPDA
CONTRACTORS : CHINA INTERNATIONAL WATER AND ELECTRIC
CORPORATION (CWE) CHINA
DESCON PAKISTAN
DUTIES INCLUDED :
Worked As Site Inspector on Mangla Dam Raising Project, responsible for Geo Investigation & construction supervision with Mangla Joint Venture which is a consortium of International Consultants like National Engineering Services Pakistan (NESPAK) PVT. LTD. Associated Consulting Engineers (ACE) Pvt. LTD., BARQAAB, Black & Veatch (UK) and Montgomery Watson Harza (MWH) (USA).
The project consists of 9m raising of existing dyke / embankment of Main dam, Sukian dyke, Jari dam, & Rim works, Main & Emergency Spillways, head works and construction of Mirpur bypass road.
After raising 9 meter it can store an additional water capacity of 2.88 MAF with annual power generation of 644 GWh.
Mass concrete pouring of Main & Emergency Spillways. (Like Roller Compacted Concrete)
Concrete Pouring of Sewerage Treatment Plant (Different Components like grit channel, Settlement Tanks, Sludge drying beds, & Chlorination Tanks.)
Earthwork of Embankment section with different zoning fills (Rip Rap, Washed Gravel, Gravel Fill, Coarse Filter, Fine Filter, Silt, Clay, Fine Filter, Coarse filter Random Fill, Free Draining Gravel, Etc.)
Testing of embankment materials (Like FDT’s with sand Replacement & Water Replacement and Gradations)
Nov. 2004 to Feb. 2007
Punjab Engineering Design & Supervision Consultants (P.E.D.C)
Inspector (Civil) with P.E.D.C
A JOINT VENTURE OF NESPAK (Pvt.) Ltd. Lahore. & N.D.C. (Pvt.) Ltd. Lahore
Rehabilitation & remodeling of Railway Line alongside Chanel.
Worked as Site Inspector for National Drainage Program (NDP) on Mega Project Rehabilitation of Lower Chennab Canal System (Part-A) in Development circle of Faisalabad Zone of Punjab Irrigation & Power Department. Mega Project is a JBIC loan funded program.
Supervised all construction activities of Earth Work including raising and strengthening of channel banks, channel Lining, stone pitching/bank protection of critical reaches, constructing of all Bridges, cattle bath stations.
Construction of all hydraulic structures including Head Regulators, Construction Supervision of six No. Post Tensioned Bridges on UGB channel.
Verification of billing invoices (IPC’s) of contractor. Technical correspondence with Client, Contractor and Design Section. Updating the progress reports of the project and complete coordination and implementation of all quality control procedure.
Worked with NESPAK on the Following Projects;
Feb. 2000 to Sep. 2004
National Engineering Services Pakistan (NESPAK) Pvt. Ltd. SITE INSPECTOR
Construction of Sher-e-Bengal Housing Compound Phase-I at Lahore. (Units: 471 No.S)
Duties Included:
Surveying & Layouts.
Working out all Quantities as required at site & for Invoice Verifications
Construction of Single storey Apartments with high quality finishing.
Construction of all Infrastructure works like Roads, Water supply system, Sewerage system, Overhead Water Tanks etc.
Testing of all materials like FDT’s, concrete testing etc.
Construction of 504 Nos. Multi storey flats (Apartments) at Sialkot (Pakistan).
Surveying & Layouts.
Worked as Quantity Surveyor
Construction of Multi-storied Apartments with high quality finishing.
Construction of all Infrastructure works like Roads, Water supply system, Sewerage system, Overhead Water Tanks etc.
Testing of all materials like FDT’s, Concrete Testing etc.
Construction of Sewerage Disposal Station with fixing of its Mechanical Components
Construction of schools at Gulshan Labor Colony Gujranwala.
Independently control the entire Project its Construction, Testing & IPC Verification etc.
Languages
English: Excellent in speaking, reading and writing
(Test of English as Foreign Language TOEFL Computer based test (CBT) Score=217/300).
English: Excellent in speaking, reading and writing.
Urdu: Excellent in speaking, reading and writing.
Punjabi: Excellent in speaking, reading and writing
Arabic: Can understand and speak