Electrical Electronics Engineer avaliable in Dubai

Available
Serial No: 55690
Skills keywords: commissioning electrical, control systems, electrical maintenance

List Of Qualifications & Related Skills:

Bachelor’s Degree, BS Electronics Engineering, CGPA (3.00/4.00)
Sir Syed University of Engineering & Technology
2011-2014

Intermediate, Pre-Engineering, A Grade
Adamjee Govt. Science College
2009-2010

Matric, Computer Science, A-1 Grade
Programmer School
2002-2008

Hafiz-e-QURAN
Iqra Rozat-ul-Atfal, Wafaq-ul-Madaris
1998-2001

Previous Employment Details:

Karsaz (Pvt.) Ltd.
Field Service Engineer (Electrical & Electronics)
May 2015-Present

Engineering & operational services Provider Company in the field of industrial, safety & security equipment. Karsaz represents world renowned manufacturers of cargo handling and security equipment in Pakistan.

JOB RESPONSIBILITIES:

 Worked as a Service Engineer, responsible for the engineering services on the different sites project.

 Responsible for the day-to-day planning, management and control of multiple projects.

 Execution and planning of commissioning and handing over activity of equipment.

 Provide training to clients related to safety, operation and maintenance of equipment.

 Supervising, executing and maintaining record of repair, service and preventative maintenance of equipment.

 Maintained a system of Warranty Claims and communicate with OEMs to compensate for any components or systems shortfalls in reliability or design efficiency.

 Help prevent harm to workers, property, the environment, and the general public during installation and maintenance activities.

 Troubleshooting of electrical & electronic systems.

Hands on experience on: (not limited to)

 Mobile Crane RTG & Elevated Work Platforms.

 Port Container Empty Handlers and Yard Tractors.

 Skid Steer Loaders.

 X-ray scanning machines & Explosive Trace Detectors.

PROJECT ENGINEER:

Worked at Gwadar Port with ZPMC Chinese & SriLankan in the project execution for recovering container handling equipment.
The Project duration was about 04 months. I was involved and carried out the duties & responsibilities mentioned below.

 Preparation of Standard of Procedures for certain calibrations and tests on PCs & RTGs.

 Managed all project-related correspondence, documents & planned resources to meet project goals.

 Made necessary arrangement to ensure a safety environment within work site.

 Carried out insulation resistance tests and connectivity tests for all motors, transformers and primary cables of both PC and RTG.

 Engaged with FUJI F70 series PLC wiring, testing & troubleshooting and identified communication errors trough T-
Link between PLC and drives.

 Testing and troubleshooting FUJI FREENIC 5000V series invertors.

 Maintained an effective inventory management system in order to ensure the availability of tools, parts and consumables within the budgeted limits.

 Conducted regular meetings with the clients and company coworkers in order to obtain a smooth project flow.

Culligan Water of Pakistan
Internee
March 2015 - April 2015

JOB RESPONSIBILITIES:

 Supervised the maintenance department activities.

 Troubleshooting the machines if there is any problem and complaint from the operators.

 Preventive & planned maintenance of all machines related to electrical & pneumatic systems.

 Responsible for maintaining an inventory for the requirement of spare parts.

SIEMENS Pakistan
Internee
June 2014 - July 2014

INTERNSHIP IN TRANSFORMER DEPARTMENT AT SIEMENS PAKISTAN
u
In the Business Unit-TRANSFORMER, gained valuable experience by learning the flow of work and visited various departments, Production of Distribution & Power transformers, Designing, Sales & Marketing, Planning and Test field.