Professional Experience
Lead Auditor certificate (IRCA) N0: 1923718
Quality Management Systems Auditor/Lead Auditor ISO 9001:208 series
The course is certified by the international register of certified auditors (A17217) delivered by TŰV Rheiland Akademie GmbH.
Site manager :
COMPANIES’ representative associated with any Project Site Emergency Response activities as per the Project Emergency Response Procedures.
Monitoring of construction activities in compliance with construction schedule. Arrange weekly meetings with Contractor’s site management.
Management and coordination of site construction team members.
Monitor mechanical completion according to MC schedule, and prepare handover to Commissioning according mechanical completion schedule priorities.
QA/QC engineer:
Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system to provide assurance that integrity as built into the works/service being supplied contractors.
QC Supervisor & Team Leader for Multi-discipline inspectors:
I oversee my staff performing all of the major QC activities required per the contract documents, including surveillance activities as follow ;
Civil work
Structural steel erection.
Tanks erection and welding.
Piping fabrication and erection
Equipments installation.
Pipeline construction Supervisor
Piping installation Supervisor
Review of Mechanical Completion dossier Pre-commissioning & commissioning
Lead in piping & mechanical daily Walk Down inspection and perform the Punch-List
NDT Inspection
Conducting AUDIT and surveillance.
Pipeline Coating, Holiday Test & lowering inspector
Hydrostatic Testing Inspector
Quality inspector of pipe manufacturing
Welding inspection
Destructive control:
Mechanical tests
Chemical analysis
Non destructive tests
Automatic ultrasonic inspection
Magnetic inspection
mechanical officer of merchant Marine:
Conduct and maintenance of mean engine
Conduct and maintenance of auxiliary engine
Familiar with :
WinPCS procedure
Guidance on certificate procedure (GOC system)
ISO, API, ASME, ASTM, AWS, AWWA, ACI, NFPA, etc
Work with Algerian regulation of the apparatuses with gas pressure & steam pressure (decree 245 & 246).
Experience in both Green-Field & Brown-Field developments type.
March 2011 until June 2013 Society: Joint venture (BP, Statoil & Sonatrach)
Project: ISG construction department (KBA)
QA/QC engineer
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system to provide assurance that integrity as built into the works/service being supplied contractors
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• Extensive collaboration with contractor QA/QC site Manager, Initiate and answer Site Technical Queries (STQ) either at site level or through Engineering.
• Prepare Inspection &Test Plan (ITP).
• Prepare construction method statements.
• Actively participate in HSSE walk downs.
• Conduct Quality audits on Contractor works, Ensure detailed handover notes are prepared for Rota partner at the end of rotation
• Review of Mechanical Completion dossier Pre-commissioning & commissioning
Nov. 2009 until 30-11-2010 Society: Joint venture (BP, Statoil & Sonatrach)
Project: ISC compression project (TEG, REG, KBA)
Site manager
• Responsible for interface with ISG Operations management for all matters.
• COMPANIES’ representative associated with any Project Site Emergency Response activities as per the Project Emergency Response Procedures.
• Monitoring of construction activities in compliance with construction schedule. Arrange weekly meetings with Contractor’s site management.
• Management and coordination of site construction team members.
• Monitor mechanical completion according to MC schedule, progressing of A-check sheets and prepare handover to Commissioning according mechanical completion schedule priorities.
• Control of Work and attendance at the CONTRACTOR daily Permit to Work meeting.
June 2008 until 18-11-2009 Society: Joint venture (BP, Statoil & Sonatrach)
Project: ISC compression project (TEG, REG, KBA)
QA/QC Supervisor
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system to provide assurance that integrity as built into the works/service being supplied contractors
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• Extensive collaboration with contractor QA/QC site Manager, Initiate and answer Site Technical Queries (STQ) either at site level or through Engineering
• Actively participate in HSSE walk downs.
• Conduct Quality audits on Contractor works, Ensure detailed handover notes are prepared for Rota partner at the end of rotation.
Activities:
• Civil Work
• Piping
• Pipeline
• Welding work
• painting
• equipment
• coating
May 2006 until June -2008 Society: Consortium SAIPEM/SIEMENS
Project: SKB: Gas turbine central project of
Berrouaghia (From 400 to 500 MW approx).
QA/QC Supervisor
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system.
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• Initiate and answer Site Technical Queries (STQ) either at site level or through Engineering
I oversee my staff performing all of the major QC activities required per the contract documents, including surveillance activities as follow ;
Civil work
Structural steel erection.
Tanks erection and welding.
Piping fabrication and erection
Equipments installation
From 2005 To 2006 Society : BECHTEL
Project: SONAHESS (Gas compression & Reinjection facilities)
QA/QC Supervisor
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• I oversee my staff performing all of the major QC activities required per the contract documents, including surveillance
Activities
surveillance to verify the compliance of activities with the project specification requirements
Monitor the welding in accordance with WPS.
Developing the Inspections & Test plans.
Participating in The QC kick-off meeting.
Reviewing:
Specifications
Procedures
Reports & Subcontractor documents.
Directing & supervising the discipline of QC Inspectors in their daily work:
Tanks erection and welding.
