Egypt based Mechanical Engineer looking globally

Available
Serial No: 16094
Skills keywords: 
Current location:  Egypt - View on map
Nationality: Egyptian
Spoken languages: Arabic, english

Qualifications

Al Azhar University – Faculty of Engineering –  Class of 2006
Bachelor of Science in Mechanical Power Engineering

Career Summary

Lead Mechanical Construction Engineer – PhPC / BP Egypt JV
From February 2012 to Present

Working in West Harbour Expansion (WHX) project, a brown and green field gas processing facility project.

Key Responsibilities:

• Assembly and installation of all Mechanical items on site, this included a 10 MW Gas turbine and compressor packages, all auxiliary pumps, a new Fire Water tank, a new condensate tank and a large number of pressure vessels and drums.

• Evaluating, organizing and prioritizing work within the overall project schedule & Budget.

• Managing and supervising the site engineers and supervisors to control the site work.

• Following up the delivery of the resources requested for successful accomplishment of work

• To ensure all relevant safety objectives and legal requirements are observed.

• Follow up fabrication and erection of pipe and pipe support during a total plant shutdown.

• Attend final inspections of complete works, hydro test, and reinstatement of the work.

• To convene and attend meetings concerning project construction Management matters as appropriate.

• Monitors construction progress on a daily, weekly and monthly basis and provides input to the regular reports of the Project Manager.

Mechanical Construction & Operation Engineer – ALSTOM Egypt
From November 2010- till February 2012

Working in Kuriemat Power Station III – Combined Cycle 750 MW power plant.

Key Responsibilities:

• Working ALSTOM team during overhaul of steam turbine and manager/controller of required manpower

• Follow up dismantling all the machinery parts (HP,IP,LP) steam turbine

• Visual check for the dismantling parts

• Supervise de-blading and re-blading of (HP, IP, and LP) rotor and stationary blades, cleaning, marking, and replacing the dismantling damage parts

• Reassembly the steam turbine according to client recommendations

• Applying the approved operation procedures for systems start up and shut down.

• Track and monitor operation conditions for the unit during commissioning, reliability and normal operation through ALASPA P320 system.

Mechanical Piping & Construction Engineer – KAHROMIKA
From August 2008- till November 2010

Project: EL-Kuriemat Power Station (Nominal Combined Cycle 1 X 750 MW).

Main contractor: CP105 Contract (INITEC & CMI). CP106 Contract (INITEC & ALSTOM).

Consultant: PGESCO {Power Generation Engineering and Services Company}.

Key Responsibilities:

• .Review and study all isometric and drawing

• Prepare the material request & material for fabrication

• Follow up the fabrication and installation of critical and non-critical piping, pipe supports and calibrate all pipe supports.

• Follow up the erection of condenser and heavy equipment skids

• Review for all activities to be in schedule date.

• Determine priority for activities and prepare the progress site reports.

• Installation of heavy equipment and skids

• Supervise hydro test, flushing, chemical cleaning and steam blow for piping systems and reinstatement

• Conduct system walk-downs to identify and log defects and rectification measures in a punch list

• Participate in monthly progress meetings, site progress meetings, etc.

Mechanical Piping & Construction Engineer – KAHROMIKA
From April 2007 till August 2008

Project: EL-Kuriemat Power Station (Combined Cycle 2 X 750 MW).

Main contractor: Skoda & CMI consortium.

Consultant: PGESCO {Power Generation Engineering and Services Company}.

Key Responsibilities:

• Supervising the fabrication and installation of critical and non-critical pipe , pipe supports and other mechanical activities according to client requirements as in drawings and specifications, and Calibration and adjustment all critical pipe supports

• Produced the Punch List and control closing all items from it, and Submits to Client already clear Test Pack for official finally inspection.

• Follow up hydro test, flushing, acid cleaning and reinstatement of systems.

• walk down and handover all systems with consultant and owner

Maintenance & Workshop Engineer – KAHROMIKA
From October 2006 till April 2007

Key Responsibilities:

• Spare parts list reviewing with equipment sectional drawings against contract requirements.

• Preparing and applying periodic maintenance plans according to O&M manuals.

• Preparing the lists of consumables as gaskets, oils and greases…etc. according recommendations.

• Studying, selection, approval and taking over of general maintenance tools and workshop equipment.

LANGUAGE SKILLS:

• Arabic (mother tongue).
• Fluent in English ( Very Good)






popup-img