Piping fabrication and erection
Fire water pipe construction
Metallic structural erection
Mechanical equipment erection.
Concrete work (pipe rack foundations)
Building work. (Foundation and pre-cast concrete)
From 2003 – 2004 Society: Consortium SAIPEM/ BUIGE OFFCHORE
Project: ROD/ BRN (integrated development project)
ALGERIA
Quality control supervisor
• Directing & supervising the discipline of QC Inspectors in their daily work:
Tanks erection and welding.
Piping fabrication and erection
Fire water pipe construction
Metallic structural erection
Mechanical equipment erection.
Concrete work (pipe rack foundations)
Building work. (Foundation and pre-cast concrete)
Educational Qualifications
Certificates
June 1980 Baccalaureate Technical Mathematics.
June 1987 merchant navy mechanical engineer diploma
May 2012 lead Auditor certificate (IRCA) N0: 1923718 Quality Management Systems Auditor/Lead Auditor ISO 9001:208 series
Oct 2001 Certificate of attendance from In Salah Gas in the followings courses:(Training in Bechtel camp- Algeria)
Inspection orientation programme.
Pipe mill Inspector programme.
Oct 2001 Certificate of achievement from In Salah Gas: (Training in Bechtel camp- Algeria)
Pipe Inspector (visual).
Welding Inspector.
Magnetic particle test inspector.
Mechanical testing.
Oct 1990 navigation certificate
Trainings
References
April 2012 TWI – Welding Inspector CSWIP 3.1
1. July 2012 . BS 33
2. Control of work.
3. Energy isolation.
Arabic: Good spoken & written
French: Good spoken & written
English: average spoken & good written ( Full understanding of written English
Computer skills – Excel, Word, Outlook & PowerPoint.
Driving
Professional Experience
Lead Auditor certificate (IRCA) N0: 1923718
Quality Management Systems Auditor/Lead Auditor ISO 9001:208 series
The course is certified by the international register of certified auditors (A17217) delivered by TŰV Rheiland Akademie GmbH.
Site manager :
COMPANIES’ representative associated with any Project Site Emergency Response activities as per the Project Emergency Response Procedures.
Monitoring of construction activities in compliance with construction schedule. Arrange weekly meetings with Contractor’s site management.
Management and coordination of site construction team members.
Monitor mechanical completion according to MC schedule, and prepare handover to Commissioning according mechanical completion schedule priorities.
QA/QC engineer:
Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system to provide assurance that integrity as built into the works/service being supplied contractors.
QC Supervisor & Team Leader for Multi-discipline inspectors:
I oversee my staff performing all of the major QC activities required per the contract documents, including surveillance activities as follow ;
Civil work
Structural steel erection.
Tanks erection and welding.
Piping fabrication and erection
Equipments installation.
Pipeline construction Supervisor
Piping installation Supervisor
Review of Mechanical Completion dossier Pre-commissioning & commissioning
Lead in piping & mechanical daily Walk Down inspection and perform the Punch-List
NDT Inspection
Conducting AUDIT and surveillance.
Pipeline Coating, Holiday Test & lowering inspector
Hydrostatic Testing Inspector
Quality inspector of pipe manufacturing
. Welding inspection
Destructive control:
Mechanical tests
Chemical analysis
Non destructive tests
Automatic ultrasonic inspection
Magnetic inspection
mechanical officer of merchant Marine:
Conduct and maintenance of mean engine
Conduct and maintenance of auxiliary engine
Familiar with :
WinPCS procedure
Guidance on certificate procedure (GOC system)
ISO, API, ASME, ASTM, AWS, AWWA, ACI, NFPA, etc
Work with Algerian regulation of the apparatuses with gas pressure & steam pressure (decree 245 & 246).
Experience in both Green-Field & Brown-Field developments type.
March 2011 until June 2013 Society: Joint venture (BP, Statoil & Sonatrach)
Project: ISG construction department (KBA)
QA/QC engineer
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system to provide assurance that integrity as built into the works/service being supplied contractors
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• Extensive collaboration with contractor QA/QC site Manager, Initiate and answer Site Technical Queries (STQ) either at site level or through Engineering.
• Prepare Inspection &Test Plan (ITP).
• Prepare construction method statements.
• Actively participate in HSSE walk downs.
• Conduct Quality audits on Contractor works, Ensure detailed handover notes are prepared for Rota partner at the end of rotation
• Review of Mechanical Completion dossier Pre-commissioning & commissioning
Nov. 2009 until 30-11-2010 Society: Joint venture (BP, Statoil & Sonatrach)
Project: ISC compression project (TEG, REG, KBA)
Site manager
• Responsible for interface with ISG Operations management for all matters.
• COMPANIES’ representative associated with any Project Site Emergency Response activities as per the Project Emergency Response Procedures.
• Monitoring of construction activities in compliance with construction schedule. Arrange weekly meetings with Contractor’s site management.
• Management and coordination of site construction team members.
• Monitor mechanical completion according to MC schedule, progressing of A-check sheets and prepare handover to Commissioning according mechanical completion schedule priorities.
• Control of Work and attendance at the CONTRACTOR daily Permit to Work meeting.
June 2008 until 18-11-2009 Society: Joint venture (BP, Statoil & Sonatrach)
Project: ISC compression project (TEG, REG, KBA)
QA/QC Supervisor
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system to provide assurance that integrity as built into the works/service being supplied contractors
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• Extensive collaboration with contractor QA/QC site Manager, Initiate and answer Site Technical Queries (STQ) either at site level or through Engineering
• Actively participate in HSSE walk downs.
• Conduct Quality audits on Contractor works, Ensure detailed handover notes are prepared for Rota partner at the end of rotation.
Activities:
• Civil Work
• Piping
• Pipeline
• Welding work
• painting
• equipment
• coating
May 2006 until June -2008 Society: Consortium SAIPEM/SIEMENS
Project: SKB: Gas turbine central project of
Berrouaghia (From 400 to 500 MW approx).
QA/QC Supervisor
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system.
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• Initiate and answer Site Technical Queries (STQ) either at site level or through Engineering
I oversee my staff performing all of the major QC activities required per the contract documents, including surveillance activities as follow ;
Civil work
Structural steel erection.
Tanks erection and welding.
Piping fabrication and erection
Equipments installation
From 2005 To 2006 Society : BECHTEL
Project: SONAHESS (Gas compression & Reinjection
facilities)
QA/QC Supervisor
• Manage all aspects of quality / Integrity of contractor produced works and maintain strong Quality system
• Ensure that all permanent materials are certified as required & meet the requirements of the required technical standards, ensure that all equipment, Electrical, Instrumentation & miscellaneous Civil Works are completed in accordance with the Project Specifications &acceptance of this work is adequately recorded, Ensure that records are kept to cover all pipes tracking data, weld in formation.
• I oversee my staff performing all of the major QC activities required per the contract documents, including surveillance
Activities
surveillance to verify the compliance of activities with the project specification requirements
Monitor the welding in accordance with WPS.
Developing the Inspections & Test plans.
Participating in The QC kick-off meeting.
Reviewing:
Specifications
Procedures
Reports & Subcontractor documents.
Directing & supervising the discipline of QC Inspectors in their daily work:
Tanks erection and welding.
Piping fabrication and erection
Fire water pipe construction
Metallic structural erection
Mechanical equipment erection.
Concrete work (pipe rack foundations)
Building work. (Foundation and pre-cast concrete)
From 2003 – 2004 Society: Consortium SAIPEM/ BUIGE OFFCHORE
Project: ROD/ BRN (integrated development project)
ALGERIA
Quality control supervisor
• Directing & supervising the discipline of QC Inspectors in their daily work:
Tanks erection and welding.
Piping fabrication and erection
Fire water pipe construction
Metallic structural erection
Mechanical equipment erection.
Concrete work (pipe rack foundations)
Building work. (Foundation and pre-cast concrete)
Oct 2001– Oct 2002 BECHTEL INTERNATIONAL INC – ALGERIA
IN SALAH GAS Project Algeria
Pipe Inspector at Pipe mill manufacturing:
Charged of:
Attend to the welders Qualification.
Welding inspection
Destructive control:
Mechanical tests
Chemical analysis
Non destructive tests
Automatic ultrasonic inspection
Visual and dimensional Inspection.
Weld radiograph Interpreter.
Magnetic particle Inspection.
From 1995 To 1999 society : Algeria Technical Control Engineering
(ATCE) for SONATRACH
Projects: pipe fabrication (GME, GR2, GK2).
Quality inspector of pipe manufacturing
Charged to inspect:
Welding inspection
Destructive control:
Mechanical tests
Chemical analysis
Non destructive tests
X-Ray
Magnetic particle
Ultra sonic inspection
Pipe Visual inspection
Coating inspection.
Base Pipe Visual inspection
From 1987-1995 society : SNTM-CNAN
mechanical officer of merchant Marine:
Conduct and maintenance of mean engine
Conduct and maintenance of auxiliary engine
Educational Qualifications
Certificates
June 1980 Baccalaureate Technical Mathematics.
June 1987 merchant navy mechanical engineer diploma
• May 2012 lead Auditor certificate (IRCA) N0: 1923718 Quality Management Systems Auditor/Lead Auditor ISO 9001:208 series
Oct 2001 Certificate of attendance from In Salah Gas in the followings courses:(Training in Bechtel camp- Algeria)
Inspection orientation programme.
Pipe mill Inspector programme.
Oct 2001 Certificate of achievement from In Salah Gas: (Training in Bechtel camp- Algeria)
Pipe Inspector (visual).
Welding Inspector.
Magnetic particle test inspector.
Mechanical testing.
Oct 1990 navigation certificate
Trainings
Knowledge
References
April 2012 TWI – Welding Inspector CSWIP 3.1
1. July 2012.
1. BS 33
2. Control of work.
3. Energy isolation.
2. December 2011.
1. Radio film interpretation level 2 training
3. October 2010
1. leader ship training
Arabic: Good spoken & written
French: Good spoken & written
English: average spoken & good written ( Full understanding of written English
Computer skills – Excel, Word, Outlook & PowerPoint.
Driving
•